Environmental Impact Assessment Ordinance
EIA PROCESS CONTENT ENQUIRY SITEMAP SEARCH
Hong Kong Environmental Protection Department Hong Kong Special Administrative Region Government
Environmental Impact Assessment Ordinance Legislative Framework Guidance Notes Forms Advertisement Notices The Register

Environmental Impact Assessment Ordinance

[Home] [Search by District]

Project List: disclaimers
copyright
¡@
  • ¡@
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau
  • ¡@
An Extension to the Existing Boardwalk and New Floating Mudflat Bird-watching Hide at Mai Po Nature Reserve for Education and Conservation Purposes
  • ¡@
Asia-America Gateway (AAG) Cable Network, South Lantau
  • ¡@
Castle Peak Cable Tunnel
  • ¡@
Castle Peak Road Improvement between Area 2 and Ka Loon Tsuen, Tsuen Wan, Construction of Reclamation West of Tsing Lung Tau
  • ¡@
Cement Silos Addition Work in Tai Po Cement Depot
  • ¡@
Central Reclamation Phase III - Studies, Site Investigation, Design and Construction
  • ¡@
Constructing and Operating Three Automatic Weather Stations at Pak Kung Au, Tai Fung Au and Ngong Ping on Lantau Island
  • ¡@
De-stratification of Plover Cove Reservoir by Aeration
  • ¡@
Decommissioning and Disposal of Clinical Waste Incinerator at Wai Oi Block of Caritas Medical Centre
  • ¡@
Decommissioning of Gas Turbine Units (GT3 - GT6) Inside Castle Peak Power Station
  • ¡@
Decommissioning of the Former Kai Tak Airport other than the North Apron
  • ¡@
Deep Bay Link
  • ¡@
Demolition of Buildings and Structures in the Proposed Kennedy Town Comprehensive Development Area Site
  • ¡@
Demolition of Kwai Chung Incineration Plant
  • ¡@
Demonstration Scheme on Reclaimed Water Uses in the North District
  • ¡@
Development at Former Marine Police Headquarters KIL 11161
  • ¡@
Development of a Grease Trap Waste Treatment Facility at West Kowloon Transfer Station
  • ¡@
Development of an EcoPark in Tuen Mun Area 38
  • ¡@
Development of SkyCity Golf Course
  • ¡@
Drainage Improvements in Northern Hong Kong Island - Hong Kong West Drainage Tunnel
  • ¡@
Drainage Improvements in Northern New Territories - Package C
  • ¡@
Drainage Improvements in Sai Kung
  • ¡@
Drainage Improvements in Sha Tin and Tai Po
  • ¡@
Drainage Improvements in Southern Lantau
  • ¡@
Drainage Improvement in Tsuen Wan, Kwai Chung & Tsing Yi - Tsuen Wan Drainage Tunnel
  • ¡@
Drainage Improvement Works in Upper Tai Po River
  • ¡@
Dredging at Seabed of Peng Chau, Tung Wan
  • ¡@
  • ¡@
  • ¡@
  • ¡@
Extension of Ma On Shan Salt Water Service Reservoir - Construction of Ma On Shan No.3 Salt Water Service Reservoir
  • ¡@
Fill Bank at Tseung Kwan O Area 137
  • ¡@
Harbour Area Treatment Scheme (HATS) - Provision of Disinfection Facilities at Stonecutters Island Sewage Treatment Works
  • ¡@
Helipad at Yung Shue Wan, Lamma Island
  • ¡@
Hill-top Transposer Station Expansion at Castle Peak, Kowloon Peak, Cloudy Hill and Lamma Island
  • ¡@
Hong Kong Convention and Exhibition Centre, Atrium Link Extension
  • ¡@
Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam
  • ¡@
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
  • ¡@
Improvement to the Ngong Ping Stream
  • ¡@
Improvement Works to Tung Ping Chau Public Pier
  • ¡@
Improvements to San Tin Interchange
  • ¡@
Kowloon Southern Link
  • ¡@
Lamma Power Station Conversion of Two Existing Gas Turbines into a Combined Cycle Unit
  • ¡@
Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
  • ¡@
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
  • ¡@
Landslip Preventive Works at Feature No. 3SE-B/C156 Along Bride's Pool Road, Near Chung Mei Plover Cove Reservoir, Tai Po
  • ¡@
Lam Tsuen Valley Sewage Pumping Station
  • ¡@
Landslide Preventive Works at Po Shan, Mid-levels
  • ¡@
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun
  • ¡@
Liquefied Natural Gas (LNG) Receiving Terminal and Associated Facilities
  • ¡@
Ma On Shan Area 108 Pumping Station
  • ¡@
Main Arena of the 2008 Olympic Equestrian Event
  • ¡@
Main Drainage Channels and Poldered Village Protection Scheme for San Tin, NWNT
  • ¡@
Mass Transit Railway - Lai Chi Kok Station Cheung Lai Street Pedestrian Subway and Entrances Works
  • ¡@
Natural Terrain Hazard Mitigation Works in Luk Keng Wong Uk
  • ¡@
Ngong Ping Sewage Treatment Works and Sewerage
  • ¡@
North East New Territories (NENT) Landfill Extension
  • ¡@
Outlying Islands Sewerage Stage I Phase I Environmental Impact Assessment Report for Package B, C, D & E
  • ¡@
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities
  • ¡@
Pak Shek Kok Development
  • ¡@
Peng Chau Helipad
  • ¡@
Peng Chau Sewage Treatment Works Upgrade
  • ¡@
Permanent Aviation Fuel Facility for Hong Kong International Airport
  • ¡@
Proposed Debris Resisting Barriers at Area N1 North, Discovery Bay, Lantau Island
  • ¡@
Proposed Extension of Public Golf Course at Kau Sai Chau, Sai Kung
  • ¡@
Proposed Improvement Works at Ma Wan Tung Wan Beach
  • ¡@
Proposed Installation of Integrated Mobile Phone Base Station at Pat Sin Leng Country Park, Chung Pui, Tai Po
  • ¡@
Proposed Installation of Integrated Mobile Phone Base Station at Shek Pik Fire Lookout, Lantau Island, N.T.
  • ¡@
Proposed Installation of Integrated Mobile Phone Base Station at South Lantau Island Country Park, Man Cheung Po, Tai O, Hong Kong
  • ¡@
Proposed Installation of Integrated Mobile Phone Base Station at Tai Long Au, Sai Kung East Country Park, Tai Po, N.T.
  • ¡@
Proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun
  • ¡@
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun
  • ¡@
"Provision of Additional Interchange Connecting Tuen Mun Road and Castle Peak Road Near Sam Shing Estate" And "Widening of Tuen Mun Road at Tsing Tin Interchange"
  • ¡@
Proposed Shooting Range at Pillar Point Valley Landfill
  • ¡@
Proposed 132kV Submarine Cable Route for Airport "A" to Castle Peak Power Station Cable Circuit
  • ¡@
Prince Edward Station Pedestrian Subway Extension and Entrance Modification Works
  • ¡@
Relocation of Yiu Lian Floating Dock No. 3
  • ¡@
Replacement of Cremators at Fu Shan Crematorium
  • ¡@
Repositioning and Long Term Operation Plan of Ocean Park
  • ¡@
Reprovisioning and Upgrading of Salt Water Service Reservoirs in Western District for Water Supplies Department
  • ¡@
Reprovisioning of Diamond Hill Crematorium
  • ¡@
Restoration to Chik Kwai Study Hall Sheung Tsuen, Pat Heung, Yuen Long
  • ¡@
Road P1 Advance Works at Yam O on Lantau Island
  • ¡@
Route16 Investigation Assignment from West Kowloon to Sha Tin - Alternative Alignment Environmental Impact Assessment
  • ¡@
Route 9 between Tsing Yi and Cheung Sha Wan
  • ¡@
Sha Tin New Town - Stage II Trunk Road T3 (Tai Wai)
  • ¡@
South-East New Territories Landfill Extension
  • ¡@
Tai Po Sewage Treatment Works Stage V
  • ¡@
Tai Po Tai Wo Road Sewage Pumping Station
  • ¡@
TETRA Radio Base Station at Yuen Ng Fan, Sai Kung
  • ¡@
Tseung Kwan O Area 86 Property Development - Rainwater and Grey Water Recycling
  • ¡@
Tsing Lung Tau Pumping Station
  • ¡@
Upgrading of Ting Kok Road Pumping Station No.5
  • ¡@
Upgrading of Quarantine Stables for the 2008 Olympic Equestrian Event
  • ¡@
Widening of Yuen Long Highways between Lam Tei and Shap Pat Heung Interchange
  • ¡@
VSNL Intra Asia Submarine Cable System - Deep Water Bay
  • ¡@
Yau Tong Bay Development - Reclamation of Yau Tong Bay
  • ¡@
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13
  • ¡@
Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Improvement, Stage 1, Phase 2B - Kam Tin Secondary Drainage Channels KT14 & KT15
  • ¡@
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 1 Package 1A-1T and 1B-1T
  • ¡@
10-Year Extended LPM Project, Phase 2, Package G - Outlying Islands Features in Sok Kwu Wan Lamma Island
  • ¡@
1,800MW Gas-fired Power Station at Lamma Extension


¡@