Site Inspection Summary

 

Inspection Information

Date:

3 January 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

215

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

The removal of deposited silt and mud was in progress on the access bridge next to the CEDD’s site office in Area A. The Contractor was still reminded to clear the deposited silt and mud.

 

 

2.

General refuse near the weight-bridge in Area A was cleared. (Closed)

 

 

 

New Observation

 

 

3.

General refuse was found inside the u-channel in Area B2. The Contractor was reminded to clear the refuse. 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

9 January 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

217

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

Deposited mud on the access bridge next to the CEDD’s site office in Area A had been cleared. (Closed)

 

 

2.

General refuse inside the u-channel in Area B2 had been cleared. (Closed)

 

 

 

New Observations

 

 

3.

Minor fugitive dust was observed along the haul road next to CEDD’s site office at Area A, since the sprinkler for dampening the haul road was found malfunction. The Contractor was reminded to repair / replace the sprinkler and to maintain the haul road sufficiently dampened.

 

 

4.

Small amount of refuse was found inside the u-channel in Area A. The Contractor was reminded to properly maintain the drainage system.

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

17 January 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

220

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

No fugitive dust was observed along the haul road next to CEDD’s site office at Area A during the site inspection. The sprinkler was repaired and the haul road was sufficiently dampened (Closed)

 

 

2.

The refuse inside the u-channel in Area A was cleared. (Closed)

 

 

 

New Observation

 

 

3.

Nil

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

24 January 2008

Time:

10:30

Site:

Tseung Kwan O Area 137

Inspection No.:

222

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observation

 

 

 

Nil

 

 

 

New Observations

 

 

1.

Deposited silt and mud was found inside the trapezoidal channel in Area A. The Contractor was reminded to clear the silt and mud and properly maintain the drainage system.

 

 

2.

The Contractor was reminded to clear the oily water inside the drip tray in the Chemical Waste Store.

 

 

 

 

 

 

 

Remarks

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Date:

30 January 2008

Time:

10:30

Site:

Tseung Kwan O Area 137

Inspection No.:

224

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

The oily water inside the drip tray in the Chemical Waste Store was cleared. (Closed)

 

 

2.

Deposited silt and mud was found inside the trapezoidal channel in Area A. The Contractor was still reminded to clear the silt and mud and properly maintain the drainage system.

 

 

 

New Observations

 

 

3.

General refuse was found inside the soak-away pit in Area B2. The Contractor was reminded to clear the refuse to avoid accumulation.

 

 

4.

Muddy condition was observed along the access road in Area A and part of Area B2. The Contractor was reminded to clear the mud trails as soon as possible.

 

 

5.

Oil stains were found on the VGF tipping hall. The Contractor was reminded to clear the oil stains.

 

 

 

Remarks