Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 January 2021 to 15 February 2021)

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

Application for EIA Study Brief

 

ESB-337/2020

Road P1 (Tai Ho - Sunny Bay Section), Lantau

Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-337.pdf

 

ESB-338/2021

Improvement to So Kwun Po Interchange

Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-338.pdf

 

Application for Permission to Apply Directly for Environmental Permit

 

DIR-281/2021

Desilting Works at River Silver, Mui Wo

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir281/dir281.pdf

 

DIR-282/2021

Sewage Pumping Station for Public Housing Development at Long Bin in Yuen Long

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir282/dir282.pdf

 

Application for Approval of EIA Report

 

Nil

 

Application for Environmental Permit

 

AEP-585/2021

Sewage Pumping Stations at North East New Territories

Environmental Permit issued (EP-585/2021)

https://www.epd.gov.hk/eia/register/permit/latest/ep5852021.htm

 

Application for Variation of an Environmental Permit

 

VEP-587/2020

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Environmental Permit issued (FEP-03/558/2018/A)

https://www.epd.gov.hk/eia/register/permit/latest/vep5872020.htm

 

Application for Further Environmental Permit

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Addendum to Silt Curtain Deployment Plan

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Revised Pipeline Laying Method Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Pipeline Construction Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

EP-482/2013/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Investigation Report for Breakdown of Tunnel Ventilation System at Middle Ventilation Building

https://www.epd.gov.hk/eia/english/register/index8/vep5732020_content.html

 

 

 

EP-482/2013/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Investigation Report for Breakdown of Tunnel Ventilation System at West Ventilation Building & Middle Ventilation Building

https://www.epd.gov.hk/eia/english/register/index8/vep5732020_content.html

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Detailed Vegatation Survey Report (Version 9.2)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Protection and Transplantation Proposal (Version 8.2)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

Island District

Central & Western District

 

 

 

North District

Wan Chai District

 

 

 

Sai Kung District

Eastern District

 

 

 

Sha Tin District

Southern District

 

 

 

Tai Po District

Kowloon City District

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

- Island District

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Quarterly EM&A Report (Jun 2020 to Aug 2020)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Dec 2020)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Final EM&A Review Report (Mar 2012 to Apr 2018) (HY/2010/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

FEP-03/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 185)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Dec 2020) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.30(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

10th Quarterly EM&A Report(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.31(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Final EM&A Review Report (Mar 2012 to Apr 2018) (HY/2010/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2013/12)  

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2017/10)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report(HY/2012/08)(Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.60

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Updated Environmental Monitoring and Audit Manual

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.19 (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

184th Monthly EM&A Report (12 Dec 2020 to 11 Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-seventh Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-eighth Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

EP-354/2009/B

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report(HY/2012/08)(Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html

 

 

 

EP-354/2009/C

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report(HY/2012/08)(Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4562014_content.html

 

 

 

 

 

EP-353/2009/K

 Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Dec 2020) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

- North District

 

FEP-02/474/2013               

 Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

FEP-02/474/2013               

 Shek Wu Hui Effluent Polishing Plant

Quarterly EM&A Report(Oct 2020 to Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

FEP-01/460/2013

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html

 

 

 

EP-329/2009 

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monitoring Report for Wetland Compensation Area(No.3) (Dec 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Dec 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Jan 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2020)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Nov 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jan 2021)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

EP-450/2013/A

 Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

 

- Sai Kung District

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Dec 2020) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

29th Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Dec 2020)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.24 (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

      

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

- Sha Tin District

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.58

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Quarterly EM&A Report (Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

EP-345/2009/A

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

18th Monthly EM&A Report(Rev.1)

https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html

 

 

 

EP-345/2009/A

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

19th Monthly EM&A Report(Rev.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html

 

 

 

 

- Tai Po District

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2020)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Nov 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jan 2021)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Monthly EM&A Report(Sep 2020) (CV/2012/05)v3

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

- Tsuen Wan District

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Dec 2020)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.60

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Updated Environmental Monitoring and Audit Manual

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.19 (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-seventh Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-eighth Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

- Tuen Mun District

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

FEP-03/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Final EM&A Review Report (Mar 2012 to Apr 2018) (HY/2010/02)           

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2013/12)   

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report(HY/2012/08)(Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/C

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report(HY/2012/08)(Jun 2020 to Aug 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4562014_content.html

 

EP-226/2005/F

Development of an EcoPark in Tuen Mun Area 38

Quarterly Environmental Monitoring and Audit Report (Oct to Dec 2020) 

https://www.epd.gov.hk/eia/english/register/index8/vep5482018_content.html

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.30(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

10th Quarterly EM&A Report(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.31(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.49

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

      

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.50

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

      

 

EP-534/2017

Site Formati3on and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

EP-534/2017/A

 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

FEP-01/534/2017/A

 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.60

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Updated Environmental Monitoring and Audit Manual

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.19 (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2020)(HY/2017/10)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.49

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.50

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

- Yuen Long District

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report (Dec 2020) 

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

- Kwai Tsing District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

- Central & Western District

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-408/2011/C

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Wan Chai District

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

- Eastern District

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Sep 2020 to Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Dec 2020)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Dec 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

- Southern District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.39

http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

- Kowloon City District

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2020 to Sep 2020)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Dec 2020)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly EM&A Report(Oct 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly EM&A Report(Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Dec 2020)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Dec 2020)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Nov 2020)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Dec 2020) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Quarterly EM&A Report (Jul 2020 to Sep 2020)(ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Dec 2020)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Oct 2020 to Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Dec 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Dec 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

- Kwun Tong District

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2020 to Sep 2020)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Dec 2020)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Oct 2020 to Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Dec 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Dec 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

- Sham Shui Po District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

- Wong Tai Sin District

 

EP-337/2009        

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Final Monthly EM&A Report (KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Dec 2020)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2020 to Sep 2020)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Dec 2020)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

EP-544/2017

Kai Tak Sports Park

Quarterly EM&A Report (Oct 2020 to Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

- Yau Tsim Mong District

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

EP-455/2013

Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec 0)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Dec (HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Dec 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Dec 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

EP-523/2016         

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.36

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html