| ¡@ |
 |
Project Profile |
| ¡@ |
¡@ |
PP-041/1999
- Yau Tong Bay Development - Engineeing Feasibility Study for
the Comprehensive Development at Yau Tong Bay |
| ¡@ |
 |
Study Brief
Issued or DEP's decision on permission to apply directly for
permit |
| ¡@ |
¡@ |
ESB-028/1999
- Yau Tong Bay Development - Engineering Feasibility Study for
the Comprehensive Development at Yau Tong Bay |
| ¡@ |
 |
EIA Report |
| ¡@ |
¡@ |
EIA-048/2000- Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay (The report did not meet the requirement of EIA
Study Brief and the TM
20 Sep 2000)(reason) |
| ¡@ |
¡@ |
EIA-070/2001- Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay
(Application was withdrawn by applicant on 30 Nov 2001) |
| ¡@ |
¡@ |
AEIAR-054/2002 - Yau Tong Bay Development
- Engineering Feasibility Study for the Comprehensive Development
at Yau Tong Bay |
| ¡@ |
¡@ |
Executive
Summary |
| ¡@ |
¡@ |
EIA
Report |
| ¡@ |
¡@ |
Approval
condition |
| ¡@ |
 |
Current Environmental
Permit Held |
| ¡@ |
¡@ |
- N.A. |