Environmental Permit No. EP-01-097/2001/C

環境許可證編號  EP-01-097/2001/C

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

Section 10, 12 & 13

 

環境影響評估條例

(第499章)

101213

 

ENVIRONMENTAL PERMIT TO OPERATE A DESIGNATED PROJECT

 

營辦指定工程項目的環境許可證

 

PART A (MAIN PERMIT)

A許可證主要部分

 

Pursuant to Sections 10 and 12 of the Environmental Impact Assessment Ordinance (the EIAO), the Director of Environmental Protection (the Director) granted the Further Environmental Permit (FEP-01/097/2001/B) to the Hongkong International Theme Parks Limited (hereinafter referred to as the “Permit Holder”) on 20 July 2005. Pursuant to Section 13 of the Ordinance, the Director amends the Further Environmental Permit (FEP-01/097/2001/B) based on the Application No. VEP-199/2005. The amendments, described below, is incorporated into this Environmental Permit (EP-01/097/2001/C). This Environmental Permit as amended is for the operation of the designated project described in Part B subject to the conditions specified in Part C. The issue of this Environmental Permit is based on the documents, approvals or permissions described below:

 

根據【環境影響評估條例】(條例)第10條及12條的規定,環境保護署署長(署長)於2005720日將新的環境許可證(編號FEP-01/097/2001/B)批予Hongkong International Theme Parks Limited(下稱許可證持有人)。根據條例第13條的規定,署長因應更改環境許可證的申請編號VEP-199/2005 修訂新的環境許可證編號FEP-01/097/2001/B。以下修訂已包含在本環境許可證(編號EP-01/097/2001/C)內。本經修訂的環境許可證可作為營辦本許可證B所列明的指定工程項目,但須遵守C所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據:

 



Application No.

申請書編號

VEP-199/2005

 

Document in the Register:

登記冊上的文件:

(1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

 

Environmental Impact Assessment – Construction of an International Theme Park in Penny’s Bay of North Lantau and its Essential Associated Infrastructures

- Final EIA Report

- Annex (Volume 1)

- Annex (Volume 2)

- Annex (Volume 3)

- Executive Summary

(Register No.: AEIAR-032/2000) [Hereinafter referred to as the EIA Report]

北大嶼山竹篙灣國際主題公園及有關主要基礎設施建造工程 - 環境影響評估:

-          最終環境影響評估報告

-          附件 (第一冊)

-          附件 (第二冊)

-          附件 (第三冊)

-         

(登記冊編號: AEIAR-032/2000) [下稱環評報告”]

 

The Director’s letter of approval of the EIA Report dated 28 April 2000, ref: (53) in Annex (3) to EP2/N9/O/65 III.

環境保護署署長於2000428日發出批准環評報告的信件 (檔案編號: (53) in Annex (3) to EP2/N9/O/65 III)

 

Document in the Register:

登記冊上的文件:

 

(3)

 

 

 

 

 

(4)

 

 

(5)

 

 

 

 

 

(6)

 

 

(7)

 

 

 

 

 

(8)

 

 

 

(9)

Application documents for Variation of an Environmental Permit including all attachments submitted by CED on 19 December 2002. (Application No. VEP-081/2002)

土木工程署 2002 12 19日提交更改環境許可證申請文件包括所有附件 (申請書編號VEP-081/2002)

 

Environmental Permit issued on 13 January 2003 (Permit No. EP-097/2001/B)

2003113日發出的環境許可證(許可證編號:EP-097/2001/B)

 

Application documents for Variation of an Environmental Permit including all attachments submitted by CED on 8 March 2003. (Application No. VEP-087/2003)

土木工程署 2003 3 8日提交更改環境許可證申請文件包括所有附件 (申請書編號VEP-087/2003)

 

Environmental Permit issued on 31 March 2003 (Permit No. EP-138/2002/C)

2003331日發出的環境許可證(許可證編號:EP-138/2002/C)

 

Application documents for Further Environmental Permit including all attachments submitted by the Permit Holder on 22 June 2005 (Application No. FEP-067/2005)

許可證持有人於2005622日提交新的環境許可證申請文件包括所有附件(申請書編號:FEP-067/2005)

 

Further Environmental Permit No. FEP-01/097/2001/B issued on 20 July 2005

2005720日發出的新的環境許可證(許可證編號:FEP-01/097/2001/B)

 

Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 21 September 2005 (Application No. VEP-199/2005)

許可證持有人於2005921日提交更改環境許可證申請文件包括所有附件(申請書編號:VEP-199/2005)

 

 

Application No.

申請編號

Date of Application

申請日期

List of Amendments Incorporated into this Environmental Permit

已包含在本環境許可證內的修訂項目

Date of Amendments

修訂日期

 

VEP-199/2005

21 September 2005

2005921

Vary condition 3.8 in Part C of Further Environmental Permit No. FEP-01/097/2001/B

更改新的環境許可證編號 (FEP-01/097/2001/B) C3.8項條件

19 October 2005

20051019

 

 

 

 

 

 

 

19 October 2005

 

 

 

 

 

 

 

 

Date

日期

 

(Simon Y. M. HUI)

Principal Environmental Protection Officer

(Regional Assessment)

for Director of Environmental Protection

環境保護署署長

(首席環境保護主任(區域評估)許一鳴代行)


PART B (DESCRIPTIONS OF DESIGNATED PROJECT)

B部(指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the “Permit”):

下列為本環境許可證(下稱許可證A所提述的指定工程項目的說明:

 

 

Title of Designated Project

指定工程項目的名稱

Water Recreation Centre at Penny’s Bay

[This designated project is hereinafter referred to as “the Project”]

竹篙灣水上康樂中心[本指定工程項目下稱工程項目”]

 

Nature of Designated Project
指定工程項目的性質

Operation of an amusement park with a site area of more than 20 ha in size

營辦一個場地面積超過20公頃的遊樂公園

 

Location of Designated Project

指定工程項目的地點

Penny’s Bay, Lantau. The location of the Project is shown in Figure 1 attached to this Permit

大嶼山竹篙灣。工程項目的地點如本環境許可證內1所示

 

Scale and Scope of Designated Project(s)

指定工程項目的規模和範圍

Operation of an approximately 32 ha water recreation centre with a 12 ha multi-function artificial lake, water-based and land-based recreational facilities and ancillary facilities

營辦一個面積約32公頃的水上康樂中心,當中包括一個面積約12公頃的多用途人工湖、水上和陸上康樂設施和附屬設施

 

 

 


C (許可證條件)



1.