|
|
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau |
|
|
Asia-America Gateway (AAG) Cable Network, South Lantau |
|
|
Black Point Gas Supply Project |
|
|
Central Reclamation Phase III - Studies, Site Investigation, Design
and Construction |
|
|
Central-Wanchai Bypass & Island Eastern Corridor Link |
|
|
Connection of Existing 400kV Transmission Circuit to Lai Chi Kok 400kV Substation |
|
|
Construction of Covered Walkway in the Courtyard of the Former Kowloon British School, Tsim Sha Tsui |
|
|
Construction of a Secondary Boundary Fence and new sections of Primary Boundary
Fence and Boundary Patrol Road |
|
|
Control of Water Pollution at Jordan Valley Box Culvert - Sewage Pumping Station (JVBCSPS) |
|
|
Decommissioning and disposal of clinical waste incinerators at Yan Chai Hospital |
|
|
Decommissioning of Gas Turbine Units (GT3 - GT6) Inside Castle Peak
Power Station |
|
|
Decommissioning of the Co-Combustion Pilot Plant at Tap Shek Kok |
|
Decommissioning of the Former Kai Tak Airport other than the North Apron |
|
|
Deep Bay Link |
|
|
Demolition of Buildings and Structures in the Proposed Kennedy Town
Comprehensive Development Area Site |
|
|
Demolition of Kwai Chung Incineration Plant |
|
|
Desilting Works at Hung Shui Kiu Channel, Tuen Mun |
|
|
Development of a 100MW Offshore Wind Farm in Hong Kong |
|
|
Development of a Bathing Beach at Lung Mei, Tai Po |
|
|
Development of a Biodiesel
Plant at Tseung Kwan O Industrial Estate |
|
|
Development of a Grease Trap Waste Treatment Facility at West Kowloon Transfer Station |
|
|
Development of an EcoPark in Tuen Mun Area 38 |
|
|
District Distributor Road D3 and associated Cross Channel Bridge between Tin Wah Road roundabout and Tin Shui Wai Reserve Zone |
|
|
Drainage Improvements in Northern Hong Kong Island - Hong Kong West Drainage Tunnel |
|
|
Drainage Improvements in Northern New Territories - Package C |
|
|
Drainage Improvements in Sha Tin and Tai Po |
|
|
Drainage Improvements in Southern Lantau |
|
|
Drainage Improvement in Tsuen Wan, Kwai Chung & Tsing
Yi - Tsuen Wan Drainage Tunnel |
|
|
Drainage Improvement Works in Upper Tai Po River |
|
|
Dredging Works for Proposed Cruise Terminal at Kai Tak |
|
|
|
|
|
|
|
|
|
|
|
Extension of Ma On Shan Salt Water Service Reservoir - Construction of Ma On Shan No.3 Salt Water Service Reservoir |
|
|
Feasibility Study for Housing Development at Whitehead & Lee On in Ma On Shan, Shan Tin |
|
|
Fill Bank at Tseung Kwan O Area 137 |
|
|
Hang Hau Tsuen Channel at Lau Fau Shan |
|
|
Harbour Area Treatment Scheme (HATS) - Provision of Disinfection Facilities at
Stonecutters Island Sewage Treatment Works |
|
|
Harbour Area Treatment Scheme (HATS) Stage 2A |
|
|
Hill-top Transposer Station Expansion at Hill 374, Lam Tsuen Country Park, Short Term Tenancy No. 1985, DD 104 |
|
|
Hill-top Transposer Station Expansion at Castle Peak, Kowloon Peak, Cloudy Hill and Lamma Island |
|
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities |
|
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road |
|
|
Hong Kong Convention and Exhibition Centre, Atrium Link Extension |
|
|
Hong Kong Offshore Wind Farm in Southeastern Waters |
|
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link |
|
|
Improvement of Fresh Water Supply to Cheung Chau |
|
|
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha |
|
|
Improvement Works at Cheung Chau Tung Wan Beach, Kwun Yam Beach and Lo So Shing Beach |
|
|
Improvement Works of Seabed at the Northwest of Tung Wan, Peng Chau |
|
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir |
|
|
Kai Tak Development |
|
|
Kowloon Southern Link |
|
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project |
|
|
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project |
|
|
Landslip Preventive Works at Feature No. 3SE-B/C156
Along Bride's Pool Road, Near Chung Mei Plover Cove Reservoir, Tai Po |
|
|
Lam Tsuen Valley Sewage Pumping Station |
|
|
Landslide Preventive Works at Po Shan, Mid-levels |
|
|
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon
to Sai Ying Pun |
|
|
Ma On Shan Area 108 Pumping Station |
|
|
Main Arena of the 2008 Olympic Equestrian Event |
|
|
Main Drainage Channels and Poldered Village Protection Scheme for
San Tin, NWNT |
|
|
Main Drainage Channels for Ngau Tam Mei, Yuen Long and Kam Tin |
|
|
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area
|
|
|
North East New Territories (NENT) Landfill Extension |
|
|
Organic Waste Treatment Facilities, Phase I |
|
|
Outlying Islands
Sewerage Stage I Phase I Environmental Impact Assessment Report for
Package B, C, D & E |
|
|
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities |
|
|
Pak Shek Kok Development |
|
|
Permanent Aviation Fuel Facility for Hong Kong International Airport |
|
|
Phased Reprovisioning of Cape Collinson Crematorium |
|
|
Planning & Development Study of Potential Housing Site in Area 54 Tuen Mun N.T. |
|
|
Proposed
Comprehensive Development at Wo Shang Wai, Yuen Long |
|
|
Proposed Installation Of 3G Radio Base Station At Long Ke Sai Kung East
Country Park Sai Kung New Territories |
|
|
Proposed Installation of Integrated Mobile Phone Base Station Nearby Fan Lau Country Trail, South Lantau Country Park, Lantau Island, New Territories |
|
|
Proposed Installation of Integrated Mobile Radio Base Station at Lantau South Country Park, Pak Kung Au, N.T. |
|
|
Proposed Installation of Integrated Mobile Phone Base Station at Tai Fung Au Lantau Island N.T. |
|
|
Proposed Installation of Integrated Mobile Phone Base Station at Tai Tong Nursery, Tai Tong Shan Road, Yuen Long, New Territories |
|
Proposed Installation of Mobile Communications Radio Base Station at Lantau South Country Park, Nam Shan, Pui O, N.T. |
|
|
Proposed Installation of Mobile Communications Radio Base Station at Tai Tong Hill Top 297, Yuen Long, N.T. |
|
|
Proposed installation of Integrated Mobile Phone Base Station in Sai Wan Shan, Sai Kung East Country Park, Sai Kung, New Territories |
|
|
Proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun |
|
|
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun |
|
¡@ |
Proposed Temporary Bus Depot at Hing Wah Street West,
West Kowloon Reclamation |
|
|
"Provision of Additional Interchange Connecting Tuen Mun Road and Castle Peak Road Near Sam Shing Estate" And "Widening of Tuen Mun Road at Tsing Tin Interchange" |
|
|
Provision of a Poultry Slaughtering Centre in Sheung Shui |
|
|
Provision of Cremators at Wo Hop Shek Crematorium |
|
|
Proposed Shooting Range at Pillar Point Valley Landfill |
|
|
Proposed 132kV Submarine Cable Route for Airport "A" to Castle Peak Power Station Cable Circuit |
|
|
Renewable Energy Supply on Town Island (also known as Dawn Island) |
|
|
Repositioning and Long Term Operation Plan of Ocean Park |
|
|
Reprovisioning and Upgrading of Salt Water Service Reservoirs in Western
District for Water Supplies Department |
|
|
Reprovisioning of Diamond Hill Crematorium |
|
|
Restoration to Tang Ancestral Hall and its adjoining buildings at Ha Tsuen, Yuen Long, N.T. |
|
|
Restoration to Chik Kwai Study Hall Sheung Tsuen, Pat
Heung, Yuen Long |
|
|
Reuse of Treated Sewage Effluent from Redeveloped Lo Wu Correctional Institution |
|
|
Road Works at West Kowloon |
|
|
Roadside Slope Improvement Works along Ma On Shan Tsuen Road within Ma On Shan Country Park |
|
|
Stream Improvement at Ta Kwu Ling associated with the Resite of Chuk Yuen Village |
|
|
Sewage Pumping Station at Tung Tau Industrial Area, Yuen Long (for PWP item 278CL - Kau Hui Development Phase 1, Engineering Works, Area 16, Yuen Long) |
|
|
Sewage Interception Scheme in Kowloon City Sewage Pumping Stations |
|
|
Sludge Treatment Facilities |
|
|
South-East New Territories Landfill Extension |
|
|
Tai Po Sewage Treatment Works Stage V |
|
|
Tai Po Tai Wo Road Sewage Pumping Station |
|
|
TETRA Radio Base Station at Tai Long Au, Sai Kung East Country Park, Tai Po, New Territories |
|
|
Traffic Improvements to Tuen Mun Road Town Centre Section |
|
|
Tseung Kwan O Area 86 Property Development - Rainwater and Grey Water Recycling |
|
|
Tsim Sha Tsui Station Northern Subway |
|
|
Tsing Lung Tau Pumping Station |
|
|
Tuen Mun Area 54 Sewage Pumping Station |
|
|
Tuen Mun - Chek Lap Kok Link |
|
|
|
|
|
|
|
|
Upgrading of Pillar Point Sewage Treatment Works |
|
|
West New Territories (WENT) Landfill Extensions |
|
|
West Rail - West Kowloon to Tuen Mun Centre |
|
Wan Chai Development Phase II and Central-Wan Chai Bypass |
|
Water Reclamation Facilities for Yuen Long, Sai Kung and Stanley Sewage Treatment Works |
|
Water Reclamation Facilities for Stonecutters Island, Siu Ho Wan and Sham Tseng Sewage Treatment Works |
|
Water Reclamation Facilities in Pumping Station and Preliminary Treatment Works of Drainage Services Department |
|
Water Reclamation Facilities in Shatin Sewage Treatment Works |
|
|
Western Interceptor Sewer Sewage Pumping Station |
|
|
West Island Line |
|
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling |
|
|
Village Flood Protection Works for Sheung Cheung Wai |
|
|
VSNL Intra Asia Submarine Cable System - Deep Water Bay |
|
|
Yuen Long Bypass Floodway - Feasibility Study |
|
|
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement
Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel
KT13 |
|
|
Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Improvement,
Stage 1, Phase 2B - Kam Tin Secondary Drainage Channels KT14 & KT15 |
|
|
Yuen Long Kau Hui No. 2 Sewage Pumping Station |
|
|
10-Year Extended LPM Project, Phase 2, Package G -
Outlying Islands Features in Sok Kwu Wan Lamma Island |