Environmental Mitigation Implementation Schedule
Environmental Protection
Measures |
Location |
Implementation Status |
|||
Jul 07 |
Aug 07 |
Sep 07 |
Oct 07 |
||
Air Quality |
|||||
Sufficient watering |
Tipping hall (barging point), stockpiled materials,
access road, All unpaved haul roads, exposed site areas |
@ |
@ |
@ |
@ |
Truck speed below |
All areas |
Ö |
Ö |
Ö |
Ö |
Trucks fitted with power-operated dump bed cover |
All areas |
Ö |
Ö |
Ö |
Ö |
Watering for truck loads after removal of tarpaulin
cover |
Site egress |
Ö |
Ö |
Ö |
Ö |
Provision of vehicle washing facilities |
Site egress |
Ö |
Ö |
Ö |
Ö |
Prohibition of open burning |
All areas |
Ö |
Ö |
Ö |
Ö |
Provision of top and side covers for conveyor belts |
C&DMSF |
Ö |
Ö |
Ö |
Ö |
Buffer
zone of at least |
Seafront |
Ö |
Ö |
Ö |
Ö |
Buffer
zone of at least |
Northern
site boundary |
Ö |
Ö |
Ö |
Ö |
Noise |
|||||
Noisy equipment and activities should be sited by
the Contractor as far away from sensitive receivers as is practical |
All areas |
Ö |
Ö |
Ö |
Ö |
Replace noisy plant with quieter alternatives |
All areas |
Ö |
Ö |
Ö |
Ö |
Idle equipment should be turned off or throttled
down |
All areas |
Ö |
Ö |
Ö |
Ö |
Quieter power units of stationary and earth moving
plant with partial or full enclosures or vibratory isolation |
All areas |
Ö |
Ö |
Ö |
Ö |
Properly maintain powered mechanical equipment |
All areas |
Ö |
Ö |
Ö |
Ö |
Schedule noisy activities to reduce duration and
severity of noise |
All areas |
Ö |
Ö |
Ö |
Ö |
Include contract clauses for environmental
protection |
All areas |
Ö |
Ö |
Ö |
Ö |
Water Quality |
|||||
Obtain discharge license |
Site offices |
Ö |
Ö |
Ö |
Ö |
Provide proper sewage treatment and disposal
facilities in the form of chemical toilets for site workers |
All areas |
Ö |
Ö |
Ö |
Ö |
Include contract specifications for environmental
protection |
All areas |
Ö |
Ö |
Ö |
Ö |
Provide proper drainage for collection of surface
runoff |
All areas |
Ö |
@ |
@ |
Ö |
Provision of buffer distance of at least |
C&DMSF |
Ö |
Ö |
Ö |
Ö |
Provision of sand & silt settling tank |
Vehicle washing facility |
Ö |
@ |
@ |
@ |
Sand and silt removal facility provided for
stormwater to be treated before discharge |
All areas |
Ö |
@ |
Ö |
Ö |
Construction of temporary storm water system |
Perimeter of Fill Bank |
Ö |
Ö |
Ö |
Ö |
Regular removal of sand and silt |
All channels |
@ |
@ |
@ |
@ |
Construction Waste |
|||||
Segregate different categories of waste |
All areas |
Ö |
Ö |
Ö |
Ö |
Register chemical and maintenance wastes |
All areas |
Ö |
Ö |
Ö |
Ö |
Do not connect chemical material storage areas to
the foul or stormwater drainage system |
Works yards |
Ö |
Ö |
Ö |
Ö |
Store and label dangerous goods |
All areas |
Ö |
Ö |
Ö |
Ö |
Prevent disposal of hazardous materials to air,
soil, water bodies |
All areas |
Ö |
@ |
@ |
Ö |
Provide refuse containers at all work areas |
All areas |
Ö |
Ö |
Ö |
Ö |
Human waste discharged into septic tanks or tankered
away |
All areas |
Ö |
Ö |
Ö |
Ö |
Landscape and Visual |
|||||
Is the night-time lighting controlled to minimize
glare to sensitive receivers |
All areas |
Ö |
Ö |
Ö |
Ö |
Is hydroseeding process conducted and maintained
properly |
All areas |
N/A |
N/A |
N/A |
N/A |