Monthly Update of Documents Uploaded

 

    Documents Uploaded to the EIAO Website

   (for the period between 16 November 2022 to 15 December 2022)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

Nil

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

Nil

 

 

Application for Approval of EIA Report

 

 

EIA-285/2022

Improvement of Lion Rock Tunnel

EIA Reports Approved

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2852022.pdf

 

 

EIA-286/2022

Upgrading of Tai Po Sewage Treatment Works

EIA Reports Approved

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2862022.pdf

 

 

 

 

 

 

EIA-287/2022

Revitalisation of Fo Tan Nullah

EIA Reports Approved

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2872022.pdf

 

 

 

 

 

 

EIA-288/2022

Establishment of Fish Culture Zone at Wong Chuk Kok Hoi

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2882022/0549925_AFCD-New-FCZs_WCKH-EIA-index.htm

 

 

 

 

 

 

EIA-289/2022

Establishment of Fish Culture Zone at Outer Tap Mun

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2892022/0549925_AFCD-New-FCZs_OTM-EIA-index.htm

 

 

 

 

 

 

EIA-290/2022

Establishment of Fish Culture Zone at Mirs Bay

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2902022/0549925_AFCD-New-FCZs_MB-EIA-index.htm

 

 

 

 

 

 

EIA-291/2022

Establishment of Fish Culture Zone at Po Toi (Southeast)

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2912022/0549925_AFCD-New-FCZs_PT-EIA-index.htm

 

 

 

 

 

 

Application for Environmental Permit

 

 

AEP-616/2022

Revitalisation of Fo Tan Nullah

Environmental Permit issued (EP-616/2022)

https://www.epd.gov.hk/eia/register/permit/latest/ep6162022.htm

 

 

AEP-619/2022

New Contaminated Sediment Disposal Facility to the West of Lamma Island

Environmental Permit issued (EP-619/2022)

https://www.epd.gov.hk/eia/register/permit/latest/ep6192022.htm

 

 

 

 

 

 

AEP-620/2022

Improvement of Lion Rock Tunnel

Environmental Permit issued (EP-620/2022)

https://www.epd.gov.hk/eia/register/permit/latest/ep6202022.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-622/2022

West Rail, Phase I

Environmental Permit issued (FEP-24/004/1998/K)

 https://www.epd.gov.hk/eia/register/permit/latest/vep6222022.htm

 

 

 

Application for Further Environmental Permit

 

 

FEP-212/2022

Shuen Wan Golf Course

Environmental Permit issued (FEP-01/571/2019)

https://www.epd.gov.hk/eia/register/permit/latest/fep2122022.htm

 

 

FEP-213/2022

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Environmental Permit issued (FEP-04/376/2009)

https://www.epd.gov.hk/eia/register/permit/latest/fep2132022.htm

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-009/1998/I

Widening of Tolo Highway between Island House Interchange and Ma Liu shui Interchange

Noise Mitigation Plan Revision 2 (October 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5342017_content.html

 

 

 

 

FEP-06/129/2002/I

Sheung Shui to Lok Ma Chau Spur Line

Project Layout Plan of Kwu Tung Station

https://www.epd.gov.hk/eia/english/register/index8/vep6042021_content.html

 

 

 

 

FEP-02/353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Landscape and Visual Plan (Jul 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep2032020_content.html

 

 

 

 

 

 

EP-292/2007

North East New Territories (NENT) Landfill Extension

Detailed Landfill Gas Hazard Assessment Report Rev.2

https://www.epd.gov.hk/eia/english/register/aep/ep2922007_content.html

 

 

 

 

 

FEP-01/292/2007

North East New Territories (NENT) Landfill Extension

Detailed Landfill Gas Hazard Assessment Report Rev.2

https://www.epd.gov.hk/eia/english/register/index7/fep2102022_content.html

 

 

 

 

 

EP-451/2013

Trunk Road T2

Landscape Mitigation Plan (Rev. F)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

 

 

 

 

EP-210/2005/E

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Annual Air Quality Management Plan 2022

https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Emergency Response Plan for the Subsea Gas Pipeline for Black Point Power Station (BPPS) and the Associated Gas Receiving Station in BPPS(Rev.3)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-482/2013/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Air Quality Monitoring Plan(Revision 1)

https://www.epd.gov.hk/eia/english/register/index8/vep5732020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Safety Management Plan for the Subsea Gas Pipeline for Black Point Power Station (BPPS) and the Associated Gas Receiving Station in BPPS(Rev.2)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-595/2021

Asia Direct Cable System - Hong Kong Segment (ADC-HK) - Chung Hom Kok

Verification of As-built Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5952021_content.html

 

 

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Bi-annual Report on EM&A Results on Ecological Aspects (Nov 2021 to Apr 2022)(Rev A)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-581/2020

Airport City Link

Construction Phase Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5812020_content.html

 

 

 

 

 

 

EP-207/2005/A

Siu Ho Wan Water Treatment Works Extension

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5962021_content.html

 

 

 

 

 

 

EP-207/2005/A

Siu Ho Wan Water Treatment Works Extension

2nd Quarterly Environmental Monitoring And Audit Report (Aug to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5962021_content.html

 

 

 

 

 

 

EP-555/2018/A

New Wang Tong River Bridge

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-555/2018/A

New Wang Tong River Bridge

Quarterly EM&A Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

5th EM&A Report(Oct 2022)(HY/2021/13)    

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (Oct 2022)(DC/2016/01)(HY/2012/07)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

4th EM&A Report(Sep 2022)(HY/2021/13)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

18th EM&A Report(Sep 2022)  

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

17th EM&A Report(Aug 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Sep 2022) (Tung Chung East)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Oct 2022) (Tung Chung East) 

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Oct 2022) (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

 

EP-600/2022

Re-provision of Open Cycle Gas Turbines at Lamma Power Station

Monthly Environmental Monitoring & Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep6002021_content.html

 

 

 

 

 

 

EP-488/2014/A

Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 207)

https://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.82

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Eighty-ninth Monthly EM&A ReportOct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

FEP-01/353/2009/K

Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok

Construction Phase Monthly EM&A Report No. 13 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html

 

 

 

 

 

 

FEP-01/353/2009/K

Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok

Construction Phase Quarterly EM&A Report No. 4 (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html

 

 

 

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Oct 2022) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

206th Monthly EM&A Report (12 Oct 2022 – 11 Nov 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L12 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring And Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Oct 2022) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Oct 2022)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.52(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.52(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-456/2013/B

Drainage Improvement Works at Ngong Ping

Monthly Environmental Monitoring And Audit Report (Oct 2022)DC/2019/06

https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html

 

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Oct 2022)Rev.A)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Quarterly EM&A Report (Jul to Sep 2022) 

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

- North District

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

 

EP-466/2013/A

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6192022_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

 

EP-470/2013/A

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Quarterly EM&A Report(Mar 2022 to May 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Oct 2022)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Quarterly EM&A Report (Aug 2022 to Oct 2022)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 


EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling disclaimers

Final EM&A Report Review (Nov 2013 - Sep 2021)(CV/2012/09) (Rev.2)

https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

 

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Final EM&A Review Report (Nov 2013 - Sep 2021)(CV/2012/09) (Rev.2)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

- Sai Kung District

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A ReportOct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

16th Quarterly EM&A Report(May 2022 to Jul 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Oct 2022)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Mar 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-134/2002/O

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html

 

 

 

 

 

 

EP-134/2002/O

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Mar 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html

 

 

 

 

 

 

EP-134/2002/O

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Feb 2022) Revised Appendices

https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html

 

 

 

 

 

 

EP-134/2002/O

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Jan 2022) Revised Appendices

https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html

 

 

 

 

 

 

EP-134/2002/O

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Dec 2021)Revised Appendices

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Sep 2021)Revised

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Oct 2021)Revised

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Nov 2021)Revised

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Oct 2022) (V.1)

https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Quarterly EM&A Report (Aug 2022 to Oct 2022) (version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2022)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.80

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-345/2009/A

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

38th Monthly EM&A Report (Rev. 2)(Aug 2022)(DC/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html

 

 

 

 

 

 

EP-345/2009/A

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

40th Monthly EM&A Report (Rev. 0)(Oct 2022)(DC/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html

 

 

 

 

 

 

EP-345/2009/A

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

37th Monthly EM&A Report (Rev. 1)(Jul 2022)(DC/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html

 

 

 

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

 

EP-533/2017/A

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6182022_content.html

 

 

 

 

 

 

- Tai Po District

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Monthly EM&A ReportSep 2022)(V3

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Quarterly EM&A ReportFeb 2022 to Apr 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Quarterly EM&A ReportMay 2022 to Jul 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

 

EP-466/2013/A

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6192022_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

 

EP-470/2013/A

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

 

 


EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling disclaimers

Final EM&A Report Review (Nov 2013 - Sep 2021)(CV/2012/09) (Rev.2)

https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

 

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Final EM&A Review Report (Nov 2013 - Sep 2021)(CV/2012/09) (Rev.2)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

- Tsuen Wan District

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.82

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Eighty-ninth Monthly EM&A ReportOct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

- Tuen Mun District

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.52(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.52(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.82

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Annual Environmental Monitoring and Audit (EM&A) Review Report(Oct 2021 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-210/2005/E

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report(Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html

 

 

 

 

 

 

EP-210/2005/E

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html

 

 

 

 

 

 

EP-507/2016/D

Additional Gas-fired Generation Units Project

Monthly EM&A Report no.71

https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html

 

 

 

 

 

 

FEP-04/507/2016/D

Additional Gas-fired Generation Units Project - Installation of one additional gas-fired generation unit (CCGT unit No. 2) at the Black Point Power

Monthly EM&A Report no.71

https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

5th EM&A Report(Oct 2022)(HY/2021/13)     

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (Oct 2022)(DC/2016/01)(HY/2012/07)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

4th EM&A Report(Sep 2022)(HY/2021/13)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

18th EM&A Report(Sep 2022)  

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

17th EM&A Report(Aug 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

EP-565/2019

Yuen Long Effluent Polishing Plant

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html

 

 

 

 

EP-594/2021

Installation of the Proposed 132kV Cable Circuits Connecting with Ho To West Substation and Existing 132kV Fanling to Mai Po Cable Circuits

Monthly Environmental Monitoring & Audit Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5942021_content.html

 

 

 

 

 

 

EP-311/2008

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Quarterly EM&A Report(Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep3112008_content.html

 

 

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Quarterly EM&A Report(Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

- Kwai Tsing District

 

 

EP-541/2017/A

Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html

 

 

 

 

 

 

- Central & Western District

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)V0-0)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report No.22 (Oct 2022)V0-0)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report No.22 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report No.22 (Oct 2022)V0-0)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report No.22 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)V0-0)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

EP-603/2022

Removal of 132kV Overhead Line and Pylons for P-Line

Monthly Audit Report No. 6 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

- Eastern District

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Quarterly EM&A Report (Aug 2022 to Oct 2022) (version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2022)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Oct 2022)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report No.22 (Oct 2022)V0-0)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

 

FEP-07/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2022)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

 

 

EP-603/2022

Removal of 132kV Overhead Line and Pylons for P-Line

Monthly Audit Report No. 6 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html

 

 

 

 

 

 

- Southern District

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Operation Phase Monthly EM&A ReportOct 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Quarterly EM&A Report (Aug 2022 to Oct 2022) (version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2022)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-603/2022

Removal of 132kV Overhead Line and Pylons for P-Line

Monthly Audit Report No. 6 (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2022 to Sep 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2022 to Jun 2022)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Oct 2022)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Quarterly EM&A Report (Apr 2022 to Jun 2022)(ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Oct 2022) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-445/2013/B

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Oct 2022) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html

 

 

 

 

 

 

EP-445/2013/B

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Oct 2022)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html

 

 

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2022 to Sep 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2022 to Jun 2022)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Quarterly EM&A Report (Aug 2022 to Oct 2022) (version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Oct 2022)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

- Sham Shui Po District

 

 

Nil

 

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2022)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2022 to Sep 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2022 to Jun 2022)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Jul 2022 to Sep 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.57

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html

 

 

 

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Quarterly EM&A Report (Aug 2022 to Oct 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Oct 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Oct 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Oct 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html