EIA PROCESS CONTENT ENQUIRY SITEMAP SEARCH
­»´äÀô¹Ò«OÅ@¸p Hong Kong Environmental Protection Department Hong Kong Special Administrative Region Government
Environmental Impact Assessment Ordinance Legislative Framework Guidance Notes Forms Advertisement Notices The Register
Guidance Notes
Bullet EIA Ordinance
Bullet Environmental Impact Assessment (Appeal Board) Regulation
Bullet Advertising Requirements and Public Inspection of Documents
Bullet Modus Operandi of the Environmental Impact Assessment Subcommittee of the Advisory Council on the Environment
Bullet For Applications under the Ordinance
Bullet Assessment of Impact on Sites of Cultural Heritage
Bullet Basic Principles of Environmental Impact Assessment Process
Bullet The Role and Operation of Environmental Study Management Group
Bullet Flexibility and Enforceability of Mitigation Measures proposed in an EIA Report
Bullet The Role of Independent Environmental Checker
Bullet Implementation Schedule for Environmental Impact Assessment Process
Bullet Some Observations on Ecological Assessment From the EIAO Perspective
Bullet Ecological Baseline Survey for Ecological Assessment
Bullet Preparation of Landscape And Visual Impact Assessment Under the EIAO

A Guide to the EIA Ordinance

CATEGORY DESIGNATED PROJECTS
D. - ENERGY SUPPLY D.1 Public utility electricity power plant.

D.2 Public utility gas generation plant.

E. - WATER EXTRACTION AND WATER SUPPLY E.1 A primary reservoir.

E.2 Water treatment works with a capacity of more than 100 000 m3 per day.

E.3 A submarine water supply pipeline with a diameter of 1 200 mm or more and a length of more than 1 km.

F. - SEWAGE COLLECTION, TREATMENT, DISPOSAL AND REUSE F.1 Sewage treatment works with an installed capacity of more than 15 000 m3 per day.

F.2 Sewage treatment works---

  1. with an installed capacity of more than 5 000 m3 per day; and
  2. a boundary of which is less than 200 m from the nearest boundary of an existing or planned---
    1. residential area;
    2. place of worship;
    3. educational institution;
    4. health care institution;
    5. site of special scientific interest;
    6. site of cultural heritage;
    7. bathing beach;
    8. marine park or marine reserve;
    9. fish culture zone; or
    10. seawater intake point.
F.3 A sewage pumping station---
  1. with an installed capacity of more than 300 000 m3 per day; or

  2. with an installed capacity of more than 2 000 m3 per day and a boundary of which is less than 150 m from an existing or planned---
    1. residential area;
    2. place of worship;
    3. educational institution;
    4. health care institution;
    5. site of special scientific interest;
    6. site of cultural heritage;
    7. bathing beach;
    8. marine park or marine reserve;
    9. fish culture zone; or
    10. seawater intake point.
F.4 An activity for the reuse of treated sewage effluent from a treatment plant.

F.5 A submarine sewage pipeline with a diameter of 1 200 mm or more and a length of 1 km or more.

F.6 A submarine sewage outfall.

G. - WASTE STORAGE, TRANSFER AND DISPOSAL FACILITIES G.1 A landfill for waste as defined in the Waste Disposal Ordinance (Cap. 354).

G.2 A refuse transfer station.

G.3 An incinerator with an installed capacity of more than 50 tonnes per day.

G.4 A waste disposal facility (excluding any refuse collection point), or waste disposal activity, for---

  1. refuse; or
  2. chemical, industrial or special wastes
G.5 A facility for the treatment of construction waste---
  1. with a designed capacity of not less than 500 tonnes per day; and
  2. a boundary of which is less than 200 m from an existing or planned---
    1. residential area;
    2. place of worship;
    3. educational institution; or
    4. health care institution.
G.6 A waste disposal facility for pulverized fuel ash, furnace bottom ash or gypsum.
H. - UTILITY PIPELINES, TRANSMISSION PIPELINES AND SUBSTATIONS H.1 A 400 kV electricity substation and transmission line.

H.2 A submarine gas pipeline or submarine oil pipeline.

I. - WATERWAYS AND DRAINAGE WORKS I.1 A drainage channel or river training and diversion works---
  1. with a channel width of more than 100 m; or
  2. which discharges or discharge into an area which is less than 300 m from the nearest boundary of an existing or planned---
    1. site of special scientific interest;
    2. site of cultural heritage;
    3. marine park or marine reserve;
    4. fish culture zone;
    5. wild animal protection area;
    6. coastal protection area; or
    7. conservation area.
I.2 A flood storage pond more than 10 ha in size.
J. - MINERAL EXTRACTION J.1 An oil or gas extraction activity.

J.2 A mining operation.

J.3 A quarrying or quarry rehabilitation.

J.4 A coal industry works with a handling capacity of more than 100 tonnes per day.

K. - INDUSTRIAL ACTIVITIES K.1 An industrial estate.

K.2 A brewery works with an annual production capacity of more than 0.4 million hecto litres.

K.3 A tannery or leather finishing factory with an annual production capacity of more than 500,000 m2.

K.4 A metallurgical works with a processing capacity of more than 200,000 tonnes per annum (expressed as metal).

K.5 A cement works or concrete batching plant with a total silo capacity of more than 10 000 tonnes in which cement is handled and manufactured.

K.6 A chemical or biochemical plant with a storage capacity of more than 500 tonnes and in which substances are processed or produced.

K.7 An oil refinery.

K.8 A petro-chemical plant with an annual production capacity of more than 70 000 tonnes.

K.9 A tobacco or cigarette manufacturing plant in a stand-alone, purpose built building.

K.10 An explosives depot or explosives manufacturing plant in a stand-alone, purpose built building.

K.11 A sand depot with a site area of more than 1 ha in size.

K.12 A bulk chemical storage facility with a storage capacity of more than 80 000 tonnes.

K.13 A dangerous goods godown with a storage capacity exceeding 500 tonnes.

Back Next