Site Inspection Summary
Date: |
3 January 2008 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
215 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
The removal of deposited silt and mud was in progress on the access
bridge next to the CEDD’s site office in Area A. The Contractor was still
reminded to clear the deposited silt and mud. |
|
|
2. |
General refuse near the weight-bridge in
Area A was cleared. (Closed) |
|
|
|
New Observation |
|
|
3. |
General refuse was found inside the u-channel in Area B2. The
Contractor was reminded to clear the refuse. |
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
9 January 2008 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
217 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
Deposited mud on the access bridge next to the CEDD’s site office in
Area A had been cleared. (Closed) |
|
|
2. |
General refuse inside the u-channel in Area B2 had been cleared. (Closed) |
|
|
|
New Observations |
|
|
3. |
Minor fugitive dust was observed along the haul road next to CEDD’s
site office at Area A, since the sprinkler for dampening the haul road was
found malfunction. The Contractor was reminded to repair / replace the
sprinkler and to maintain the haul road sufficiently dampened. |
|
|
4. |
Small amount of refuse was found inside the
u-channel in Area A. The Contractor was reminded to properly maintain the
drainage system. |
|
|
Nil |
|
Site Inspection Summary
Date: |
17 January 2008 |
Time: |
|
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
220 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
No fugitive dust was observed along the haul road next to CEDD’s site
office at Area A during the site inspection. The sprinkler was repaired and the haul road was sufficiently dampened (Closed) |
|
|
2. |
The refuse inside the u-channel in Area A was cleared. (Closed) |
|
|
|
New Observation |
|
|
3. |
Nil |
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
24 January 2008 |
Time: |
10:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
222 |
|
Nil |
|
|
|
Follow-up Observation |
|
|
|
Nil |
|
|
|
New Observations |
|
|
1. |
Deposited silt and mud was found inside the trapezoidal channel in
Area A. The Contractor was reminded to clear the silt and mud and properly
maintain the drainage system. |
|
|
2. |
The Contractor was reminded to clear the oily water inside the drip
tray in the Chemical Waste Store. |
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
30 January 2008 |
Time: |
10:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
224 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
The oily water inside the drip tray in the Chemical Waste Store was
cleared. (Closed) |
|
|
2. |
Deposited silt and mud was found inside the trapezoidal channel in
Area A. The Contractor was still reminded to clear the silt and mud and
properly maintain the drainage system. |
|
|
|
New Observations |
|
|
3. |
General refuse was found inside the soak-away pit in Area B2. The
Contractor was reminded to clear the refuse to avoid accumulation. |
|
|
4. |
Muddy condition was observed along the access
road in Area A and part of Area B2. The Contractor was reminded to clear the
mud trails as soon as possible. |
|
|
5. |
Oil stains were found
on the VGF tipping hall. The Contractor was reminded to clear the oil stains.
|
|
|
Nil |
|