Monthly Update of Documents Uploaded

 

    Documents Uploaded to the EIAO Website

   (for the period between 16 November 2021 to 15 December 2021)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

Nil

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-287/2021

Removal of 132kV Overhead Line and Pylons for P-Line

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir287/dir287.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-271/2021

Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns

EIA Reports Approved

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2712021.pdf

 

 

EIA-274/2021

Mai Po Nature Reserve Infrastructure Upgrade Project

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2742021/Content%20Page.html

 

 

Application for Environmental Permit

 

 

AEP-601/2021

Desilting Works at Pui O River

Environmental Permit issued (EP-601/2021)

https://www.epd.gov.hk/eia/register/permit/latest/ep6012021.htm

 

 

AEP-602/2021

Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns

Environmental Permit issued (EP-602/2021)

https://www.epd.gov.hk/eia/register/permit/latest/ep6022021.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-600/2021

Sludge Treatment Facilities

Environmental Permit issued (EP-334/2009/F)

https://www.epd.gov.hk/eia/register/permit/latest/vep6002021.htm

 

 

 

VEP-601/2021

Sludge Treatment Facilities

Environmental Permit issued (FEP-01/334/2009/F)

https://www.epd.gov.hk/eia/register/permit/latest/vep6012021.htm

 

 

 

VEP-602/2021

Yuen Long Nullah Revitalisation / decking along Kung Um Road and Kiu Hing Road for Housing Sites in Yuen Long South

Environmental Permit issued (EP-553/2008/A)

https://www.epd.gov.hk/eia/register/permit/latest/vep6022021.htm

 

 

 

VEP-603/2021

Fill Bank at Tseung Kwan O Area 137

Environmental Permit issued (EP-134/2002/O)

https://www.epd.gov.hk/eia/register/permit/latest/vep6032021.htm

 

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-457/2013/D

Central Kowloon Route - Central Tunnel (HY/2018/08)

Certification of Construction Noise Mitigation Measure Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly Operational Phase Environmental Monitoring and Audit Report No. 5

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-505/2015/A

Chai Wan Government Complex and Vehicle Depot

Baseline Monitoring Report (Rev 1)

https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html

 

 

 

 

 

 

EP-581/2020

Airport City Link

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5812020_content.html

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Emergency Contingency Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2002 to Mar 2003) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2003 to Mar 2004) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2004 to Mar 2005) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2005 to Mar 2006) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2006 to Mar 2007) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2007 to Mar 2008)

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2008 to Mar 2009) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2009 to Mar 2010) 

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2010 to Mar 2011)

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2011 to Mar 2012)

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

EP-014/1998/A 

Outlying Islands Transfer Facilities at Sok Kwu Wan

Annual Environmental Audit ReportOperation(Apr 2012 to Mar 2013)

https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html

 

 

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Baseline Monitoring Report

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Detailed Design of Siu Hang San Tsuen Watercourse

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-505/2015/A

Chai Wan Government Complex and Vehicle Depot

Construction Noise Management Plan (Rev E)

https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800MW Gas-Fired Power Station at Lamma Extension

Waste Management Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-555/2018/A

New Wang Tong River Bridge

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report(Aug 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report(Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.70

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.23 (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/353/2009/K

Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok

Construction Phase Monthly EM&A Report No. 1 (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html

 

 

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

                                                               

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-488/2014/A

Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A ReportOct 2021

https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

194th Monthly EM&A Report (12 Oct 2021 – 11 Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Oct 2021)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Oct 2021) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.40(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Oct 2021) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

EP-456/2013/B

Drainage Improvement Works at Ngong Ping

Monthly Environmental Monitoring And Audit Report (Oct 2021)DC/2019/06

https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html

 

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report (Oct 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Quality EM&A Report (Aug 2021 to Sep 2021)

                                                                                        

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly Progress Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-seventh Monthly EM&A Report  (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 194)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 195)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

 

 

 

 

- North District

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

 

EP-324/2008/E            

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2020 - Sep 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

EP-324/2008/E            

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Aug 2021- Sep 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

EP-324/2008/E            

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2020 - Sep 2021) (HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Oct 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Quarterly EM&A Report (Aug 2021 to Oct 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Aug 2021) (Version 3)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Sep 2021) (Version 3)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

- Sai Kung District

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Quarterly Environmental Monitoring and Audit Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.34(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.34(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3082008_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3082008_content.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Oct 2021)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Quality EM&A Report (Jun 2021 to Aug 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Monthly EM&A ReportOct 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Oct 2021) (V.1)

https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJan 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportFeb 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportMar 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportApr 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportMay 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJun 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJul 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportAug 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportSep 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportOct 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportNov 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportDec 2014

https://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJan 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportFeb 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportMar 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportApr 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportMay 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJun 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportJul 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportAug 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportSep 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportOct 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportNov 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

EP-428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

Monthly EM&A ReportDec 2014

https://www.epd.gov.hk/eia/english/register/index8/vep3642012_content.html

 

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.68

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

 

- Tai Po District

 

 

EP-324/2008/E  

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2020 - Sep 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E  

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Aug 2021- Sep 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

EP-324/2008/E  

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2020 - Sep 2021) (HY/2012/06) 

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Oct 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Quarterly Environmental Monitoring And Audit Report (Aug 2021 to Oct 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.70

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.23 (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-seventh Monthly EM&A Report  (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Tuen Mun District

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly EM&A Report(May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.70

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.23 (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.40(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report (Oct 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.59

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.59

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

 

 

 

 

FEP-04/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.59

https://www.epd.gov.hk/eia/english/register/index7/fep2062021_content.html

 

 

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

EP-565/2019

Yuen Long Effluent Polishing Plant

Monthly EM&A ReportOct 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html

 

 

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Quarterly EM&A Report (Aug 2021 to Oct 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

 

 

- Kwai Tsing District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-541/2017/A

Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Monthly EM&A ReportOct 2021

https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html

 

 

 

 

 

 

- Central & Western District

 

 

EP-122/2002/E

Central Reclamation Phase III

Quarterly EM&A Report (Aug 2021 to Oct 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

 

 

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May 2021 to Jul 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/15)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Tunnel Work

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

EP-122/2002/E

Central Reclamation Phase III

Quarterly EM&A Report (Aug 2021 to Oct 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May 2021 to Jul 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/15)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Tunnel Work

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

- Eastern District

 

 

EP-122/2002/E

Central Reclamation Phase III

Quarterly EM&A Report (Aug 2021 to Oct 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May 2021 to Jul 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Oct 2021)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.34(Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3082008_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3082008_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/15)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Tunnel Work

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

- Southern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.49

http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jun 2021 to Aug 2021)(HK/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Sep 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Oct 2021)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Oct 2021) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Oct 2021) (ED/2018/05)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Quarterly EM&A Report (Apr 2021 to Jun 2021)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Aug 2021)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Sep 2021)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly Audit Report No. 13

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Sep 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Sep 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Final EM&A Review Report (Feb 2016 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Quarterly EM&A Report (Dec 2020 to Mar 2021)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Quarterly EM&A Report (Aug 2021 to Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.46

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html