Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 May 2019 to 15 June 2019)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-316/2019

Revised Austin Road Flyover

Study Briefs

https://www.epd.gov.hk/eia/register/study/latest/esb-316.pdf

 

 

ESB-317/2019

Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb317/esb317.pdf

 

 

ESB-318/2019

Technical Study on Partial Development of Fanling Golf Course Site – Feasibility Study

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb318/esb318.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-267/2019

Site Investigation Works for Pier Improvement at Lai Chi Wo

Approval Condition

https://www.epd.gov.hk/eia/register/permission/conditions/dir2672019.pdf

 

 

DIR-268/2019

TKO Connect Cable System

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir268/dir268.pdf

 

 

Application for Approval of EIA Report

 

 

Nil

 

 

Application for Environmental Permit

 

 

Nil

 

 

Application for Variation of an Environmental Permit

 

 

VEP-561/2019

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Environmental Permit issued (EP-364/2009/F)

https://www.epd.gov.hk/eia/register/permit/latest/vep5612019.htm

 

 

VEP-562/2019

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Environmental Permit issued (FEP-07/364/2009/F)

https://www.epd.gov.hk/eia/register/permit/latest/vep5622019.htm

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Contamination Assessment Plan (CAP) - Potentially Contaminated Site at SRC-1

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Contamination Assessment Plan (CAP) - Potentially Contaminated Site at SRC-1

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-210/2005/C

 Expansion and Extension of Fill Bank at Tuen Mun Area 38

First Annual Air Quality Impact Assessment Review

https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly Progress Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

EP-345/2009

Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

Water Quality Monitoring Location (Rev.3)

https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html

 

 

 

 

EP-454/2013

Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area

Submission of Environmental Impact Monitoring Report(Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html

 

 

 

 

EP-454/2013

Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area

Submission of Environmental Impact Monitoring Report(Mar 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html

 

 

 

 

EP-482/2013/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Partial Submission of revised Air Purification System (APS) Commissioning Test Report

https://www.epd.gov.hk/eia/english/register/index8/vep5112016_content.html

 

 

 

 

EP-482/2013/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Submission of Revised Air Purification System (APS) Commissioning Test Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5112016_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Revised Transplantation Proposal

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Transplantation Completion Report

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Preliminary Plan for Measures to Mitigate Traffic Noise from Ma On Sha Road

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

PROPOSAL FOR USING DIRECT READING DUST METER FOR CONSTRUCTION PHASE AIR MONITORING

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Vegetation Survey Report and Transplantation Proposal

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

 

 

EP-071/2000/C 

1,800MW Gas-Fired Power Station at Lamma Extension

Waste Management Plan

https://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html 

 

 

 

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Air Quality Management Plan (West Ventilation Building)

https://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

164th Monthly EM&A Report (12 Apr 2019 to 11 May 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Apr 2019) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2013/04)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Apr 2019) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

EP-071/2000/C 

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L10& L11   (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

 

EP-071/2000/C 

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 165)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Forty-seventh Monthly EM&A Report(Apr 2019) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Forty-sixth Monthly EM&A Report(Mar 2019) (V.6) 

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.40

http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

EP-312/2008/A

Upgrading of Pillar Point Sewage Treatment Works

Quarterly EM&A Report (Jan to Mar 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2012/08)     

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2017/10)     

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (Apr 2019)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly Environmental Monitoring and Audit Report (Dec 2018 to Feb 2019)(HY/2017/10)    

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report(Mar 2019)(Rev.1)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report(Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.9(Rev.B)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.10(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.8(Rev.B)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.6(Rev.D)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

- North District

 

 

FEP-02/474/2013

 Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Apr 2019)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Apr 2019) (Version 1)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jan 2019 to Mar 2019) (Version 1)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Quarterly EM&A Report (Feb 2019 to Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

EP-502/2015/A

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

Monthly EM&A Report (Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html

 

 

EP-502/2015/A

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Feb 2019 - Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

- Sai Kung District

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Apr 2019)(version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

EP-134/2002/M

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Apr 2019)(CV/2016/04)

https://www.epd.gov.hk/eia/english/register/index8/vep5532018_content.html

 

 

 

 

EP-134/2002/M

Fill Bank at Tseung Kwan O Area 137

Quarterly Environmental Monitoring and Audit Report (Feb 2019 - Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5532018_content.html

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung HomSection

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Apr 2019) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

9th Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.4 (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Quarterly EM&A Report (Jan 2019 to Mar 2019)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.3 (Mar 2019)v1

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.38

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung HomSection

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Quarterly EM&A Report (Dec 2018 to Feb 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

- Tai Po District

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Monthly EM&A Report(Apr 2019)

http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (Feb 2019 - Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Forty-seventh Monthly EM&A Report(Apr 2019) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Forty-sixth Monthly EM&A Report(Mar 2019) (V.6) 

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.40

http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

- Tuen Mun District

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2012/08)     

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Apr 2019)(HY/2017/10)     

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (Apr 2019)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly Environmental Monitoring and Audit Report (Dec 2018 to Feb 2019)(HY/2017/10)    

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-068/2000/A

Tuen Mun Sewerage - Eastern Coastal Sewerage Extension

Monthly EM&A Report (Apr 2019)(DC/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html

 

 

 

 

EP-210/2005/C

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html

 

 

 

 

EP-210/2005/C

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly EM&A Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.9(Rev.B)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.10(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.8(Rev.B)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.6(Rev.D)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

FEP-02/507/2016/B

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.29

https://www.epd.gov.hk/eia/english/register/index8/vep5522018_content.html

 

 

 

 

EP-507/2016/B

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.29

https://www.epd.gov.hk/eia/english/register/index8/vep5512018_content.html

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.40

http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

FEP-01/534/2107/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

- Yuen Long District

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Quarterly EM&A Report(Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Monthly EM&A Report(Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Quarterly EM&A  Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A  Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (Apr 2019) (Version 1)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jan 2019 to Mar 2019) (Version 1)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2019 to Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

EP-502/2015/A

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

Monthly EM&A Report (Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html

 

 

EP-502/2015/A

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html

 

 

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

- Kwai Tsing District

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-426/2011/A

Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel

Monthly Environmental Monitoring & Audit Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html

 

 

 

 

- Central & Western District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

 

 

FEP-07/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

 

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

FEP-01/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html

 

 

FEP-02/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-518/2016

 Conversion of the Former French Mission Building for Accommodation Use by Law-related Organisation(s) and Related Purposes

IEC Monthly Audit Report For (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5182016_content.html

 

 

 

 

- Wan Chai District

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

 

 

FEP-07/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-11/364/2009/E

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

 

 

FEP-11/364/2009/E

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

FEP-01/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html

 

 

FEP-02/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

- Eastern District

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

EP-364/2009/E

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html

 

 

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

 

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

FEP-02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

 

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

 

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

 

 

 

FEP-07/364/2009/D

Central - Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

Monthly EM&A Report (Apr 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

FEP-07/364/2009/D

Central - Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html

 

 

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

 

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

FEP-10/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

 

 

 

FEP-11/364/2009/E

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

FEP-11/364/2009/E

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

FEP-12/364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

https://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

FEP-08/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Dec 2018 to Feb 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Apr 2019)(version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

FEP-01/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html

 

 

FEP-02/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Apr 2019)(HK/2015/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

- Southern District

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.19

http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2015/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Apr 2019)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

EP-437/2012/A

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Apr 2019)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Apr 2019)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/08)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/07)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/09)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/20)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2015/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Apr 2019)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (Apr 2019)(version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/08)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/07)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/07)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/10)(Apr 2019)(Version 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/24)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2009/10)(Jan 2019 to Mar 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2015/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Apr 2019)(KL/2012/03)

https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

 

 

EP-339/2009/A

Decommissioning of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport

Monthly EM&A Report (Apr 2019)(KL/2014/03)

https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung HomSection

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

- Yau Tsim Mong District

 

 

EP-455/2013

Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.16

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html

 

 

 

 

EP-349/2009/N

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5442018_content.html

 

 

 

 

EP-438/2012/K

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

EP-437/2012/A

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Apr 2019)

http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html

 

 

EP-440/2012

MTR Tsim Sha Tsui Station Carnarvon Subway and Entrances Modification Works

Monthly EM&A Report (Apr 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/08)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/07)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/09)

http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

EP-457/2013/C

Central Kowloon Route

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/09)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html

 

 

 

 

FEP-02/457/2013/C

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report (Apr 2019) (HY/2014/20)

https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html