Monthly Update of Documents Uploaded

 

    Documents Uploaded to the EIAO Website

   (for the period between 16 February 2022 to 15 March 2022)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-352/2022

Route 11 (Section between Yuen Long and North Lantau)

Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-352.pdf

 

 

ESB-353/2022

Development of Integrated Waste Management Facilities Phase 2

Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-353.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-288/2022

Lamma Island Cable System

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir288/dir288.pdf

 

 

DIR-289/2022

Peng Chau Cable System

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir289/dir289.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-274/2022

Mai Po Nature Reserve Infrastructure Upgrade Project

Decisions of the DEP

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2742021.pdf

 

 

Application for Environmental Permit

 

 

AEP-598/2021

Mai Po Nature Reserve Infrastructure Upgrade Project

Environmental Permit issued (EP-598/2022)

https://www.epd.gov.hk/eia/register/permit/latest/ep5982021.htm

 

 

Application for Variation of an Environmental Permit

 

 

Nil

 

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-586/2021

Pier Improvement at Lai Chi Wo

Submission of Pier Design Plan for Lai Chi Wo Pier - Part 1 (Rev. 3)

https://www.epd.gov.hk/eia/english/register/aep/ep5862021_content.html

 

 

 

 

EP-597/2021

Sai O Trunk Sewer Sewage Pumping Station

Construction Noise Management PlanFeb 2022) (Rev. 7)

https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html

 

 

 

 

EP-567/2019

HKA Submarine Cable - Chung Hom Kok

Submission of As-built Plans

https://www.epd.gov.hk/eia/english/register/aep/ep5672019_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Complaint Management Plan (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Management Organization of Main Construction Companies

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Location Plans

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

EP-541/2017/A

Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Baseline Monitoring ReportRevision A

https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-555/2018/A

New Wang Tong River Bridge

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-588/2021

Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Dec 2021) (Tung Chung East)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Dec 2021) (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Jan 2022) (Tung Chung East)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-519/2016

Tung Chung New Town Extension

Monthly EM&A Report (Jan 2022) (Tung Chung West)

https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html

 

 

 

 

 

 

EP-538/2017

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html

 

 

 

 

 

 

FEP-01/353/2009/K

Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok

Construction Phase Monthly EM&A Report No. 4 (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html

 

 

 

 

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-488/2014/A

Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

197th Monthly EM&A Report (12 Jan 2022 – 11 Feb 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Quarterly EM&A Report (Sep 2021 to Nov 2021) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(Jan 2022) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.43(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.43(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

14th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

14th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Quarterly EM&A Report (Sep 2021 to Nov 2021) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Jan 2022) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

 

EP-456/2013/B

Drainage Improvement Works at Ngong Ping

Monthly Environmental Monitoring And Audit Report (Jan 2022)DC/2019/06

https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html

 

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Quarterly EM&A Report (Oct to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly Progress Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

Monthly Progress Report (Jan 2022)(Revision A)

https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Eightieth Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 198)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

 

 

 

 

- North District

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Final EM&A Summary Report

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Final EM&A Summary Report

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A ReportJan 2022) 

https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Quarterly EM&A Report (Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Jan 2022)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

FEP-01/460/2013/A

Development of Organic Waste Treatment Facilities, Phase 2

Monthly EM&A Report (Jan 2022) (Version 1)

https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

- Sai Kung District

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.37(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.37(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Jan 2022)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Quarterly EM&A Report (Jun 2021 to Aug 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

13th Quarterly EM&A Report(Aug 2021 to Oct 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

41st Monthly EM&A Report (Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Quality EM&A Report (Sep 2021 to Nov 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (Jan 2022) (V.1)

https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Nov 2021 to Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.71

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

 

- Tai Po District

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

FEP-01/470/2013

Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html

 

 

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (Jan 2022)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Eightieth Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Tuen Mun District

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.43(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.43(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

14th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

14th Quarterly EM&A Report(Rev.A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

 

 

FEP-03/558/2018/B

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Quarterly Environmental Monitoring and Audit (EM&A) Report(Oct 2021 to Dec 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html

 

 

 

 

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

 

 

EP-210/2005/E

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report(Nov 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html

 

 

 

 

 

 

EP-507/2016/D

Additional Gas-fired Generation Units Project

Monthly EM&A Report no.62

https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html

 

 

 

 

 

 

 

FEP-04/507/2016/D

Additional Gas-fired Generation Units Project - Installation of one additional gas-fired generation unit (CCGT unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.62

https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html

 

 

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013/A

Development of Lok Ma Chau Loop

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html

 

 

 

 

 

 

 

EP-565/2019

Yuen Long Effluent Polishing Plant

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html

 

 

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Final EM&A Summary Report

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-501/2015

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Final EM&A Summary Report

https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html

 

 

 

 

 

 

- Kwai Tsing District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-541/2017/A

Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html

 

 

 

 

 

 

- Central & Western District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Eastern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

EP-505/2015/A

Chai Wan Government Complex and Vehicle Depot

Monthly EM&A Report(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Nov 2021 to Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Monthly EM&A Report (Jan 2022)(Version 2)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

EP-459/2013

Cross Bay Link, Tseung Kwan O

Quarterly EM&A Report (Jun 2021 to Aug 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.37(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 


EP-308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No.37(Jan 2022)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 

- Southern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Operation Phase Monthly EM&A ReportJan 2022

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Nov 2021 to Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Oct 2021 to Dec 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (Jan 2022)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Jan 2022) (ED/2018/05)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (Jan 2022) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly Audit Report No. 15

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Oct 2021 to Dec 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly Environmental Monitoring And Audit Report (Nov 2021 to Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2022)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jan 2022)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Oct 2021 to Dec 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.48

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html

 

 

 

 

 

 

EP-436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)

https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html

 

 

 

 

 

 

FEP-01/436/2012/F

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html

 

 

 

 

 

 

 

FEP-03/457/2013/D

Central Kowloon Route - Yau Ma Tei East

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html

 

 

 

 

 

 

FEP-01/457/2013/C

Central Kowloon Route - Kai Tak West (HY/2014/07)

Monthly EM&A Report (Jan 2022)(HY/2014/07)

https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2014/20) (HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report (Jan 2022)(HY/2018/02)(HY/2019/13)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html

 

 

 

 

 

 

EP-457/2013/D

Central Kowloon Route

Monthly EM&A Report(Jan 2022)(HY/2014/08)

https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html