Environmental Permit No.
FEP-02/075/2000
環境許可證編號FEP-02/075/2000
ENVIRONMENTAL IMPACT
ASSESSMENT ORDINANCE
(CHAPTER 499)
環境影響評估條例
(第499章)
第10及12條
ENVIRONMENTAL PERMIT TO OPERATE A DESIGNATED PROJECT
營辦指定工程項目的環境許可證
PART A (
MAIN PERMIT )
Pursuant to Sections 10 and 12 of the
Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental
Protection (the Director) grants this environmental permit to the DRAINAGE
SERVICES DEPARTMENT (hereinafter referred to as the “Permit Holder”) to
operate the designated project described in Part B subject to the conditions specified in Part C.
The issue of this environmental permit is based on the documents,
approvals or permissions described below :
根據《環境影響評估條例》(環評條例)第10及12條的規定,環境保護署署長(署長)將本環境許可證批予渠務署(下稱 “許可證持有人”)以營辦B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證是依據下列文件、批准或許可而簽發:
|
Application No. 申請書編號 |
FEP-077/2007
|
|
||
|
Document
in the Register 登記冊上的文件 |
1. Yuen Long Bypass Floodway Feasibility
Study Final EIA Study Report,
Executive Summary and Final Environmental Monitoring & Audit Manual
(Register No. AEIAR-003/1998) [ Hereinafter referred to as
“the EIA Report” ] 元朗排水繞道可行性研究 - 最後環評研究報告、行政摘要及最後環境監察及審核手冊(登記冊編號:AEIAR-003/1998) [下稱"環評報告"] 2. Yuen Long Bypass Floodway Feasibility
Study Reassessment of Ecological
Mitigation Measures Final Report [
Hereinafter referred to as “the Ecological Reassessment Report” ] 元朗排水繞道可行性研究 - 重新評估生態緩解措施最後報告 [下稱"生態重估報告"] 3.
Application for Environmental Permit dated 18 July 2000
(Application No. : AEP-075/2000) for construction and operation of the
designated project 於二OOO年七月十八日提交的環境許可證申請文件(申請書編號:AEP-075/2000)為建造及營辦指定工程項目 |
|
||
|
|
4. Environmental Permit
( No. EP-075/2000 ) issued on 16 August 2000 於二OOO年八月十六日簽發的環境許可證(編號EP-075/2000) 5. Application
for Further Environmental Permit dated 10 January 2003 (Application No. : FEP-060/2003) for construction of the
designated project 於二OO三年一月十日提交的新的環境許可證申請文件(申請書編號
: FEP-060/2003)為建造指定工程項目 6.
Environmental Permit (No. FEP-01/075/2003) issued on 6 February 2003 於二OO三年二月六日簽發的環境許可證(編號FEP-01/075/2003) 7. Application
for Variation of an Environmental Permit dated 22 April 2003 (Application No.
: VEP-093/2003) for construction of the designated project 於二OO三年四月二十二日提交的更改環境許可證申請文件(申請書編號
: VEP-093/2003)為建造指定工程項目 8.
Environmental Permit
(No. EP-01/075/2003/A) issued on 19 May 2003 於二OO三年五月十九日簽發的環境許可證(編號EP-01/075/2003/A) 9. Application for
Further Environmental Permit dated 26 March 2007 (Application No. : FEP-077/2007) for operation of the
designated project 於二OO七年三月二十六日提交的新的環境許可證申請文件(申請書編號
: FEP-077/2007)為營辦指定工程項目 |
|
||
|
April 2007 |
|
|
|||
|
Date 日期 |
|
(WONG
Hon-meng) Principal Environmental Protection
Officer (Strategic Assessment) for
Director of Environmental Protection 環境保護署署長 ( 首席環境保護主任(策略評估)黄漢明代行
) |
|||
PART B ( DESCRIPTIONS OF DESIGNATED PROJECT )
Hereunder
is the description of the designated project mentioned in Part A of this
environmental permit ( hereinafter referred to as “the Permit” ) :
下列為本新的環境許可證( 下稱“許可證”)A部所提述的指定工程項目的說明:
|
Title of Designated Project 指定工程項目的名稱 |
Yuen Long Bypass Floodway [ Hereinafter referred
to as “the Project” ] 元朗排水繞道 [下稱“工程項目”] |
|
Nature of Designated Project 指定工程項目的性質 |
Waterways and drainage works 水道及排水工程 |
|
Location of Designated Project 指定工程項目的地點 |