EIA-292/2022 Revitalisation of Tai Wai Nullah EIA Reports https://www.epd.gov.hk/eia/register/report/eiareport/eia_2922022/html/index.htm
Application for Environmental Permit
AEP-622/2023 Ground Investigation Works within Tai Lam Country Park for Route 11 (Section between Yuen Long and North Lantau) Environmental Permit issued (EP-622/2023) https://www.epd.gov.hk/eia/register/permit/latest/ep6222023.htm
AEP-623/2023 Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot Environmental Permit issued (EP-623/2023) https://www.epd.gov.hk/eia/register/permit/latest/ep6232023.htm
Application for Variation of an Environmental Permit
Nil
Application for Further Environmental Permit
FEP-215/2023 Police Facilities in Kong Nga Po Environmental Permit issued (FEP-01/510/2016) https://www.epd.gov.hk/eia/register/permit/latest/fep2152023.htm
Submission as required by Environmental Permit Condition - Design / Environmental Submissions
FEP-01/292/2007 North East New Territories (NENT) Landfill Extension Baseline Monitoring Report for Construction Phase – Landscape and Visual Monitoring (Dec 2022) https://www.epd.gov.hk/eia/english/register/index7/fep2102022_content.html
EP-600/2022 Re-provision of Open Cycle Gas Turbines at Lamma Power Station Contamination Assessment Plan (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep6002021_content.html
FEP-01/558/2018/A Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal Emergency Response Plan https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
EP-515/2017 Proposed Low-rise and Low-density Residential Development at Various Lots and their Adjoining Government Land in D.D. 104, East of Kam Pok Road, Mai Po, Yuen Long. New Territories Landscape and Visual Implementation Plan https://www.epd.gov.hk/eia/english/register/aep/ep5152017_content.html
EP-311/2008/E Proposed Comprehensive Development at Wo Shang Wai, Yuen Long Bi-annual Report on EM&A Results on Ecological Aspects (May 2022 to Oct 2022)(Rev B) https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
EP-541/2017/A Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road Traffic Noise Mitigation Plan https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html
EP-489/2014 Expansion of Hong Kong International Airport into a Three-Runway System Management OrganizationsMar 2023 https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
EP-517/2017/A Expansion of Sha Tau Kok Sewage Treatment Works Proposal for Reducing Odour Monitoring Frequency https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
Submission as required by Environmental Permit Condition - EM&A Report
Island District Central & Western District
North District Wan Chai District
Sai Kung District Eastern District
Sha Tin District Southern District
Tai Po District Kowloon City District
Tsuen Wan District Kwun Tong District
Tuen Mun District Sham Shui Po District
Yuen Long District Wong Tai Sin District
Kwai Tsing District Yau Tsim Mong District
- Island District
EP-581/2020 Airport City Link Construction Phase Monthly EM&A Report (Jan 2023 https://www.epd.gov.hk/eia/english/register/aep/ep5812020_content.html
EP-560/2018 Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
EP-312/2008/A Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
EP-207/2005/A Siu Ho Wan Water Treatment Works Extension Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5962021_content.html
EP- 01/097/2001/C Water Recreation Centre at Penny's Bay (part & remaining part) Monthly Environmental Monitoring and Audit Report (No. 210) https://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
EP-555/2018/A New Wang Tong River Bridge Quarterly EM&A Report(Oct 2022 to Dec 2022) https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html
EP-555/2018/A New Wang Tong River Bridge Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html
EP-207/2005/A Siu Ho Wan Water Treatment Works Extension 3rd Quarterly Environmental Monitoring And Audit Report (Nov 2022 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5962021_content.html
FEP-01/395/2010/C Organic Waste Treatment Facilities, Phase I Eighty-ninth Monthly EM&A Report(Oct 2022)(Rev.1) https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
EP-354/2009/D Tuen Mun - Chek Lap Kok Link 8th EM&A Report(Jan 2023)(HY/2021/13) https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
EP-354/2009/D Tuen Mun - Chek Lap Kok Link 22nd EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
EP-353/2009/K Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities Quarterly EM&A Report (Dec 2022 to Jan 2023)(HY/2019/01) https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
EP-353/2009/K Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities Final EM&A Review Report (Feb 2020 to Jan 2023)(HY/2019/01) https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
EP-519/2016 Tung Chung New Town Extension Monthly EM&A Report (Jan 2023) (Tung Chung West) https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
EP-519/2016 Tung Chung New Town Extension Monthly EM&A Report (Jan 2023) (Tung Chung East) https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
EP-538/2017 Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html
EP-588/2021 Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html
EP-600/2022 Re-provision of Open Cycle Gas Turbines at Lamma Power Station Monthly Environmental Monitoring & Audit Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep6002021_content.html
EP-489/2014 Expansion of Hong Kong International Airport into a Three-Runway System Construction Phase Monthly EM&A Report No.85 https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
FEP-01/353/2009/K Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok Construction Phase Monthly EM&A Report No. 16 (Jan 2023) https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
EP-352/2009/D Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road Monthly EM&A Report(Jan 2023) (HY/2011/03) https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
EP-353/2009/K Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities Monthly EM&A Report(Jan 2023) (HY/2011/03) https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
FEP-01/558/2018/A Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
FEP-02/558/2018/A Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
FEP-03/558/2018/B Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
FEP-01/353/2009/K Hong Kong - Zhuha - Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between HKBCF and the Airport, Chek Lap Kok Construction Phase Quarterly EM&A Report No. 5 (Oct 2022 to Dec 2022) https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
EP-01/059/2000/C The Theme Park at Penny's Bay, Lantau 209th Monthly EM&A Report (12 Jan 2023 – 11 Feb 2022) https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
EP-071/2000/D 1,800 MW Gas-Fired Power Station at Lamma Extension Monthly Environmental Monitoring and Audit Report Unit L12 (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
EP-071/2000/D 1,800 MW Gas-Fired Power Station at Lamma Extension Monthly Environmental Monitoring And Audit Report (Jan 2022) https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
EP-353/2009/K Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities Quarterly EM&A Report (Dec 2022 to Jan 2023)(HY/2019/01) https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
EP-353/2009/K Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities Final EM&A Review Report (Feb 2020 to Jan 2023)(HY/2019/01) https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
FEP-01/429/2012/A / EP-429/2012/A Development of the Integrated Waste Management Facilities Phase 1 Monthly EM&A Report No.55(Rev A) https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
EP-456/2013/B Drainage Improvement Works at Ngong Ping Monthly Environmental Monitoring And Audit Report (Jan 2023)DC/2019/06 https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html
FEP-01/429/2012/A / EP-429/2012/A Development of the Integrated Waste Management Facilities Phase 1 18th Quarterly EM&A Report(Rev.A) https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
- North District
EP-534/2017 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery Monthly EM&A Report (Jan 2023)V.2) https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
EP-292/2007 North East New Territories (NENT) Landfill Extension Monthly Environmental Monitoring and Audit Report (No. 2) – January 2023 https://www.epd.gov.hk/eia/english/register/aep/ep2922007_content.html
FEP-01/292/2007 North East New Territories (NENT) Landfill Extension Monthly Environmental Monitoring and Audit Report (No. 2) – January 2023 https://www.epd.gov.hk/eia/english/register/index7/fep2102022_content.html
FEP-01/470/2013 Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
EP-466/2013/A NENT - Castle Peak Road Diversion Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6192022_content.html
EP-467/2013/A Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
EP-468/2013/A Kwu Tung North New Development Area Road D1 to D5 Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
EP-469/2013 NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
EP-470/2013/A NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html
EP-473/2013/A Fanling Bypass Eastern Section Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
EP-475/2013/A Reprovision of temporary Wholesale Market in Fanling North New Development Area Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
EP-477/2013/A Development of Lok Ma Chau Loop Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
EP-517/2017/A Expansion of Sha Tau Kok Sewage Treatment Works Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
EP-510/2016 Police Facilities in Kong Nga Po Quarterly EM&A Report (Oct 2022 to Dec 2022) https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
FEP-02/474/2013 Shek Wu Hui Effluent Polishing Plant Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
EP-404/2011/D Liantang / Heung Yuen Wai Boundary Control Point and Associated Works Monthly EM&A Report (Jan 2023) http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
EP-404/2011/D Liantang / Heung Yuen Wai Boundary Control Point and Associated Works Monthly EM&A Report (Nov 2022) http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
FEP-01/460/2013/A Development of Organic Waste Treatment Facilities, Phase 2 Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
EP-510/2016 Police Facilities in Kong Nga Po Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
- Sai Kung District
FEP-01/503/2015/A Desalination Plant at Tseung Kwan O Monthly EM&A Report (Dec 2022) https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
EP-503/2015/A Desalination Plant at Tseung Kwan O 54th Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
FEP-01/503/2015/A Desalination Plant at Tseung Kwan O Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
EP-513/2016 Development of Anderson Road Quarry site - Road Improvement Works Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
 EP-459/2013 Cross Bay Link, Tseung Kwan O Monthly EM&A Report (Jan 2023)(Version 2) https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
EP-516/2016 Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
FEP-01/308/2008/B,EP-308/2008/B South-East New Territories Landfill Extension Monthly EM&A Report No.49(Jan 2023) https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
FEP-01/308/2008/B,EP-308/2008/B South-East New Territories Landfill Extension Quarterly EM&A Report (Jul 2022 to Sep 2022) https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
EP-319/2009/D Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate Monthly EM&A Report (Jan 2023) (V.1) https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Monthly EM&A Report (Jan 2023)(Version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Quarterly Environmental Monitoring And Audit Report (Nov 2022 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Quarterly EM&A Report (Nov 2022 to Jan 2023) (version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
- Sha Tin District
EP-345/2009/A Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir 42nd Monthly EM&A Report(Rev. 1)(Dec 2022)(DC/2018/08) https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
EP-345/2009/A Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir 41st Monthly EM&A Report(Rev. 3)(Nov 2022)(DC/2018/08) https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
EP-345/2009/A Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir 43rd Monthly EM&A Report(Rev. 0)(Jan 2023)(DC/2018/08) https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
EP-494/2015 In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works Monthly EM&A Report No.83 http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
EP-463/2013/B Widening and Reconstruction of Tai Po Road (Sha Tin Section) Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
EP-533/2017/A Sha Tin Cavern Sewage Treatment Works Quarterly EM&A Report (Sept 2022 to Nov 2022) https://www.epd.gov.hk/eia/english/register/index8/vep6182022_content.html
EP-533/2017/A Sha Tin Cavern Sewage Treatment Works Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6182022_content.html
- Tai Po District
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Quarterly EM&A Report(Aug 2022 to Oct 2022) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Quarterly EM&A Report(May 2022 to Jul 2022) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A Report(Oct 2022) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A Report(Sep 2022)(V4) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A Report(Nov 2022) https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A ReportMay 2022 https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A ReportJune 2022 https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A ReportAug 2022 https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
EP-597/2021 Sai O Trunk Sewer Sewage Pumping Station Monthly EM&A ReportJul 2022 https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
FEP-01/470/2013 Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
EP-466/2013/A NENT - Castle Peak Road Diversion Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6192022_content.html
EP-467/2013/A Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
EP-468/2013/A Kwu Tung North New Development Area Road D1 to D5 Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
EP-469/2013 NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
EP-470/2013/A NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html
EP-473/2013/A Fanling Bypass Eastern Section Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
EP-475/2013/A Reprovision of temporary Wholesale Market in Fanling North New Development Area Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
EP-477/2013/A Development of Lok Ma Chau Loop Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
- Tsuen Wan District
EP-489/2014 Expansion of Hong Kong International Airport into a Three-Runway System Construction Phase Monthly EM&A Report No.85 https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
FEP-01/395/2010/C Organic Waste Treatment Facilities, Phase I Eighty-ninth Monthly EM&A Report(Oct 2022)(Rev.1) https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
EP-076/2000 Upgrading of Siu Ho Wan Sewage Treatment Plant Monthly Environmental Monitoring And Audit Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
- Tuen Mun District
FEP-01/429/2012/A / EP-429/2012/A Development of the Integrated Waste Management Facilities Phase 1 Monthly EM&A Report No.55(Rev A) https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
EP-489/2014 Expansion of Hong Kong International Airport into a Three-Runway System Construction Phase Monthly EM&A Report No.85 https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
FEP-01/558/2018/A Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
FEP-02/558/2018/A Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
FEP-03/558/2018/B Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS Monthly Environmental Monitoring and Audit (EM&A) Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
FEP-01/429/2012/A / EP-429/2012/A Development of the Integrated Waste Management Facilities Phase 1 18th Quarterly EM&A Report(Rev.A) https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
EP-507/2016/D Additional Gas-fired Generation Units Project Annual EM&A Report No.6 https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html
EP-507/2016/C Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station Annual EM&A Report No.6 https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
EP-507/2016/D Additional Gas-fired Generation Units Project Monthly EM&A Report no.74 https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html
EP-441/2012/A Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS) Monthly EM&A Report (Nov 2022) https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
EP-354/2009/D Tuen Mun - Chek Lap Kok Link 5th Monthly EM&A Report (Jan 2023)(DC/2016/01)(HY/2012/07) https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
EP-354/2009/D Tuen Mun - Chek Lap Kok Link 8th EM&A Report(Jan 2023)(HY/2021/13) https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
EP-354/2009/D Tuen Mun - Chek Lap Kok Link 22nd EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
EP-534/2017 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery Monthly EM&A Report (Jan 2023)V.2) https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
EP-528/2017 Construction of Eight New District Distributor Roads (Road D1 to D8) in Hung Shui Kiu New Development Area Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/aep/ep5282017_content.html
- Yuen Long District
EP-594/2021 Installation of the Proposed 132kV Cable Circuits Connecting with Ho To West Substation and Existing 132kV Fanling to Mai Po Cable Circuits Monthly Environmental Monitoring & Audit Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5942021_content.html
EP-565/2019 Yuen Long Effluent Polishing Plant Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
EP-466/2013/A NENT - Castle Peak Road Diversion Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6192022_content.html
EP-467/2013/A Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
EP-468/2013/A Kwu Tung North New Development Area Road D1 to D5 Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
EP-469/2013 NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
EP-470/2013/A NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html
EP-473/2013/A Fanling Bypass Eastern Section Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
EP-475/2013/A Reprovision of temporary Wholesale Market in Fanling North New Development Area Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
EP-477/2013/A Development of Lok Ma Chau Loop Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
EP-311/2008/E Proposed Comprehensive Development at Wo Shang Wai, Yuen Long Monthly EM&A Report(Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
EP-528/2017 Construction of Eight New District Distributor Roads (Road D1 to D8) in Hung Shui Kiu New Development Area Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/aep/ep5282017_content.html
- Kwai Tsing District
EP-541/2017/A Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road Monthly EM&A ReportJan 2023 https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html
- Central & Western District
EP-376/2009 DP2-Road P2 and other roads which are classified as primary/district distributor roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
- Wan Chai District
EP-436/2012/F Shatin to Central Link - Hung Hom to Admiralty Section Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
EP-376/2009 DP2-Road P2 and other roads which are classified as primary/district distributor roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
- Eastern District
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Monthly EM&A Report (Jan 2023)(Version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Quarterly Environmental Monitoring And Audit Report (Nov 2022 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
 EP-459/2013 Cross Bay Link, Tseung Kwan O Monthly EM&A Report (Jan 2023)(Version 2) https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Quarterly EM&A Report (Nov 2022 to Jan 2023) (version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
EP-505/2015/A Chai Wan Government Complex and Vehicle Depot Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Monthly EM&A Report (Jan 2023)(HY/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
EP-364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
FEP-07/364/2009/H Central-Wanchai Bypass (CWB) including its road tunnel and slip roads Quarterly EM&A Report (Sep 2022 to Nov 2022)(HK/2019/18) https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
EP-603/2022 Removal of 132kV Overhead Line and Pylons for P-Line Monthly Audit Report No. 9 (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
EP-505/2015/A Chai Wan Government Complex and Vehicle Depot Monthly EM&A Report(Dec 2022) https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html
- Southern District
EP-249/2006/D Repositioning and Long Term Operation Plan of Ocean Park 9th Monthly Noise Monitoring Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Monthly EM&A Report (Jan 2023)(Version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Quarterly Environmental Monitoring And Audit Report (Nov 2022 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-603/2022 Removal of 132kV Overhead Line and Pylons for P-Line Monthly Audit Report No. 9 (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Quarterly EM&A Report (Nov 2022 to Jan 2023) (version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
- Kowloon City District
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development EM&A Report (Jan 2023)(KL/2016/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development Monthly EM&A Report (Jan 2023)(KL/2014/01) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-445/2013/B Kai Tak Development – Roads D3A & D4A Monthly EM&A Report (Jan 2023)(KL/2014/01) https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development Monthly EM&A Report (Jan 2023) (ED/2018/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-563/2018 The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development Monthly Audit Report No. 28 https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
EP-544/2017 Kai Tak Sports Park EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
EP-451/2013 Trunk Road T2 Monthly EM&A Report (Jan 2023)(ED/2018/04) https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2018/02) (HY/2019/13) https://www0.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2014/20) (HY/2019/13) https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
 FEP-03/457/2013/D Central Kowloon Route - Yau Ma Tei East (HY/2014/08) Monthly EM&A Report(Jan 2023)(HY/2014/08) http://www0.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
FEP-01/457/2013/C Central Kowloon Route - Kai Tak West (HY/2014/07) Monthly EM&A Report (Jan 2023)(HY/2014/07) http://www0.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2018/08) http://www0.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
- Kwun Tong District
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development EM&A Report (Jan 2023)(KL/2016/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development Monthly EM&A Report (Jan 2023)(KL/2014/01) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-445/2013/B Kai Tak Development – Roads D3A & D4A Monthly EM&A Report (Jan 2023)(KL/2014/01) https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development EM&A Report (Jan 2023)(KL/2016/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-513/2016 Development of Anderson Road Quarry site - Road Improvement Works Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
EP-544/2017 Kai Tak Sports Park EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
EP-564/2018 Lei Yue Mun Waterfront Enhancement Project Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2018/02) (HY/2019/13) https://www0.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2014/20) (HY/2019/13) https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
 FEP-03/457/2013/D Central Kowloon Route - Yau Ma Tei East (HY/2014/08) Monthly EM&A Report(Jan 2023)(HY/2014/08) http://www0.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
FEP-01/457/2013/C Central Kowloon Route - Kai Tak West (HY/2014/07) Monthly EM&A Report (Jan 2023)(HY/2014/07) http://www0.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2018/08) http://www0.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Monthly EM&A Report (Jan 2023)(Version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Quarterly Environmental Monitoring And Audit Report (Nov 2022 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
EP-458/2013/C Tseung Kwan O – Lam Tin Tunnel and Associated Works Quarterly EM&A Report (Nov 2022 to Jan 2023) (version 1.0) https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
- Sham Shui Po District
Nil
- Wong Tai Sin District
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development EM&A Report (Jan 2023)(KL/2016/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development Monthly EM&A Report (Jan 2023)(KL/2014/01) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-445/2013/B Kai Tak Development – Roads D3A & D4A Monthly EM&A Report (Jan 2023)(KL/2014/01) https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html
EP-337/2009 New Distributor Roads Serving the Planned Kai Tak Development EM&A Report (Jan 2023)(KL/2016/05) http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
EP-544/2017 Kai Tak Sports Park EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
- Yau Tsim Mong District
EP-436/2012/F Shatin to Central Link - Hung Hom to Admiralty Section Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
EP-523/2016 Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert Submission of Monthly EM&A Report No.59 https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
EP-523/2016 Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert Submission of Monthly EM&A Report No.61 https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
EP-453/2013/B Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District Monthly EM&A Report (Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
EP-453/2013/B Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District Quarterly EM&A Report (Nov 2023 to Jan 2023) https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2018/02) (HY/2019/13) https://www0.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
EP-457/2013/D Central Kowloon Route Monthly EM&A Report (Jan 2023)(HY/2014/20) (HY/2019/13) https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html