|
Application No. |
Environmental Impact Assessment Report |
Applicant |
Status |
|
EIA-166/2009 |
Decommissioning of the Co-Combustion Pilot Plant at Tap Shek Kok
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
Green Island Cement Company Limited
|
- Applicant was informed on 4 May 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 May 2009 to 13 Jun 2009. During the period, 2 sets of written comment were received from members of
the public.
- Approved without conditions
on 23 Jun 2009.
- Register No.: AEIAR-138/2009
Link
to other related information
|
|
EIA-165/2009 |
Phased Reprovisioning of Cape Collinson Crematorium
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Food and Environmental Hygiene Department
|
- Applicant was informed on 20 Apr 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Apr 2009 to 29 May 2009. During the period, 2 sets of written comment were received from members of
the public.
- Approved without conditions
on 8 Jun 2009.
- Register No.: AEIAR-137/2009
Link
to other related information
|
|
EIA-163/2008 |
Hang Hau Tsuen Channel at Lau Fau Shan
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
New Territories North and West Development Office, Civil Engineering and Development Department
|
- Applicant was informed on 3 Feb 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Feb 2009 to 6 Mar 2009. During the period, 1 set of written comment was received from members of
the public.
- Approved without conditions
on 1 Apr 2009.
- Register No.: AEIAR-134/2009
Link
to other related information
|
|
EIA-162/2008 |
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A
Manual] [PDF] | [HTML]
|
Water Supplies Department
|
- Applicant was informed on 6 Feb 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Feb 2009 to 21 Mar 2009. During the period, 1 set of written comment was received from members of
the public.
- Approved with conditions
on 15 Apr 2009.
- Register No.: AEIAR-135/2009
- Amended Pages submitted by the applicant to fulfil the approval conditions
Link
to other related information
|
|
EIA-161/2008 |
Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Secretary for Security
|
- Applicant was informed on 23 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 Feb 2009 to 3 Mar 2009. During the period, 3 sets of written comments were received from members of
the public.
- Approved with conditions
on 8 Apr 2009.
- Register No.: AEIAR-136/2009
Link
to other related information
|
|
EIA-160/2008 |
Improvement to Pok Oi Interchange
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A
Manual] [PDF] | [HTML]
|
Highways Department
|
- Applicant was informed on 13 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Jan 2009 to 20 Feb 2009. During the period, no comments were received from members of
the public.
- Approved without conditions
on 17 Mar 2009.
- Register No.: AEIAR-132/2009
Link
to other related information
|
|
EIA-159/2008 |
Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Civil Engineering and Development Department
|
- Applicant was informed on 2 Jan 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jan 2009 to 13 Feb 2009. During the period, 5 sets of written comment were received from members of
the public.
- Approved without conditions
on 12 Mar 2009.
- Register No.: AEIAR-133/2009
Link
to other related information
|
|
EIA-158/2008 |
Traffic Improvements to Tuen Mun Road Town Centre Section
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Electronic visualization]
[EM&A
Manual] [PDF] | [HTML]
|
Highways Department
|
- Applicant was informed on 12 Dec 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Dec 2008 to 22 Jan 2009. During the period, 22 sets of written comment were received from members of
the public.
- Approved without conditions
on 17 Feb 2009.
- Register No.: AEIAR-128/2009
Link
to other related information
|
|
EIA-157/2008 |
Kai Tak Development
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Civil Engineering and Development Department
|
- Applicant was informed on 26 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 9 Dec 2008 to 7 Jan 2009. During the period, 4 sets of written comment were received from members of
the public.
- Approved without conditions
on 4 Mar 2009.
- Register No.: AEIAR-130/2009
Link
to other related information
|
|
EIA-156/2008 |
Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
|
ASB Biodiesel (Hong Kong) Limited
|
- Applicant was informed on 3 Dec 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009. During the period, 1 set of written comment was received from members of
the public.
- Approved without conditions
on 26 Feb 2009.
- Register No.: AEIAR-131/2009
Link
to other related information
|
|
EIA-155/2008 |
Sludge Treatment Facilities
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Environmental Protection Department
|
- Applicant was informed on 28 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Dec 2008 to 15 Jan 2009. During the period, 6 sets of written comment were received from members of
the public.
- Approved with conditions
on 19 Feb 2009.
- Register No.: AEIAR-129/2009
Link
to other related information
|
|
EIA-154/2008 |
Tsim Sha Tsui Station Northern Subway
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
MTR Corporation Limited
|
- Applicant was informed on 10 Nov 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2008 to 18 Dec 2008. During the period, 1 set of written comment was received from members of
the public.
- Approved with conditions
on 31 Dec 2008.
- Register No.: AEIAR-127/2008
Link
to other related information
|
|
EIA-152/2008 |
Tsuen Wan Bypass, widening of Tsuen Wan Road between Tsuen Tsing Interchange and Kwai Tsing Interchange, and associated junction improvement works
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML] [Electronic visualization]
[EM&A
Manual] [PDF] | [HTML]
|
Civil Engineering and Development Department
|
- Applicant was informed on 30 Sep 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Oct 2008 to 11 Nov 2008. During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 8 Dec 2008.
- Register No.: AEIAR-124/2008
Link
to other related information
|
|
EIA-150/2008 |
Tuen Mun Area 54 Sewage Pumping Station
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[EM&A
Manual] [PDF] | [HTML]
|
Land Works Division, Civil Engineering Office, Civil Engineering and Development Department
|
- Applicant was informed on 19 Aug 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Sep 2008 to 18 Oct 2008. During the period, no comments were received from members of the public.
- Approved without conditions on 12 Nov 2008.
- Register No.: AEIAR-122/2008
Link
to other related information
|
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A
[Executive Summary] | [PDF] | [HTML]
[EIA Report Volume 1] [PDF] | [HTML]
[EIA Report Volume 2] [PDF] | [HTML]
[EIA Report Volume 3a] [PDF] | [HTML]
[EIA Report Volume 3b] [PDF] | [HTML]
|
Drainage Services Department
|
- Applicant was informed on 18 June 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Aug 2008 to 10 Sep 2008. During the period, 1 set of written comments were received from members of the public.
- Approved without conditions on 30 Oct 2008.
- Register No.: AEIAR-121/2008
Link
to other related information
|
| EIA-146/2008 |
Provision of Cremators at Wo
Hop Shek Crematorium¡@
¡@
|
Food and Environmental Hygiene Department |
- Applicant was informed on 9 Apr 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 May 2008 to 31 May 2008.
During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 24 Jun 2008.
- Register No.: AEIAR-119/2008
Link
to other related information
|
| EIA-145/2008 |
Upgrading of Pillar Point
Sewage Treatment Works¡@
|
Drainage Services Department |
- Applicant was informed on 3 Apr 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
During the period, 2 sets of written comments were received from members of the public.
- Approved without conditions on 10 Jun 2008.
- Register No.: AEIAR-118/2008
Link
to other related information
|
| EIA-144/2008 |
Proposed Comprehensive
Development at Wo Shang Wai, Yuen Long
¡@
[Executive Summary] | [PDF] | [HTML]
[EIA
Report] [PDF] | [HTML]
¡@
[Further information submitted under section 8.(1) of
the Ordinance]
|
Profit Point Enterprises Limited |
- Applicant was informed on 26 Mar 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
During the period, 480 sets of written comments were received from members of the public.
- Approved with conditions
on 31 Jul 2008.
- Register No.: AEIAR-120/2008
Link
to other related information
|
| EIA-143/2007 |
South East New Territories (SENT) Landfill
Extension¡@
|
Environmental
Protection Department |
- Applicant was informed on 31 Jan 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Feb 2008 to 26 Mar 2008.
During the period, 1001 sets of written comments were received from members of the public.
- Approved with conditions
on 6 May 2008.
- Register No.: AEIAR-117/2008
Link
to other related information
|
| EIA-142/2007 |
Widening of Tuen Mun Road at Tsing Tin Interchange¡@
|
Highways
Department |
- Applicant was informed on
11 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Dec 2007 to 12 Jan
2008.
During the period, no comments were received from members of the public.
- Approved without conditions on 23 Jan 2008.
- Register No.: AEIAR-116/2008
Link
to other related information
|
| EIA-141/2007 |
Wan Chai Development Phase II and Central-Wan Chai Bypass¡@
¡@
¡@
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of the Ordinance]
[Electronic visualization]
|
Civil Engineering and Development Department |
- Applicant was informed on 17 Dec 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Dec 2007 to 18 Jan
2008. During the period, 3 sets of written comments was received from members of the public.
- Approved with conditions
on 11 Dec 2008.
- Register No.: AEIAR-125/2008
Link
to other related information
|
| EIA-140/2007 |
Development of a Bathing
Beach at Lung Mei, Tai Po¡@
¡@
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of
the Ordinance]
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Nov 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2007 to 22 Dec 2007. During the period, 94 sets of written comments was received from members of
the public.
- Approved with conditions
on 21 Nov 2008.
- Register No.: AEIAR-123/2008
Link
to other related information
|
| EIA-139/2007 |
Decommissioning of the Former
Kai Tak Airport Other than the North Apron¡@
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov
2007. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 19 Dec 2007.
- Register No.: AEIAR-114/2007
Link
to other related information
|
| EIA-138/2007 |
Dredging Works for Proposed
Cruise Terminal at Kai Tak¡@
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov
2007. During the period, 1 set of written
comment was received from members of the public.
- Approved without conditions on 19 Dec 2007.
- Register No.: AEIAR-115/2007
Link
to other related information
|
| EIA-135/2007 |
Landslide Preventive Works at Po Shan, Mid-levels -
Natural Terrain Risk Mitigation Measures¡@
|
Geotechnical
Engineering Office, Civil Engineering and Development Department |
- Applicant was informed on 15 Aug 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Aug 2007 to 26
Sep 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions
on 22 Oct 2007.
- Register No.: AEIAR-112/2007
Link
to other related information
|
| EIA-134/2007 |
Harbour Area Treatment Scheme (HATS) - Provision of
Disinfection Facilities at Stonecutters Island Sewage Treatment Works¡@
[Executive Summary] | [PDF] | [HTML]
[EIA Report] [PDF] | [HTML]
[Further information submitted under section 8.(1) of
the Ordinance]
[PDF]
|
Drainage
Services Department |
- Applicant was informed on 19 Jul 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2007 to 14
Sep 2007. During the period, 2 sets of written comments were received from members of the public.
- Approved with conditions
on 8 Nov 2007.
- Register No.: AEIAR-113/2007
Link
to other related information
|
| EIA-133/2007 |
North East New Territories (NENT) Landfill
Extension
¡@
¡@
|
Environmental Protection Department |
- Applicant was informed on 1 Jun 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jun 2007 to 24 Jul 2007.
During the period,
227 sets of written comments were received from members of the public.
- Approved with conditions
on 20 Sep 2007.
- Register No.: AEIAR-111/2007
Link
to other related information
|
| EIA-131/2007 |
Laying of Western Cross
Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun
|
Water
Supplies Department |
- Applicant was informed on 25 May 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Jun 2007 to 3 Jul 2007.
During the period, no comments were received from members of the public.
- Approved without conditions on 31 Jul 2007.
- Register No.: AEIAR-109/2007
Link
to other related information
|
| EIA-130/2007 |
Drainage
Improvement in Sha Tin and Tai Po
|
Drainage Services Department |
- Applicant was informed on 8 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2007 to 15 Jun 2007.
During the period,
2 sets of written comments were received from members of the public.
- Approved with conditions
on 9 Aug 2007.
- Register No.: AEIAR-110/2007
Link
to other related information |
| EIA-128/2007 |
Drainage Improvement in Northern
New Territories - Package C
|
Drainage Services Department |
- Applicant was informed on 25 Apr 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 May 2007 to 1 Jun 2007. During the period, 3 sets of written comments were received from members of the public.
- Approved without conditions on 9 Jul 2007.
- Register No.: AEIAR-108/2007
Link
to other related information
|
| EIA-127/2006 |
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Airport Authority Hong Kong |
- Applicant was informed on 16 Feb 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Feb 2007 to 24 Mar 2007. During the period, 2658 sets of written comments were received from
members of the public.
- Approved with conditions
on 30 May 2007.
- Register No.: AEIAR-107/2007
Link
to other related information |
| EIA-126/2006 |
Relocation
of Yiu Lian Floating Dock No. 3
|
Yiu Lian
Dockyards Limited |
- Applicant was informed on 19 Dec 2006 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2006 to 27 Jan 2007.
During the period, 2 sets of written comments were received from members
of the public.
- Approved with conditions
on 23 Feb 2007.
- Register No.: AEIAR-104/2007
Link
to other related information
|
|
EIA-125/2006 |
Liquefied
Natural Gas (LNG) Receiving Terminal and Associated Facilities
|
Castle Peak Power Company Limited |
- Applicant was informed on 15 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Dec 2006 to 25 Jan 2007. During the period, 16392 sets of written comments were received from
members of the public.
- Approved with conditions
on 3 Apr 2007.
- Register No.: AEIAR-106/2007
Link
to other related information
|
| EIA-124/2006 |
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau
|
Castle Peak
Power Company Limited |
- Applicant was informed on 1 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 14 Dec 2006 to 12 Jan 2007. During the period, 3 sets of written comments were received from members
of the public.
- Approved with conditions
on 12 Mar 2007.
- Register No.: AEIAR-105/2007
Link
to other related information |
| EIA-123/2006 |
Emissions Control Project at
Castle Peak Power Station "B" Units
|
Castle
Peak Power Company Limited |
- Applicant was informed on 15 Aug 2006 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment
from 19 Aug 2006 to 17 Sep 2006. During the period, no comments were received from members of the
public.
- Approved without conditions on 25 Oct 2006.
- Register No.: AEIAR-102/2006
Link
to other related information
|
| EIA-122/2006 |
Yuen Long,
Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B -
Kam Tin Secondary Drainage Channel KT13
¡@
|
Drainage
Services Department |
- Applicant was informed on 2 Aug 2006 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment
from 22 Aug 2006 to 20 Sep 2006. During the period, 1 set of written comments was received from members of
the public.
- Approved without conditions on 24 Oct 2006.
- Register No.: AEIAR-103/2006
Link
to other related information
|
| EIA-121/2006 |
Repositioning and Long Term Operation Plan of Ocean Park
¡@
|
Ocean Park Corporation |
- Applicant was informed on 29 May 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 1 Jun 2006 to 30 Jun 2006. During the period, no comments were received from members of the
public.
- Approved without conditions on 12 Jul 2006.
|
|
EIA-120/2006 |
Hong Kong Convention and Exhibition Centre, Atrium Link Extension
|
Hong Kong Trade Development Council |
- Applicant was informed on 17 Mar 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18
Mar 2006 to 16 Apr 2006. During the period, no comments were received from members of the
public.
- Approved without conditions on 21
Apr 2006.
|
|
EIA-119/2005 |
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project |
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 13 Feb 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2006 to 18 Mar 2006. During the period, no comments were received from members of the
public.
- Approved without conditions on 24 Mar 2006.
|
|
EIA-118/2005 |
Main Arena of the 2008 Olympic Equestrian Event |
The Hong Kong Jockey Club |
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006. During the period, 5 sets of written comments were received from members
of the public.
- Approved without conditions on 24 Mar 2006.
|
| EIA-116/2005 |
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun
[Executive Summary][PDF] | [HTML]
[EIA Report] [PDF] | [HTML] |
HGH Limited
|
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006. During the period, 2 sets of written comments were received from members
of the public.
- Approved without conditions on 2 Mar 2006.
|
EIA-115/2005 |
Drainage Improvement
in Northern Hong Kong Island - Hong Kong West Drainage Tunnel
[Executive
Summary][PDF]
| [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML]
|
Drainage
Services Department
|
- Applicant
was informed on 26 Jan 2006 of the suitability of the report
for public inspection.
-
Report was exhibited for public to comment from 13
Feb 2006 to 14 Mar 2006. During the period, no comments were received from members of the
public.
- Approved
without conditions on 7 Apr 2006.
- Register No.: AEIAR-099/2006
Link
to other related information
|
| EIA-114/2005 |
Helipad at Yung Shue Wan, Lamma Island
[Executive
Summary]
| [PDF]
| [HTML]
[EIA
Report] [PDF]
| [HTML]
|
Civil Engineering and Development
Department
|
- Applicant was informed on 14 Nov 2005
of the suitability of the report for public inspection.
- Report was exhibited for public
to comment from 23 Nov 2005 to 22 Dec 2005. During the period, 2 sets of written comments were received from
members of the public.
|
| EIA-113/2005 |
Expansion of Heliport Facilities at Macau Ferry Terminal
[Executive
Summary]
| [PDF]
| [HTML]
[EIA
Report] [PDF]
| [HTML]
|
Civil Aviation Department
|
- Applicant was informed on 28 Oct 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from
1 Nov 2005 to 30 Nov 2005. During the period, 181 sets of written comments were received from
members of the public.
|
| EIA-112/2005 |
Proposed Extension of Public Golf Course
at Kau Sai Chau Island, Sai Kung
[Executive
Summary]
| [PDF]
| [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML]
|
The Hong Kong Jockey Club
|
- Applicant was informed on 1 Sep 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment
from 6 Sep 2005 to 5 Oct 2005.
During the period, 6 sets of written comments were received from
members of the public.
- Approved without conditions on 14 Nov 2005.
- Register No.: AEIAR-091/2005
Link
to other related information
|
| EIA-111/2005 |
| Civil Engineering and Development Department
|
- Applicant was informed on 30 Sep 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from 15 Oct 2005 to
13 Nov 2005.
During the period,
4 sets of written comments were received from
members of the public.
- Approved without conditions on 8 Dec 2005.
- Register No.: AEIAR-092/2005
Link
to other related information |
| EIA-110/2005 |
Drainage Improvements in Southern Lantau
[Executive
Summary]
| [PDF]
| [HTML]
[EIA
Report] [PDF]
| [HTML]
|
Drainage Services Department |
- Applicant was informed on 15 Sep 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public
to comment from 26 Sep 2005 to 25
Oct 2005. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 5 Dec 2005.
- Register No.: AEIAR-093/2005
Link
to other related information
|
| EIA-109/2005 |
Road P1 Advance Works at Yam O on Lantau Island
[Executive
Summary]
[PDF] | [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML]
|
Civil Engineering and Development
Department
|
- Applicant was informed on 30 June 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to
9 August 2005. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 6 Sep 2005.
- Register No.: AEIAR-090/2005
Link
to other related information
|
| EIA-108/2005 |
Drainage Improvement in Tsuen Wan, Kwai Chung and
Tsing Yi, Tsuen Wan Drainage Tunnel
[Executive
Summary]
[PDF] | [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML]
|
Drainage Services Department
|
- Applicant was informed on 23 June 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from 2 July 2005 to
31 July 2005. During the period, no comments were received from members of the
public.
- Approved without conditions on 29 Aug 2005.
- Register No.: AEIAR-088/2005
Link
to other related information
|
| EIA-107/2005 |
Peng Chau Helipad
[Executive
Summary]
[PDF] | [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML]
|
Civil Engineering and Development
Department
|
- Applicant was informed on 23 June 2005 of
the suitability of the report for public inspection.
- Report was exhibited for public to comment from
11 July 2005 to 9 August 2005.
During the period, no comments were received from members of the
public.
- Approved without conditions on 25 Aug 2005.
- Register No.: AEIAR-087/2005
Link
to other related information
|
| EIA-106/2005 |
New Contaminated Mud Marine Disposal
Facility at Airport East / East Sha Chau Area
[Executive
Summary]
[PDF] | [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML] |
Civil Engineering and Development
Department |
- Applicant was informed on 19 May 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from
27 May 2005 to 25 June 2005.
During the period, 7
sets of written comments were received from
members of the public.
- Approved without conditions on 1 Sep 2005.
- Register No.: AEIAR-089/2005
Link
to other related information
|
| EIA-104/2005 |
Development of an EcoPark in Tuen Mun Area
38
[Executive
Summary]
[PDF] | [HTML]
[EIA
Report] [PDF]
| [HTML]
[EM&A
Manual] [PDF]
| [HTML] |
Environmental Protection Department
|
- Applicant was informed on 27 April 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from 29 April 2005
to 28 May 2005. During the period,
2 sets of written comments were received from
members of the public.
- Approved without conditions on 29 June
2005.
- Register No.: AEIAR-086/2005
Link
to other related information
|
| EIA-103/2004 |
Trunk Road T4 in Sha Tin
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
Civil Engineering and Development Department
|
- Applicant was informed on 25 Feb 2005 of the suitability
of the report for public inspection.
- Report was exhibited for public to comment from 8 March 2005 to
6 April 2005. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 3 May 2005.
- Register No.: AEIAR-084/2005
Link
to other related information
|
| EIA-101/2004 |
Drainage Improvements in Sai Kung
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML] |
Drainage Services Department |
- Applicant was informed on 16 Feb 2005
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from
1 March 2005 to 30 March 2005.
During the period, 5
sets of written comments were received from
members of the public.
- Approved with conditions
on 20 Apr 2005.
- Register No.: AEIAR-085/2005
Link
to other related information
|
| EIA-100/2004 |
Siu Ho Wan Water Treatment Works Extension
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
Water Supplies Department |
- Applicant was informed on 15 Oct 2004
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2004 to 23
Nov 2004. During the period, no comments were received from members of the
public.
- Approved without conditions on 15 Dec 2004.
- Register No.: AEIAR-082/2004
Link
to other related information |
| EIA-099/2004 |
Renewable Energy by a Wind Turbine System
on Lamma Island
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
The Hongkong Electric Co. Ltd. |
- Applicant was informed on 6 Sep 2004 of
the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sept 2004 to
9 Oct 2004. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 27 Oct 2004.
- Register No.: AEIAR-080/2004
Link
to other related information |
| EIA-098/2004 |
Kowloon Southern Link
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
Kowloon-Canton Railway Corporation
|
- Applicant was informed on 7 Sep 2004 of the suitability
of the report for public inspection..
- Report was exhibited for public to comment from 18 Jan 2005 to
16 Feb 2005. During the period,
1 set of written comments
was received from
members of the public.
- Approved with conditions
on 30 Mar 2005.
- Register No.: AEIAR-083/2005
Link
to other related information
|
| EIA-097/2004 |
Tai Po Sewage Treatment Works Stage V
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
Drainage Services Department |
- Applicant was informed on 26 Aug 2004
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 03 Sept 2004 to
02 Oct 2004. During the period, 1
set of written comments was received from
members of the public.
- Approved without conditions on 28 Oct 2004.
- Register No.: AEIAR-081/2004
Link
to other related information |
| EIA-096/2004 |
Peng Chau Sewage Treatment Works Upgrade
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
Drainage Services Department |
- Applicant was informed on 24 Aug 2004
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Sept 2004 to
30 Sept 2004. During the period, 2
sets of written comments were received from
members of the public.
- Approved without conditions on 29 Oct 2004.
- Register No.: AEIAR-079/2004
Link
to other related information |
| EIA-094/2004 |
Yuen Long and Kam Tin Sewerage and Sewage
Disposal Stage 2
[Executive
Summary][PDF]
| [HTML]
[EIA
Report][PDF]
| [HTML]
[EM&A
Manual][PDF]
| [HTML]
|
Drainage Services Department |
- Applicant was informed on 17 Mar 2004
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Apr 2004 to 22
May 2004. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 17 Jun 2004.
- Register No.: AEIAR-078/2004
Link
to other related information |
| EIA-093/2004 |
Improvements to San Tin Interchange
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
Highways Department |
- Applicant was informed on 1 Mar 2004 of
the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Mar 2004 to 7
Apr 2004. During the period, no comments were received from members of the
public.
- Approved without conditions on 3 May 2004.
- Register No.: AEIAR-077/2004
Link
to other related information |
| EIA-092/2003 |
Reprovisioning of Diamond Hill Crematorium
[Executive
Summary][HTML]
| [PDF]
[EIA
Report] [HTML]
| [PDF]
[EM&A
Manual] [HTML]
| [PDF]
|
Architectural Services Department |
- Applicant was informed on 5 Jan 2004 of
the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Jan 2004 to 10
Feb 2004. During the period,
4 sets of written comments were received from
members of the public.
- Approved with conditions
on 30 Mar 2004.
- Register No.: AEIAR-076/2004
Link
to other related information |
| EIA-091/2003 |
Outlying Islands Sewerage Stage 1, Phase
II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal
Facilities
[Executive
Summary][HTML]
| [PDF]
[EIA
Report] [HTML]
| [PDF]
[EM&A
Manual] [HTML]
| [PDF]
|
Drainage Services Department |
- Applicant was informed on 23 Jun 2003
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2003 to 20
Sep 2003. During the period,
1 set of written comments
was received from
members of the public.
- Approved with conditions
on 25 Oct 2003.
- Register No.: AEIAR-075/2003
Link
to other related information |
| EIA-090/2003 |
Tung Chung - Ngong Ping Cable Car Project
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
MTR Corporation Limited |
- Applicant was informed on 27 Mar 2003
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2003 to 27
Apr 2003. During the period, 11
sets of written comments were received from
members of the public.
- Approved with conditions
on 9 Jun 2003.
- Register No.: AEIAR-074/2003
Link
to other related information |
| EIA-089/2003 |
The Proposed Submarine Gas Pipelines from
Cheng Tou Jiao Liquefied Natural Gas Receiving Terminal, Shenzhen
to Tai Po Gas Production Plant, Hong Kong
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
The Hong Kong and China Gas Company Limited |
- Applicant was informed on 27 Feb 2003
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Mar 2003 to 3
Apr 2003. During the period,
1 set of written comments
was received from
members of the public.
- Approved without conditions on 23 Apr 2003.
- Register No.: AEIAR-071/2003
Link
to other related information |
| EIA-088/2002 |
Lamma Power Station Navigation Channel Improvement
[Executive
Summary] (html)
| (pdf)
[EIA
Report] (html)
| (pdf)
[EM&A
Manual] (html)
| (pdf)
|
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 18 Jan 2003
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jan 2003 to 23
Feb 2003. During the period, no comments were received from members of the
public.
- Approved without conditions on 11 Mar 2003.
- Register No.: AEIAR-069/2003
Link
to other related information |
| EIA-087/2002 |
Cement Silos addition work in Tai Po Cement
Depot
[Executive
Summary] (html)
| (pdf)
[EIA
Report] (html)
| (pdf)
|
K.WAH MATERIALS LTD. |
- Applicant was informed on 14 Jan 2003
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Jan 2003 to 15
Feb 2003. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions
on 13 May 2003.
- Register No.: AEIAR-073/2003
Link
to other related information |
| EIA-086/2002 |
Upgrading and expansion of San Wai Sewage
Treatement Works and expansion of Ha Tsuen Pumping Station
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
Drainage Services Department |
- Applicant was informed on 23 Dec 2002
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Feb 2003 to 26
Mar 2003. During the period, no comments were received from members of the
public.
- Approved without conditions on 12 May 2003.
- Register No.: AEIAR-072/2003
Link
to other related information |
| EIA-085/2002 |
Proposed Joint User Complex and Wholesale
Fish Market at Area 44, Tuen Mun
[Executive
Summary] (html)
| (pdf)
[EIA
Report] (html)
| (pdf)
[EM&A
Manual] (html)
| (pdf)
|
Architectural Services Department |
- Applicant was informed on 30 Oct 2002
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2002 to 18
Dec 2002. During the period, 1071 sets of written comments were received from members of the public.
- Approved with conditions
on 14 Mar 2003.
- Register No.: AEIAR-070/2003
Link
to other related information |
| EIA-083/2002 |
Feasibility Study for Housing Development
at Whitehead & Lee On in Man On Shan
[Executive
Summary] (html)
| (pdf)
[EIA
Report] (html)
| (pdf)
[EM&A
Manual] (html)
| (pdf)
|
Territory Development Department |
- Applicant was informed on 18 Oct 2002
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Oct 2002 to 29
Nov 2002. During the period, 4 sets of written comments were received from members of the public.
- Approved without conditions on 18 Dec 2002.
- Register No.: AEIAR-068/2002
Link
to other related information |
| EIA-082/2002 |
Shenzhen Western Corridor
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
Highways Department |
- Applicant was informed on 9 Sep 2002 of
the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Sep 2002 to 10
Oct 2002. During the period, 1 set of written
comment was received from members of the public.
- Approved with conditions
on 4 Nov 2002.
- Register No.: AEIAR-067/2002
Link
to other related information |
| EIA-081/2002 |
Construction of Lung Kwu Chau Jetty
[Executive
Summary] (pdf)
| (html)
[EIA
Report] (pdf)
| (html)
[EM&A
Manual] (pdf)
| (html)
|
Civil Engineering Department |
- Applicant was informed on 19 Sep 2002
of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2002 to 27
Oct 2002.
During the period, no comments were received from members of the public.
- Approved with conditions
on 1 Nov 2002.
- Register No.: AEIAR-066/2002
Link
to other related information |
| EIA-079/2002 |
Ngong Ping Sewage Treatment Works
and Sewerage
[Executive
Summary] (pdf)
| (html)
[EIA
Report] (pdf)
| (html)
[EM&A
Manual] (pdf)
| (html)
|
Drainage Services Department |
- Applicant was informed on 29
Aug 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2002 to 28
Sep 2002. During the period, 3 sets of written comments were received from members of the public.
- Approved
without conditions on 12 Nov 2002.
- Register No.: AEIAR-065/2002
Link
to other related information |
| EIA-078/2002 |
Deep Bay Link
[Executive
Summary]
[EIA
Report]
[EM&A Manual] |
Highways Department |
- Applicant was informed on 10
Jul 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Jul 2002
to 21 Aug 2002. During the period, 5 sets of written comments were received from members of the public.
- Approved with conditions
on 13 Sep 2002.
- Register No.: AEIAR-064/2002
Link
to other related information |
| EIA-077/2002 |
Permanent Aviation Fuel Facility
for Hong Kong International Airport
|
Airport Authority Hong Kong |
The Court of Final Appeal
ordered on 17 Jul 2006 that the decision of the Director made on 2
Aug 2002 approving the EIA report be quashed.
Link
to other related information |
| EIA-076/2002 |
Fill Bank at Tseung Kwan O Area
137
[Executive
Summary] (pdf)
| (html)
[EIA
Report] (pdf)
| (html)
|
Civil Engineering Department |
- Applicant was informed on 8
May 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 May 2002 to 14
Jun 2002.
During the period, no comments were received from members of the public.
- Approved without conditions on 27 Jun 2002.
- Register No.: AEIAR-060/2002
Link
to other related information |
| EIA-075/2002 |
Improvement to Tung Chung Road
between Lung Tseng Tau and Cheung Sha
[Executive
Summary]
[EIA
Report]
[EM&A
Manual] |
Highways Department |
- Applicant was informed on 7
May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 May 2002
to 12 Jun 2002.
During the period, 3 sets of written comments were received from
members of the public.
- Approved with conditions
on 4 Jul 2002.
- Register No.: AEIAR-061/2002
Link
to other related information |
| EIA-074/2002 |
Yuen Long and Kam Tin Sewerage
and Sewage Disposal Stage 1 Packages 1A-1T and 1B-1T - Kam Tin Trunk
Sewerage Phase I and II
[Executive
Summary]
[EIA
Report] |
Drainage Services Department |
- Applicant was informed on 7
May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Jun 2002
to 10 Jul 2002. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 26 Aug 2002.
- Register No.: AEIAR-063/2002
Link
to other related information |
| EIA-073/2001 |
Yau Tong Bay Development - Engineering
Feasibility Study for the Comprehensive Development at Yau Tong Bay
[Executive
Summary]
[EIA
Report] |
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15
Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to
2 Mar 2002.
During the period, no comments were received from members of the public.
- Approved with conditions
on 8 Apr 2002.
- Register No.: AEIAR-054/2002
Link
to other related information |
| EIA-072/2001 |
Decommissioning of Cheoy Lee
Shipyard at Penny's Bay
[Executive
Summary] (pdf)
| (html)
[EIA
Report] (pdf)
| (html)
|
Civil Engineering Department |
- Applicant was informed on 9 Feb 2002
of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 21 Feb 2002
to 22 Mar 2002.
During the period, 4 sets of written comments were received from
members of the public.
- Approved without conditions on
24 Apr 2002.
- Register No.: AEIAR-055/2002
Link
to other related information
|
| EIA-071/2001 |
Sheung Shui to Lok Ma Chau Spur
Line
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 2
Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Jan 2002 to
5 Feb 2002.
During the period, 87 sets of written comments were received from
members of the public.
- Approved with conditions
on 11 Mar 2002.
- Register No.: AEIAR-052/2002
Link
to other related information |
| EIA-069/2001 |
Reclamation of Yau Tong Bay
[Executive
Summary]
[EIA
Report] |
Maunsell Consultants Asia Limited |
- Applicant was informed on 15
Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to
2 Mar 2002.
During the period, no comments were received from members of the public.
- Approved with conditions
on 8 Apr 2002.
- Register No.: AEIAR-053/2002
Link
to other related information |
| EIA-068/2001 |
Planning and Engineering Feasibility
Study for Sham Tseng Development
[Executive
Summary]
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 10 Jan 2002
of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jan 2002
to 23 Feb 2002.
During the period, 184 sets of written comments were received from
members of the public.
- Approved with conditions
on 2 May 2002.
- Register No.: AEIAR-057/2002
Link
to other related information
|
| EIA-067/2001 |
Widening of Yuen Long Highway
between Lam Tei and Shap Pat Heung Interchange
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 14 Dec 2001
of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002
to 1 Feb 2002. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 22 May 2002.
- Register No.: AEIAR-059/2002
Link
to other related information
|
| EIA-066/2001 |
The Decommissioning of Underground
Fuel Tanks at Tsuen Wan No.1 Pumping Station
[Executive
Summary]
[EIA
Report] |
Water Supplies Department |
- Applicant was informed on 13
Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 22 Dec 2001
to 20 Jan 2002.
During the period, no comments were received from members of the public.
- Approved with conditions
on 9 Feb 2002.
- Register No.: AEIAR-050/2002
Link
to other related information |
| EIA-065/2001 |
132 KV Supply Circuit from Pui
O via Chi Ma Wan Peninsula via Sea Crossing towards Cheung Chau
[Executive
Summary]
[EIA
Report] |
CLP Power Hong Kong Limited |
- Applicant was informed on 14
Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to
1 Feb 2002. During the period, 2
sets of written comments were received from
members of the public.
- Approved with conditions
on 28 Feb 2002.
- Register No.: AEIAR-051/2002
Link
to other related information |
| EIA-064/2001 |
Demolition of Buildings and Structures
in the Proposed Kennedy Town Comprehensive Development Area Site
[Executive
Summary]
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 20
Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Dec 2001 to
5 Jan 2002. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 16 Apr 2002.
- Register No.: AEIAR-058/2002
Link
to other related information |
| EIA-063/2001 |
Replacement of Cremators at Fu
Shan Crematorium
[Executive
Summary]
[EIA
Report] |
Architectural Services Department |
- Applicant was informed on 9
Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 Nov 2001
to 23 Dec 2001.
During the period, no comments were received from members of the public.
- Approved with conditions
on 4 Jan 2002.
- Register No.: AEIAR-048/2002
Link
to other related information |
| EIA-062/2001 |
Demolition of Kwai Chung Incineration
Plant
[Executive
Summary]
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 13
Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Nov 2001
to 19 Dec 2001.
During the period, no comments were received from members of the public.
- Approved with conditions
on 9 Jan 2002.
- Register No.: AEIAR-049/2002
Link
to other related information |
| EIA-061/2001 |
Tseung Kwan O Roads D1, D8 and
D10
[Executive
Summary] (pdf)
| (html)
[EIA
Report] |
Territory Development Department |
- Applicant was informed on 11
Oct 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2001 to 16
Nov 2001.
During the period, no comments were received from members of the public.
- Approved with conditions
on 23 Nov 2001.
- Register No.: AEIAR-046/2001
Link
to other related information |
| EIA-060/2001 |
Proposed Headquarters and Bus
Maintenance Depot in Chai Wan
[Executive
Summary]
[EIA
Report] |
Citybus Limited |
- Applicant was informed on 11
Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2001 to 14
Sep 2001.
During the period, no comments were received from members of the public.
- Approved with conditions
on 26 Sep 2001.
- Register No.: AEIAR-045/2001
Link
to other related information |
| EIA-059/2001 |
Comprehensive Feasibility Study
for The Revised Scheme of South East Kowloon Development
[Executive
Summary]
[EIA
Report] |
Territory Development Department |
- Applicant was informed on 30
Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 July 2001 to
29 Aug 2001. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 25 Sep 2001.
- Register No.: AEIAR-044/2001
Link
to other related information |
| EIA-058/2001 |
Wanchai Development phase II
[Executive
Summary]
(html)
[EIA
Report] |
Territory Development Department |
- Applicant was informed on 7
Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to
15 Aug 2001. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 31 Aug 2001.
- Register No.: AEIAR-042/2001
Link
to other related information |
| EIA-057/2001 |
Central - Wan Chai Bypass and
Island Eastern Corridor Link
[Executive
Summary]
(html)
[EIA
Report] |
Highways Department |
- Applicant was informed on 7
Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to
15 Aug 2001. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 31 Aug 2001.
- Register No.: AEIAR-041/2001
Link
to other related information |
| EIA-056/2001 |
Lei Yue Mun Road Underpass, Modification
at Junction with Yau Tong Road and Associated Improvement Works -
Feasibility Study
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 6
Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2001 to 27
Oct 2001. During the period, 1236 sets of written comments were received from members of the public.
- Approved with conditions
on 21 Feb 2002.
- Register No.: AEIAR-056/2001
Link
to other related information |
| EIA-055/2001 |
Central Reclamation Phase III
- Studies, Site Investigation, Design and Construction
[Executive
Summary]
(html)
[EIA
Report]
[EM&A
Manual]
|
Territory Development Department |
- Applicant was informed on 7
Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to
15 Aug 2001. During the period, no comments were received from members of the
public.
- Approved with conditions
on 31 Aug 2001.
- Register No.: AEIAR-040/2001
Link
to other related information |
| EIA-054/2001 |
Improvement to Castle Peak Road
between Ka Loon Tsuen and Siu Lam
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 31
Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Aug 2001 to 15
Sep 2001. During the period, 4 sets of written comments were received from members of the public.
- Approved with conditions
on 5 Dec 2001.
- Register No.: AEIAR-047/2001
Link
to other related information |
| EIA-053/2001 |
Modifications to MTRC Tsim Sha
Tsui Station
[Executive
Summary]
(html)
[EIA
Report] |
MTR Corporation Limited |
- Applicant was informed on 12
Jul 2001 of the suitability of the report for public inspection.
- Report was informed for public to comment from 20 July 2001 to 18
Aug 2001. During the period,
2 sets of written comments were received from members of the public.
- Approved with conditions
on 12 Sep 2001.
- Register No.: AEIAR-043/2001
Link
to other related information |
| EIA-049/2000 |
West Kowloon Reclamation Contract
No. WK30-Remaining Roadworks Stage 4, Link Roads G & L
[Executive
Summary]
[EIA
Report] |
Kowloon Development Office, Territory
Development Department |
- Applicant was informed on 31
Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 2000
to 14 Dec 2000. During the period, no comments were received from members of the
public.
- Approved with conditions
on 10 Jan 2001.
- Register No.: AEIAR-038/2001
Link
to other related information |
| EIA-047/2000 |
Proposed RMC Concrete Batching
Plant at Telegraph Bay for Cyber-Port Development
[Executive
Summary] (pdf)
|
(html)
[EIA
Report] |
Cyber-Port Limited |
- Applicant was informed on 21
Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Nov 2000
to 13 Dec 2000. During the period,
2 sets of written comments were received from members of the public.
- Approved with conditions
on 15 Jan 2001.
- Register No.: AEIAR-039/2001
Link
to other related information |
| EIA-043/2000 |
Agreement No. CE 73/98 Investigation
Assignment for Widening of Tolo Highway/Fanling Highway between Island
House Interchange and Fanling - Environmental Impact Assessment
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 17
May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 May 2000
to 24 Jun 2000.
During the period, no comments were received from members of the public.
- Approved with conditions
on 14 Jul 2000.
- Register No.: AEIAR-037/2000
Link
to other related information |
| EIA-042/2000 |
Tai O Sheltered Boat Anchorage
- Environmental & Drainage Impact Assessment - Environmental Impact
Assessment
[Executive
Summary]
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 08
May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 May 2000
to 22 Jun 2000.
During the period, no comments were received from members of the public.
- Approved with conditions
on 12 Jul 2000.
- Register No.: AEIAR-036/2000
Link
to other related information |
| EIA-041/2000 |
Construction of an International
Theme Park in Penny's Bay of North Lantau together with its Essential
Associated Infrastructures - Environmental Impact Assessment
[Executive
Summary]
(pdf)
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 11
Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000
to 11 Apr 2000. During the period, 7
sets of written comments were received from
members of the public.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr
and 17 Apr 2000.
- Approved with conditions
on 28 Apr 2000.
- Register No.: AEIAR-032/2000
Link
to other related information |
| EIA-040/2000 |
Northshore Lantau Development
Feasibility Study - Environmental Impact Assessment
[Executive
Summary] (pdf)
[EIA
Report] |
Civil Engineering Department |
- Applicant was informed on 11
Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000
to 11 Apr 2000. During the period, 5
sets of written comments were received from
members of the public.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr
and 17 Apr 2000.
- Approved with conditions
on 28 Apr 2000.
- Register No.: AEIAR-031/2000
Link
to other related information |
| EIA-039/2000 |
Shenzhen River Regulation Project
Stage III - Environmental Impact Assessment
[Executive
Summary]
[EIA
Report] |
Drainage Services Department |
- Applicant was informed on 27
Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Apr 2000
to 10 May 2000. During the period, no comments were received from members of the
public.
- Approved with conditions
on 8 Jun 2000.
- Register No.: AEIAR-035/2000
Link
to other related information |
| EIA-038/2000 |
Tuen Mun Sewerage - Eastern coastal
Sewerage Extension - Environmental Impact Assessment
[Executive
Summary]
[EIA
Report] |
Drainage Services Department |
- Applicant was informed on 27
Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Apr 2000
to 12 May 2000. During the period, no comments were received from members of the
public.
- Approved with conditions
on 7 June 2000.
- Register No.: AEIAR-034/2000
Link
to other related information |
| EIA-036/1999 |
East Rail - Extension - Hung
Hom To Tsim Sha Tsui - Environmental Impact Assessment
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 27
Jan 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Feb 2000
to 23 Mar 2000. During the period, 6
sets of written comments were received from
members of the public.
- Approved with conditions
on 24 May 2000.
- Register No.: AEIAR-033/2000
Link
to other related information |
| EIA-034/1999 |
New World First Bus Permanent
Depot at Chai Wan
[Executive
Summary]
[EIA
Report] |
New World First Bus Services
Limited |
- Applicant was informed on 09
Dec 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Dec 1999
to 12 Jan 2000. During the period, 2
sets of written comments were received from
members of the public.
- Approved with conditions
on 25 Jan 2000.
- Register No.: AEIAR-029/2000
Link
to other related information |
| EIA-033/1999 |
Route 10 North Lantau to Yuen
Long Highway Investigation and Preliminary Design (Southern Section)
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 23
Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Nov 1999
to 29 Dec 1999. During the period, 4
sets of written comments were received from
members of the public.
- Approved with conditions
on 02 Feb 2000.
- Register No.: AEIAR-030/2000
Link
to other related information |
| EIA-031/1999 |
Light Rail Transit (LRT) Extension
in Tin Shui Wai Reserve Zone and Grade Separation of the LRT with
Pui To Road and Tsing Lung Road in Tuen Mun
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18
Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999
to 25 Dec 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 06 Jan 2000.
- Register No.: AEIAR-027/1999
Link
to other related information |
| EIA-030/1999 |
Tin Shui Wai Phase 4 Rail Extension
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18
Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999
to 25 Dec 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 06 Jan 2000.
- Register No.: AEIAR-026/1999
Link
to other related information |
| EIA-029/1999 |
132 kV Overhead Pole Line &
Underground Cable from the Existing Po Lam Substation to the Existing
Tui Min Hoi Substation - Circuit No.2
[Executive
Summary]
[EIA
Report] |
CLP Power Hong Kong Limited |
- Applicant was informed on 28
Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 05 Nov 1999
to 04 Dec 1999. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 22 Dec 1999.
- Register No.: AEIAR-023/1999
Link
to other related information |
| EIA-028/1999 |
Hebe Haven Yacht Club Development
- Phase 2 Environmental Impact Assessment Study
[Executive
Summary]
[EIA
Report] |
Halcrow China Limited |
- Applicant was informed on 28
Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 1999
to 14 Dec 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 03 Jan 2000.
- Register No.: AEIAR-024/1999
Link
to other related information |
| EIA-027/1999 |
East Rail Extensions - Tai Wai
to Ma On Shan
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 19
Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Oct 1999
to 18 Nov 1999. During the period, 11 sets of written comments were received from members of the public.
- Approved with conditions
on 15 Jan 2000.
- Register No.: AEIAR-028/1999
Link
to other related information |
| EIA-026/1999 |
Essential Public Infrastructure
Works with West Rail Stations (the Eastern Access Road)
[Executive
Summary]
[EIA
Report] |
Kowloon-Canton Railway Corporation |
- Applicant was informed on 30
Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 02 Oct 1999
to 31 Oct 1999. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 28 Dec 1999.
- Register No.: AEIAR-025/1999
Link
to other related information |
| EIA-025/1999 |
Route 9 between Tsing Yi and
Cheung Sha Wan
[Executive
Summary]
[EIA
Report] |
Major Works Project Management
Office, Highways Department |
- Applicant was informed on 13
Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Aug 1999
to 21 Sep 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 19 Oct 1999.
- Register No.: AEIAR-018/1999
Link
to other related information |
| EIA-024/1999 |
Widening and Reconstruction of
Tai Po Road (Sha Tin Section)
[Executive
Summary]
[EIA
Report] |
Major Works Project Management
Office, Highways Department |
- Applicant was informed on 09
Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Sep 1999
to 14 Oct 1999. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 19 Nov 1999.
- Register No.: AEIAR-020/1999
Link
to other related information |
| EIA-023/1999 |
Tseung Kwan O Development - Contract
F: Grade Separated Interchange T1/P1/P2
[Executive
Summary]
[EIA
Report] |
N.T. East Development Office,
Territory Development Department |
- Applicant was informed on 31
Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999
to 13 Oct 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 20 Oct 1999.
- Register No.: AEIAR-017/1999
Link
to other related information |
| EIA-022/1999 |
Sha Tin Sewage Treatment Works,
Stage III Extension - Environmental Impact Assessment Study
[Executive
Summary]
[EIA
Report] |
Drainage Services Department |
- Applicant was informed on 03
Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 17 Sep 1999
to 16 Oct 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 05 Nov 1999.
- Register No.: AEIAR-021/1999
Link
to other related information |
| EIA-021/1999 |
Feasibility Study on the Alternative
Alignment for the Western Coast Road, Tseung Kwan O
[Executive
Summary]
[EIA
Report] |
N.T. East Development Office,
Territory Development Department |
- Applicant was informed on 01
Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999
to 13 Oct 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 20 Oct 1999.
- Register No.: AEIAR-016/1999
Link
to other related information |
| EIA-020/1999 |
Route 16 Investigation Assignment
from West Kowloon to Sha Tin - Alternative Alignment Environmental
Impact Assessment
[Executive
Summary]
[EIA
Report] |
Major Works Project Management
Office, Highways Department |
- Applicant was informed on 30
Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 03 Sep 1999
to 02 Oct 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 05 Nov 1999.
- Register No.: AEIAR-022/1999
Link
to other related information |
| EIA-018/1999 |
Sai Sha Road Widening between
Kam Ying Road and proposed Road T7 Junction
[Executive
Summary]
[EIA
Report] |
Highways Department |
- Applicant was informed on 13
Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 27 Aug 1999
to 25 Sep 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 19 Oct 1999.
- Register No.: AEIAR-014/1999
Link
to other related information |
| EIA-017/1999 |
Essential Public Infrastructure Works associated
with West Rail Stations in Yuen Long Tin Shui Wai and Tuen Mun Centre
[Executive
Summary]
[EIA
Report](June 1999)
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 22
June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jun 1999
to 24 Jul 1999. During the period, 3 sets of written comments were received from members of the public.
- Approved with conditions
on 20 Aug 1999.
- Register No.: AEIAR-012/1999
Link
to other related information |
| EIA-016/1999 |
EIA for Salisbury Road Underpass
and Associated Road Improvement Works (including Middle Road Circulation
System)
[Executive
Summary]
[EIA
Report](June 1999) |
Highways Department |
- Applicant was informed on 21
Jun 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Jun 1999
to 29 Jul 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 26 Aug 1999.
- Register No.: AEIAR-013/1999
Link
to other related information |
| EIA-015/1999 |
Planning and Development Study
of Potential Housing Site in Area 54, Tuen Mun
[Executive
Summary]
[EIA
Report](June 1999) |
N.T. West Development Office,
Territory Development Department |
- Applicant was informed on 24
June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 09 Jul 1999
to 08 Aug 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 03 Sep 1999.
- Register No.: AEIAR-015/1999
Link
to other related information |
| EIA-014/1999 |
Main Drainage Channels and Poldered
Village Protection Schemes for San Tin, NWNT EIA Study
[Executive
Summary]
[EIA
Report](April 1999) |
N.T. North Development Office,
Territory Development Department |
- Applicant was informed on 04
June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Jun 1999
to 13 Jul 1999. During the period,
4 sets of written comments were received from
members of the public.
- Approved with conditions
on 14 Sep 1999.
- Register No.: AEIAR-019/1999
Link
to other related information |
| EIA-013/1999 |
Tang Lung Chau Dangerous Goods Anchorage
[Executive
Summary]
[EIA
Report] |
N.T. West Development Office, Territory
Development Department |
- Applicant was informed on 20 May 1999
of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 01 Jun 1999
to 30 Jun 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 17 Jul 1999.
- Register No.: AEIAR-011/1999
Link
to other related information |
| EIA-011/1999 |
Infrastructural Works for the Proposed Development
at Telegraph Bay - Engineering Feasibility Study
[Executive
Summary]
[EIA
Report] (March 1999) |
Information Technology and Broadcasting
Bureau of the Government for the Hong Kong Special Administrative
Region Department |
- Applicant was informed on 09 Mar 1999
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Mar 1999
to 10 Apr 1999. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 26 Apr 1999.
- Register No.: AEIAR-009/1999
Link
to other related information |
| EIA-009/1998 |
1,800 MW Gas-fired Power Station at Lamma
Extension
[Executive
Summary]
[EIA
Report] (February 1999)
|
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 19 Feb 1999
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 05 Mar 1999
to 03 Apr 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 05 May 1999.
- Register No.: AEIAR-010/1999
Link
to other related information |
| EIA-008/1998 |
Planning and Engineering Feasibility Study
for Development near Choi Wan Road and Jordan Valley
[Executive
Summary]
[EIA
Report] (January 1999) |
Civil Engineering Department |
- Applicant was informed on 09 Feb 1999
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Feb 1999
to 15 Mar 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 20 Apr 1999.
- Register No.: AEIAR-008/1999
Link
to other related information |
| EIA-007/1998 |
Footbridge and Improvement to Ap Lei Chau
Bridge Road and Ap Lei Chau Drive
[Executive
Summary]
[EIA
Report]
(January 1999) |
Highways Department |
- Applicant was informed on 04 Jan 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 08 Jan 1999
to 06 Feb 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 24 Feb 1999.
- Register No.: AEIAR-005/1999
Link
to other related information |
| EIA-006/1998 |
Dredging an Area of Kellett Bank for Reprovisioning
of Six Government Mooring Buoys
[Executive
Summary]
[EIA
Report]
(December 1998) |
Civil Engineering Department |
- Applicant was informed on 28 Nov 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998
to 8 Jan 1999. During the period, 1 set of written comments was received from members of
the public.
- Approved without conditions on 01 Mar 1999.
- Register No.: AEIAR-006/1999
Link
to other related information |
| EIA-005/1998 |
Planning and Engineering Feasibility Study
for Development at Anderson Road
[Executive
Summary]
[EIA
Report]
(September 1998)
|
Civil Engineering Department |
- Applicant was informed on 04 Dec 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998
to 08 Jan 1999. During the period, no comments were received from members of the
public.
- Approved with conditions
on 02 Mar 1999.
- Register No.: AEIAR-007/1999
Link
to other related information |
| EIA-004/1998 |
Yuen Long Bypass Floodway - Feasibility
Study
[Executive
Summary]
|
Territory Development Department |
- Applicant was informed on 31 Jul 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 14 Aug 1998
to 12 Sep 1998. During the period, no comments were received from members of the
public.
- Approved without condition on 10 Oct 1998.
- Register No.: AEIAR-003/1998
Link
to other related information |
| EIA-003/1998 |
Kai Tak Airport North Apron Decomissioning
[Executive
Summary]
|
Territory Development Department |
- Applicant was informed on 25 Jun 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 03 Jul 1998
to 02 Aug 1998. During the period, 1 set of written comments was received from members of
the public.
- Approved with conditions
on 04 Sep 1998.
- Register No.: AEIAR-002/1998
Link
to other related information |
| EIA-002/1998 |
Tsuen Wan Bay Further Reclamation, Area
35, Tsuen Wan Engineering, Planning and Environmental Investigation
[Executive
Summary]
[EIA
Report]
[EM&A
Manual]
|
N.T. West Development Office |
- Applicant was informed on 15 Jun 1998
of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 25 Sep 1998
to 24 Oct 1998. During the period, no comments were received from members of the
public.
- Approved with conditions
on 24 Nov 1998.
- Register No.: AEIAR-004/1998
Link
to other related information |
| EIA-001/1998 |
Pak Shek Kok Development
[Executive
Summary]
[EIA
Report]
[EM&A
Manual]
|
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15 Jun 1998
on the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 19 Jun 1998
to 18 Jul 1998. During the period, no comments were received from members of the
public.
- Approved with conditions
on 10 Aug 1998.
- Register No.: AEIAR-001/1998
Link
to other related information |