A部(許可證主要部分)
Pursuant to Sections 10 and
12 of the Environmental Impact Assessment Ordinance (the EIAO), the Director
of Environmental Protection (the Director) granted the Further Environmental
Permit (FEP-01/097/2001/B) to the Hongkong International
Theme Parks Limited (hereinafter referred to as the “Permit Holder”) on 20 July 2005.
Pursuant to Section 13 of the Ordinance, the Director amends the Further Environmental
Permit (FEP-01/097/2001/B) based on the Application No. VEP-199/2005. The
amendments, described below, is incorporated into this Environmental Permit
(EP-01/097/2001/C). This Environmental Permit as amended is for the operation
of the designated project described in Part B subject
to the conditions specified in Part C. The issue of this
Environmental Permit is based on the documents, approvals or permissions described
below:
根據【環境影響評估條例】(條例)第10條及12條的規定,環境保護署署長(署長)於2005年7月20日將新的環境許可證(編號FEP-01/097/2001/B)批予Hongkong International Theme Parks Limited(下稱”許可證持有人”)。根據條例第13條的規定,署長因應更改環境許可證的申請編號VEP-199/2005 修訂新的環境許可證編號FEP-01/097/2001/B。以下修訂已包含在本環境許可證(編號EP-01/097/2001/C)內。本經修訂的環境許可證可作為營辦本許可證B部所列明的指定工程項目,但須遵守C部所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據:
Application No. 申請書編號 |
VEP-199/2005 |
|
|
Document in the Register: 登記冊上的文件: |
(1) (2) |
Environmental Impact Assessment – Construction of an
- Final EIA Report - Annex (Volume 1) - Annex (Volume 2) - Annex (Volume 3) - Executive Summary (Register No.: AEIAR-032/2000) [Hereinafter referred
to as the EIA Report] 北大嶼山竹篙灣國際主題公園及有關主要基礎設施建造工程 - 環境影響評估: -
最終環境影響評估報告 -
附件 (第一冊) -
附件 (第二冊) -
附件 (第三冊) -
摘 要 (登記冊編號: AEIAR-032/2000) [下稱”環評報告”] The Director’s letter of approval of the EIA Report
dated 28 April 2000, ref: (53) in Annex (3) to EP2/N9/O/65 III. 環境保護署署長於2000年4月28日發出批准環評報告的信件 (檔案編號: (53) in Annex
(3) to EP2/N9/O/65 III) |
|
Document in the Register: 登記冊上的文件: |
(3) (4) (5) (6) (7) (8) (9) |
Application documents for Variation of an
Environmental Permit including all attachments submitted by CED on 19
December 2002. (Application No. VEP-081/2002) 土木工程署於 2002年 12月 19日提交的更改環境許可證申請文件包括所有附件 (申請書編號VEP-081/2002) Environmental Permit issued on 13 January 2003
(Permit No. EP-097/2001/B) 於2003年1月13日發出的環境許可證(許可證編號:EP-097/2001/B) Application documents for Variation of an
Environmental Permit including all attachments submitted by CED on 8 March
2003. (Application No. VEP-087/2003) 土木工程署於 2003年 3月 8日提交的更改環境許可證申請文件包括所有附件 (申請書編號VEP-087/2003) Environmental Permit issued on 31 March 2003 (Permit
No. EP-138/2002/C) 於2003年3月31日發出的環境許可證(許可證編號:EP-138/2002/C) Application documents for Further Environmental
Permit including all attachments submitted by the Permit Holder on 22 June
2005 (Application No. FEP-067/2005) 許可證持有人於2005年6月22日提交的新的環境許可證申請文件包括所有附件(申請書編號:FEP-067/2005) Further Environmental Permit No. FEP-01/097/2001/B
issued on 20 July 2005 於2005年7月20日發出的新的環境許可證(許可證編號:FEP-01/097/2001/B) Application documents for Variation of Environmental
Permit including all attachments submitted by the Permit Holder on 21
September 2005 (Application No. VEP-199/2005) 許可證持有人於2005年9月21日提交的更改環境許可證申請文件包括所有附件(申請書編號:VEP-199/2005) |
|
Application No. 申請編號 |
Date of Application 申請日期 |
List of Amendments Incorporated
into this Environmental Permit 已包含在本環境許可證內的修訂項目 |
Date of Amendments 修訂日期 |
|
VEP-199/2005 |
21 September 2005 2005年9月21日 |
Vary condition 3.8 in
Part C of Further Environmental Permit No. FEP-01/097/2001/B |
19 October 2005 2005年10月19日 |
|
19 October 2005 |
|
|
|
Date 日期 |
|
(Simon Y. M. HUI) Principal Environmental Protection Officer (Regional Assessment) for Director of Environmental Protection 環境保護署署長 (首席環境保護主任(區域評估)許一鳴代行) |
PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B部(指定工程項目的說明)
Hereunder is the description of the designated project mentioned in Part
A of this environmental permit (hereinafter referred to as the “Permit”):
下列為本環境許可證(下稱 “許可證”)A部所提述的指定工程項目的說明:
|
Title
of Designated Project 指定工程項目的名稱 |
Water
Recreation Centre at Penny’s Bay [This designated project
is hereinafter referred to as “the Project”] 竹篙灣水上康樂中心[本指定工程項目下稱“工程項目”] |
|
Nature of Designated
Project |
Operation of an amusement
park with a site area of more than 20 ha in size 營辦一個場地面積超過20公頃的遊樂公園 |
|
Location
of Designated Project 指定工程項目的地點 |
Penny’s
Bay, Lantau. The location of the Project is shown in Figure
1 attached to this Permit |
|
Scale and Scope of Designated Project(s) 指定工程項目的規模和範圍 |
Operation
of an approximately 32 ha water recreation centre with a 12 ha multi-function
artificial lake, water-based and land-based recreational facilities and
ancillary facilities 營辦一個面積約32公頃的水上康樂中心,當中包括一個面積約12公頃的多用途人工湖、水上和陸上康樂設施和附屬設施 |