TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.       INTRODUCTION

Background

Scope of Report

Summary of Construction Works

2.       AIR QUALITY

Monitoring Requirements

Monitoring Equipment

Monitoring Parameter, Frequency and Schedule

Monitoring Locations

Monitoring Methodology

Calibration Details

Results and Observations

3.       ENVIRONMENTAL SITE INSPECTION

Site Inspections

Review of Environmental Monitoring Procedures

Assessment of Environmental Monitoring Results

Advice on the Solid and Liquid Waste Management Status

Environmental Licences and Permits

Implementation Status of Environmental Mitigation Measures

Summary of Exceedances of the Environmental Quality Performance Limit

Summary of Complaints, Notifications of Summons and Successful Prosecutions

4.       FUTURE KEY ISSUES

Construction Programme for the Coming Months

Key Issues for Coming Month

Monitoring Schedule for the Coming Months

5.       CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 


List of Tables

 

Table 1.1         Contact Information of Key Personnel

Table 2.1         Air Quality Monitoring Equipment

Table 2.2         Frequency of Air Quality Monitoring

Table 2.3         Air Quality Monitoring Stations

Table 2.4         Summary of 1-hr TSP Monitoring Results

Table 2.5         Summary of 24-hr TSP Monitoring Results

Table 3.1         Actual Amounts of Waste Generated in July 2006

Table 3.2         Summary of Environmental Licensing and Permit Status

Table 3.3         Summary of Environmental Complaints and Prosecutions

 

List of Figures

 

Figure 1.1         General Site Layout for TKO Area 137

Figure 2.1         Air Quality Environmental Monitoring Stations for TKO Area 137

 

Appendices

 

Appendix A       Project Organization Chart

Appendix B       Construction Programme

Appendix C       Action and Limit Levels for Air Quality

Appendix D       Monitoring Schedule for July 2006

Appendix E       Calibration Certificates

Appendix F       Air Quality Monitoring Results and Graphical Presentation

Appendix G       Wind Data

Appendix H       ET’s Site Inspection Summary

Appendix I         Implementation Schedule of Mitigation Measures (EMIS)

Appendix J        Event Action Plan

Appendix L        Tentative Schedule for August 2006