Site Inspection Summary
Date: |
5 October 2007 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
190 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
Stagnant water was pumped out from the trapezoidal channel in Area A.
(Closed) |
|
|
2. |
General refuse was cleared inside the desilting pit, u-channel and
trapezoidal channel in Area A. (Closed) |
|
|
3. |
General refuse was
cleared inside the u-channel in Area B2. (Closed) |
|
|
4. |
The oil stain on ground
in Area B1 was cleared. (Closed) |
|
|
5. |
The removal of
deposited mud inside the trapezoidal channel under the access bridge next the
CEDD’s site office in Area A was in progress. The Contractor was reminded to
clear the remaining mud inside the trapezoidal channel under the access
bridge. |
|
|
6. |
Fugitive dust was
generated during dumping and manual sorting of non-inert waste and during
vehicle movement along the haul road in Area A. The Contractor was reminded
to increase water spraying frequency by water truck or provide more water
sprinklers for dust suppression. |
|
|
|
New Observations |
|
|
7. |
Dark smoke was observed emitted from an excavator (C10) in Area A. The
Contractor was reminded to properly maintain the plant on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
11 October 2007 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
192 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
No dark smoke was emitted from the excavator (C10) in Area A. (Closed) |
|
|
2. |
Fugitive dust was generated during dumping and manual sorting of
non-inert waste and during vehicle movement along the haul road in Area A.
The Contractor was reminded to increase water spraying frequency by water
truck or provide more water sprinklers for dust suppression. |
|
|
3. |
The removal of
deposited mud inside the trapezoidal channel under the access bridge next the
CEDD’s site office in Area A was in progress. The Contractor was reminded to
clear the remaining mud inside the trapezoidal channel under the access
bridge. |
|
|
|
New Observations |
|
|
4. |
General refuse was found inside the u-channel in Area A. The
Contractor was advised to clear the refuse. |
|
|
5. |
Silt and mud was deposited on the access bridge and road next the
CEDD’s site office in Area A. The Contractor was advised to clear the
deposited silt and mud. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
|
Site Inspection Summary
Date: |
18 October 2007 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
194 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
Deposited mud and silt was cleared on the access bridge and road next
the CEDD’s site office in Area A. (Closed) |
|
|
2. |
The removal of deposited mud inside the trapezoidal channel under the
access bridge next the CEDD’s site office in Area A was in progress. The
Contractor was reminded to clear the remaining mud inside the trapezoidal
channel under the access bridge. |
|
|
3. |
General refuse was
still found inside the u-channel and desilting pit in Area A. The Contractor
was advised to clear the refuse. |
|
|
4. |
Minor fugitive dust was
observed during dumping of non-inert waste. The Contractor was advised to
improve the water spraying at the non-inert stockpile and to provide longer
water spraying time to the load of the trucks at the weigh-bridge in Area B1. |
|
|
|
New Observation |
|
|
5. |
General refuse was found in Area B1. The Contractor was advised to
clear the refuse. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
25 October 2007 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
196 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
General refuse was cleared in Area B1. (Closed) |
|
|
2. |
General refuse was cleared inside the u-channel and desilting pit in
Area. A. (Closed) |
|
|
3. |
Deposited mud was
cleared inside the trapezoidal channel under the access bridge next the
CEDD’s site office in Area A. (Closed) |
|
|
4. |
Minor fugitive dust was
observed during dumping of non-inert waste. The Contractor was advised to
improve the water spraying at the non-inert stockpile and to provide longer
water spraying time to the load of the trucks at the weigh-bridge in Area B1. |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |