Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

        (for the period between 16 December 2020 to 15 January 2021)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-336/2020

Upgrading of Nim Wan Road (North)

Study Briefs

https://www.epd.gov.hk/eia/register/study/latest/esb-336.pdf

 

 

ESB-337/2020

Road P1 (Tai Ho - Sunny Bay Section), Lantau

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb337/esb337.pdf

 

 

ESB-338/2021

Improvement to So Kwun Po Interchange

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb338/esb338.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-280/2020

Sewage Pumping Stations at North East New Territories

Decisions of the DEP

https://www.epd.gov.hk/eia/register/permission/conditions/dir2802020.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-264/2020

Pier Improvement at Lai Chi Wo

Approval Conditions

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2642020.pdf

 

 

EIA-265/2020

Pier Improvement at Tung Ping Chau

Approval Conditions

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2652020.pdf

 

 

EIA-266/2020

A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area

Approval Conditions

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2662020.pdf

 

 

EIA-267/2020

Revised Austin Road Flyover

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2672020/Index.htm

 

 

Application for Environmental Permit

 

 

AEP-579/2020

A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area

Environmental Permit issued (EP-579/2020)

https://www.epd.gov.hk/eia/register/permit/latest/ep5792020.htm

 

 

AEP-583/2020

Drainage Improvement Works at Nam Wa Po

Environmental Permit issued (EP-583/2020)

https://www.epd.gov.hk/eia/register/permit/latest/ep5832020.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-585/2020

New Wang Tong River Bridge

Environmental Permit issued (EP-555/2018/A)

https://www.epd.gov.hk/eia/register/permit/latest/vep5852020.htm

 

 

VEP-586/2020

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Environmental Permit issued (FEP-02/558/2018/A)

https://www.epd.gov.hk/eia/register/permit/latest/vep5862020.htm

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Proposed Fine Adjustment for Kowloon City Baptist Church Hay Nien Primary School

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Supplementary Contamina Assessment Plan for the existing DSD staff quarter (revision 2.1)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

EP-456/2013/A

Drainage Improvement Works at Ngong Ping

Floral Transplantation Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

Silt Curtain and Cofferdam Deployment Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

Landscape and Visual Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

EP-313/2008/J

West Island Line

Method Statement for the removal for 714 site office area

https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

 

 

 

 

EP-313/2008/J

West Island Line

Sampling and Testing Report in Works Area B

https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

 

 

 

 

EP-313/2008/J

West Island Line

Sampling and Testing proposal for the general fill in Works Area B

https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

 

 

 

 

EP-555/2018/A

New Wang Tong River Bridge

Breeding Bird Survey Report

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

EP-456/2013/A

Drainage Improvement Works at Ngong Ping

Aquatic Fauna Translocation Plan(Rev.H)

https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html

 

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Silt Curtain Deployment Plan(Rev7)

https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Silt curtain deployment plan(Rev8)

https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

 

FEP-02/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Silt Curtain Deployment Plan

https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

Construction Works Schedule and Location Plans

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Submission Additional Mitigation Plan for Slip Road 8 (Revision 7)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

 

EP-404/2011/D         

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Ecological Monitoring Report for the Woodland Compensation Area (Sep to Nov 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

FEP-01/381/2009

Tuen Mun Area 54 Sewage Pumping Station

Operation Phase Final Odour Impact Monitoring Report

https://www.epd.gov.hk/eia/english/register/index7/fep1812018_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Schedule of Submissions for Environmental Permit

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Submission of Layout Plans

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Nov 2020) (HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Final Environmental Monitoring and Audit Report(HY/2012/07) 

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Nov 2020) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

FEP-01/558/2018

/ FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html

 

 

FEP-02/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html

 

 

FEP-03/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 184)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Nov 2020) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.29(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-02/131/2002

Low-level Radioactive Waste Storage Facility

5th EM&A Report(Operation Phase)

https://www.epd.gov.hk/eia/english/register/index7/fep1632015_content.html

 

 

 

 

EP-248/2006

Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html

 

 

 

 

EP-287/2007

Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2012/08) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Final Environmental Monitoring and Audit Report(HY/2012/07) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2013/12) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2017/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.59

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Quality EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

183th Monthly EM&A Report (12 Nov 2020 to 11 Dec 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-sixth Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

22nd Quarterly EM&A Summary Report (Sep 2020 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

EP-519/2016 

Tung Chung New Town Extension

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

EP-519/2016 

Tung Chung New Town Extension

Monthly EM&A Report(Oct 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

- North District

 

 

FEP-02/474/2013               

 Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

EP-534/2017/A

 

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

FEP-01/534/2017/A

 

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

FEP-01/460/2013

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-404/2011/D         

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monitoring Report for Wetland Compensation Area(No.2) (Nov 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

EP-404/2011/D         

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monitoring Report for Wetland Compensation Area(No.1) (Oct 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

EP-404/2011/D         

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Quarterly EM&A Report (Aug 2020 to Oct 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Nov 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Aug 2020 - Oct 2020) (HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2019 - Oct 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Nov 2020)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Quarterly EM&A Report(Sep 2020 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Quarterly EM&A Report (Oct 2020 to Dec 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-450/2013/A

 Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

 

- Sai Kung District

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Quarterly EM&A Report No.3(Sep 2020 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Nov 2020) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

28th Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Nov 2020)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Quarterly EM&A Report (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.19 (Jul 2020)(v1)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.20 (Aug 2020)(v1)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.23 (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

EP-438/2012/K

 

Shatin to Central Link - Tai Wai to Hung Hom Section

 

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment   Works - South Works

Monthly EM&A Report No.57

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Quarterly EM&A Report (Dec 2019 to Feb 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

EP-345/2009

  Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

17th Monthly EM&A Report(Rev.1)

https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Quaterly Environmental Monitoring and Audit Summary Report (Sep 2020 - Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Update EM&A Manual

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

- Tai Po District

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Aug 2020 - Oct 2020) (HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Report (Nov 2019 - Oct 2020)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Nov 2020)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Monthly EM&A Report(Sep 2020) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Nov 2020)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.59

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Sixty-sixth Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

22nd Quarterly EM&A Summary Report (Sep 2020 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

- Tuen Mun District

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2012/08) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2017/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Final Environmental Monitoring and Audit Report(HY/2012/07) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2020)(HY/2013/12) 

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.29(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.48

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.48

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

 

FEP-01/558/2018

/ FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html

 

 

 

 

FEP-02/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html

 

 

 

 

FEP-03/558/2018

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html

 

 

 

 

EP-534/2017

Site Formati3on and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

EP-534/2017/A

 

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

FEP-01/534/2017/A

 

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.59

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report (Nov 2020) 

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

- Kwai Tsing District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

- Central & Western District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-408/2011/C

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Eastern District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Nov 2020) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

FEP-07/364/2009/H

 Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

FEP-11/364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Nov 2020)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2020)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Southern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-287/2007

Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jul 2020 to Sep 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html

 

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.38

http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Quarterly EM&A Report (Sep 2020 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Oct 2020)(ED/2018/04)(Version 1.2)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Nov 2020) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Nov 2020)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly EM&A Report(Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Nov 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

EP-438/2012/K

 

Shatin to Central Link - Tai Wai to Hung Hom Section

 

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

EP-437/2012/A

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2020)

http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

      

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Nov 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2020)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2020) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

EP-438/2012/K

 

Shatin to Central Link - Tai Wai to Hung Hom Section

 

Monthly EM&A Report (Nov 2020)

 

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

EP-455/2013

Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/02)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Nov 2020)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2020)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Nov 2020)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

EP-437/2012/A

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Nov 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html