Monthly Update of Documents Uploaded

 

    Documents Uploaded to the EIAO Website

   (for the period between 15 December 2021 to 15 January 2022)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-349/2021

Reclamation for Kau Yi Chau Artificial Islands

Study Briefs

https://www.epd.gov.hk/eia/register/study/latest/esb-349.pdf

 

 

ESB-350/2021

Kau Yi Chau Artificial Islands Development

Study Briefs

https://www.epd.gov.hk/eia/register/study/latest/esb-350.pdf

 

 

ESB-351/2021

Hong Kong Island - Northeast Lantau Link

Study Briefs

https://www.epd.gov.hk/eia/register/study/latest/esb-351.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-287/2021

Removal of 132kV Overhead Line and Pylons for P-Line

Decisions of the DEP

https://www.epd.gov.hk/eia/register/permission/conditions/dir2872021.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-276/2021

Re-provision of Open Cycle Gas Turbines at Lamma Power Station

EIA Reports

https://www.epd.gov.hk/eia/register/report/eiareport/eia_2762021/0576490_HKE-LPS-OCGT_EIA-index.htm

 

 

Application for Environmental Permit

 

 

Nil

 

 

Application for Variation of an Environmental Permit

 

 

VEP-604/2021

Sheung Shui to Lok Ma Chau Spur Line

Environmental Permit issued (FEP-06/129/2002/I)

https://www.epd.gov.hk/eia/register/permit/latest/vep6042021.htm

 

 

 

VEP-605/2021

Additional Gas-fired Generation Units Project

Environmental Permit issued (EP-507/2016/D)

https://www.epd.gov.hk/eia/register/permit/latest/vep6052021.htm

 

 

 

VEP-606/2021

Additional Gas-fired Generation Units Project - Installation of one additional gas-fired generation unit (CCGT unit No. 2) at the Black Point Power Station

Environmental Permit issued (FEP-04/507/2016/D)

https://www.epd.gov.hk/eia/register/permit/latest/vep6062021.htm

 

 

 

VEP-607/2021

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Environmental Permit issued (EP-210/2005/E)

https://www.epd.gov.hk/eia/register/permit/latest/vep6072021.htm

 

 

 

VEP-608/2021

Demolition of buildings and structures in the proposed Kennedy Town Comprehensive Development Area Site

Environmental Permit issued (EP-136/2002/F)

https://www.epd.gov.hk/eia/register/permit/latest/vep6082021.htm

 

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-519/2016

Tung Chung New Town Extension

Habitat Enhancement and Translocation Plan for Amphibian Species of Conservation Importance

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Operation Phase Monthly EM&A ReportNov 2021

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013

NENT - Sewage Pumping Stations in Fanling North New Development Area (FLNDA)

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4762013_content.html

 

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Baseline Monitoring Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Baseline Monitoring ReportOct 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly Operational Airborne Rail Noise Monitoring Report (Wing Fung Building) No.5

https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Waste Management PlanDec 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Construction Noise Mitigation Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Construction Works Phasing Schedule

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Detailed Proposal on Enhancement of Air Quality Monitoring in Cheung Chau (Rev. M)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Detailed Proposal on Enhancement of Air Quality Monitoring in Cheung Chau (Rev. M)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-249/2006/D

Repositioning and Long Term Operation Plan of Ocean Park

Noise Mitigation Audit Report (NMAR) for the Special Event at the Summit (Phase 2 : Operation hour 09:00-01:00)

https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html

 

 

 

 

 

 

EP-249/2006/D

Repositioning and Long Term Operation Plan of Ocean Park

Noise Mitigation Audit Plan (NMAP) for the Special Event at the Summit
(Phase 2 : Operation hour 09:00-01:00)

https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html

 

 

 

 

 

 

EP-226/2005/G

Development of an EcoPark in Tuen Mun Area 38

Technical Note for Extension of Boiler Operation Hours at Lot P4 at Eco Park from 1 Jan 2022 to 31 Dec 2023

https://www.epd.gov.hk/eia/english/register/index8/vep5882021_content.html

 

 

 

 

 

 

EP-226/2005/F

Development of an EcoPark in Tuen Mun Area 38

Technical Note for Extension of Boiler Operation Hours at Lot P4 at Eco Park from 1 Jan 2022 to 31 Dec 2023

https://www.epd.gov.hk/eia/english/register/index8/vep5482018_content.html

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

Silt Curtain and Cofferdam Deployment Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Ecological Mitigation/ Habitat Creation and Management Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Alternative Air Quality Monitoring Location Proposal

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800MW Gas-Fired Power Station at Lamma Extension

Waste Management Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Baseline Monitoring Report  (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Coral Translocation Plan(Version 5.0)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Method Statement for Construction of Submarine Outfall and Diffuser Cofferdam

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-555/2018/A

New Wang Tong River Bridge

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-248/2006

Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html

 

 

 

 

 

 

EP-287/2007

Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jul 2021 to Sep 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Nov 2021) (Tung Chung East)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Nov 2021) (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.71

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-538/2017

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html

 

 

 

 

 

 

FEP-01/353/2009/K

Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok

Construction Phase Monthly EM&A Report No. 2 (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html

 

 

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

                                                               

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

EP-488/2014/A

Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A ReportNov 2021

https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

195th Monthly EM&A Report (12 Nov 2021 – 11 Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Nov 2021)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Nov 2021) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.41(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.41(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

13th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

13th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Nov 2021) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

EP-456/2013/B

Drainage Improvement Works at Ngong Ping

Monthly Environmental Monitoring And Audit Report (Nov 2021)DC/2019/06

https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html

 

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report (Nov 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly Progress Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-eighth Monthly EM&A Report  (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 196)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

 

 

 

 

- North District

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Quarterly EM&A Report(Sep 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Nov 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Nov 2021) (Version 3)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

- Sai Kung District

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.35(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.35(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Nov 2021)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

39th Monthly EM&A Report (Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

12th Quarterly EM&A Report(May 2021 to Jul 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Monthly EM&A ReportNov 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Nov 2021) (V.1)

https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.69

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Quarterly EM&A Report (Sep 2021 to Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

 

- Tai Po District

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Nov 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.71

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-eighth Monthly EM&A Report  (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Tuen Mun District

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.71

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.41(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.41(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

13th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

13th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report (Nov 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Quarterly EM&A Report No.20

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Quarterly EM&A Report No.20

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

 

 

 

 

FEP-04/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Quarterly EM&A Report No.20

https://www.epd.gov.hk/eia/english/register/index7/fep2062021_content.html

 

 

 

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.60

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.60

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

 

 

 

 

FEP-04/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.60

https://www.epd.gov.hk/eia/english/register/index7/fep2062021_content.html

 

 

 

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.61

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

 

 

FEP-04/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.61

https://www.epd.gov.hk/eia/english/register/index7/fep2062021_content.html

 

 

 

 

 

 

 

EP-507/2016/D

Additional Gas-fired Generation Units Project

Monthly EM&A Report no.61

https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html

 

 

 

 

 

 

 

FEP-04/507/2016/D

Additional Gas-fired Generation Units Project - Installation of one additional gas-fired generation unit (CCGT unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.61

https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html

 

 

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

EP-565/2019

Yuen Long Effluent Polishing Plant

Monthly EM&A ReportNov 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html

 

 

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report No.54 (Oct 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly Operational Phase Environmental Monitoring and Audit Report No. 6

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

 

 

- Kwai Tsing District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-541/2017/A

Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Monthly EM&A ReportNov 2021

https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html

 

 

 

 

 

 

- Central & Western District

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

EP-376/2009      

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

- Eastern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Nov 2021)(HY/2019/18) 

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-505/2015/A

Chai Wan Government Complex and Vehicle Depot

First Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Nov 2021)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Nov 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.35(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 

- Southern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.50

http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

EP-249/2006/D

Repositioning and Long Term Operation Plan of Ocean Park

6th Monthly Noise Monitoring Report (Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2021 to Sep 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Nov 2021)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Nov 2021) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Nov 2021) (ED/2018/05)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Quarterly EM&A Report (Apr 2021 to Jun 2021)(ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly Audit Report No. 14

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2021 to Sep 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Nov 2021)Version 1.0)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Apr 2021 to Jun 2021)(ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jul 2021 to Sep 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.47

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East (HY/2014/08)

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html

 

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Nov 2021)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Nov 2021)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html