2.1
The EM&A Manual designated a monitoring station to
monitor environmental impacts on air quality due to the Project. The monitoring
location is depicted in Figure 2.1.
2.2
The EM&A Manual also required environmental site
inspections for air quality, noise, water quality, chemical and waste
management and landscape and visual.
Environmental Quality Perfomance Limits (Action/Limit Levels)
2.3
The environmental quality performance limits (i.e.
Action/Limit Levels) were derived from the baseline monitoring results of the
Fill Bank at Tseung Kwan O Area 137, and are given in
Appendix C.
Environmental Mitigation Measures
2.4
Relevant environmental mitigation measures were stipulated
in the Particular Specification and EP (No.: EP-134/2002/F) for the Contractor
to adopt. A list of mitigation measures and their implementation statuses are
given in Appendix D.