Environmental Permit No. EP-004/1998/F
環境許可證編號:EP-004/1998/F
ENVIRONMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTION 10 & 13
環境影響評估條例
(第
499章
)
第
10 及
13 條
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A
DESIGNATED PROJECT
建造及營辦指定工程項目的環境許可證
PART
A (MAIN PERMIT)
A部
(許可證主要部分)
Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the Ordinance), the Director of Environmental Protection (the Director) granted the Environmental Permit (No. EP-004/1998) to KOWLOON-CANTON RAILWAY CORPORATION (the "Permit Holder") on 16 September 1998. Pursuant to Section 13 of the Ordinance, the Director amends the Environmental Permit No. EP-004/1998/E based on the Application No. VEP-084/2003. The amendments described below, are incorporated into this Environmental Permit (EP-004/1998/F). This Environmental Permit as amended is for the construction and operation of the designated projects described in Part B of this Permit subject to the conditions described in and attached to Part C of this Permit. .
根據環境影響評估條例 (條例) 第 10條的規定,環境保護署署長 (署長) 於 1998年 9月 16日將環境許可證 (編號 EP-004/1998) 批予九廣鐵路公司 (下稱 "許可證持有人 ")。根據條例第 13條的規定,署長因應更改環境許可證的申請編號 VEP-084/2003 修訂環境許可證編號 EP-004/1998/E。以下修訂已包含在本環境許可證內 (EP-004/1998/F)。本經修訂的環境許可證作為建造及營辦本許可證 B 部所說明的指定工程項目,但須遵守本許可證 C 部所說明及附載的條件。
This Environmental Permit is based on the documents, approval and permissions described below:
本環境許可證乃依據下列的文件、批准及許可條件而簽發 :
|
Application
No. |
VEP-084/2003 |
|
Document
in the Register : |
(a) West Rail - Final Assessment Report West Kowloon to Tuen Mun Centre - Environmental Impact Assessment, its Technical Annexes, and Final Landscape Design Strategy, Report Vol.1 (Register No. EIA-149/1998) [Hereafter referred to as the EIA report] (b) Application documents submitted by Permit Holder including all attachments on 19 August 1998 (Application No. AEP-004/1998) (c) Environmental Permit issued on 16 September 1998 (Permit No. EP-004/1998) (d) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 21 July 2000. (Application No. VEP-020/2000) (e) Environmental Permit issued on 18 August 2000 (Permit No. VEP-020/2000/A/EP-004) (f) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 29 May 2001. (Application No. VEP-045/2001) (g) Environmental Permit issued on 27 June 2001 (Permit No. EP-004/1998/B) (h) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 11 March 2002. (Application No. VEP-062/2002) (i) Environmental Permit issued on 9 April 2002 (Permit No. EP-004/1998/C) (j) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 10 June 2002. (Application No. VEP-067/2002) (k) Environmental Permit issued on 8 July 2002 (Permit No. EP-004/1998/D) (l) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 27 September 2002. (Application No. VEP-078/2002) (m) Environmental Permit issued on 24 October 2002 (Permit No. EP-004/1998/E). (n) Application documents for Variation of an Environmental Permit including all attachments by Permit Holder submitted on 24 January 2003 (Application No. VEP-084/2003). (a) 西部鐵路 -最終評估報告西九龍至屯門中 - 環境影響評估、其技術附件及最終景觀美化設計策略報告第一冊 (登記冊檔號 :EIA-149/1998) [下稱 "環評報告 "] (b) 許可證持有人於 1998 年 8 月 19 日提交之申請文件包括所有附件 (申請書編號 AEP-004/1998) (c) 於 1998 年 9 月 16日發出的環境許可證 (許可證編號 EP-004/1998) (d) 許可證持有人於 2000年 7月 21日提交申請文件包括所有附件 (申請書編號 VEP-020/2000) (e) 於 2000年 8月 18日發出的環境許可證 (許可證編號 VEP-020/2000/A/EP-004 ) (f) 許可證持有人於 2001年 5月 29日提交之申請文件包括所有附件 (申請書編號 VEP-045/2001) (g) 於 2001年 6月 27日發出的環境許可證 (許可證編號 EP-004/1998/B ) (h) 許可證持有人於 2002年 3月 11日提交之申請文件包括所有附件 (申請書編號 VEP-062/2002) (i) 於 2002年 4月 9日發出的環境許可證 (許可證編號 EP-004/1998/C ) (j) 許可證持有人於 2002年 6月 10日提交之申請文件包括所有附件 (申請書編號 VEP-067/2002) (k) 於 2002年 7月 8日發出的環境許可證 (許可證編號 EP-004/1998/D ) (l) 許可證持有人於 2002年 9月 27日提交之申請文件包括所有附件 (申請書編號 VEP-078/2002) (m) 於 2002年10月24日發出的環境許可證 (許可證編號 EP-004/1998/E ) (n) 許可證持有人於 2003年1月 24日提交之申請文件包括所有附件 (申請書編號 VEP-084/2003) |
Application No. 申請 編號 |
Date of Application 申請 日期 |
List of Amendments Incorporated into Environmental Permit 已包含在環境許可證內的修訂項目 |
Date of Amendments 修訂 日期 |
|
VEP- 020/2000 |
21 July 2000 |
Add conditions 2.20, 3.14, Notes 6a, 6b and 6c to Part C of Environmental Permit No. EP-004/1998 Add reference information to conditions 5.2, 5.6 and 5.10 in Part C of Environmental Permit No. EP-004/1998 Delete Figure 1 and Figure 2 in condition 3.8, and subsequent variation of condition 3.14 in Part C of Environmental Permit No. EP-004/1998 Add the register reference no. of the EIA Report to conditions 1.7, 2.4, 2.5, 2.6, 2.7, 2.9, 2.12, 2.13, 2.14, 2.16, 2.17, 2.18, 2.19, 3.1, 3.3, 3.4, 3.5, 3.6, 5.5, 5.7, 5.8, 5.10 and 6.3 of Part C of Environmental Permit No. EP-004/1998
|
18 August 2000 |
|
|
2000年 7月 21日 |
在環境許可證編號 EP-004/1998的 C 部內加入第 2.20, 3.14, ,註 6a, 6b及 6c 項條件 在環境許可證編號 EP-004/1998的 C部內第 5.2, 5.6及 5.10加入參考資料 在環境許可證編號 EP-004/1998的 C 部內刪除第 3.8項條件之圖 1及圖 2 ,及跟隨修改第 3.14 項條件 在環境許可證編號 EP-004/1998 C 部內的第 1.7, 2.4, 2.5, 2.6, 2.7, 2.9, 2.12, 2.13, 2.14, 2.16, 2.17, 2.18, 2.19, 3.1, 3.3, 3.4, 3.5, 3.6, 5.5, 5.7, 5.8, 5.10 及 6.3項條件加上登記冊檔案編號
|
2000年 8月 18日 |
|
VEP- 045/2001 |
29 May 2001 |
Vary conditions 2.20 and 3.14 in Part C of Environmental Permit No. VEP-020/2000/A/EP-004 Add Notes 6a, 6b and 6c to Part C of Environmental Permit No. VEP-020/2000/A/EP-004 Add reference information to conditions 5.2, 5.6 and 5.10 in Part C of Environmental Permit No. VEP-020/2000/A/EP-004 Vary condition 5.3 with respect to the change from 12-car train to 9-car train in Part C of Environmental Permit No. VEP-020/2000/A/EP-004 Vary condition 6.1 with respect to the change in maximum speed at the section between Tin Shui Wai and Siu Hong in Part C of Environmental Permit No. VEP-020/2000/A/EP-004
|
27 June 2001 |
|
|
2001年 5月 29日 |
在環境許可證編號 VEP-020/2000/A/EP-004的 C 部內更改第 2.20 及 3.14 項條件 在環境許可證編號 VEP-020/2000/A/004的 C 部加上註 6a, 6b, 6c 在環境許可證編號 VEP-020/2000A/EP-004的 C部內第 5.2, 5.6及 5.10項條件加入參考資料 在環境許可證編號 VEP-020/2000/A/EP-004的 C部內 , 就 12卡碟形制動電氣化列車至 9卡碟形制動電氣化列車之改動 , 修改第 5.3項條件 在環境許可證編號 VEP-020/2000/A/EP-004的 C部內 , 就天水圍至兆康一段之最高時速之改動 , 修改第 6.1項條件
|
2001年 6月 27日 |
|
VEP- 062/2002 |
11 March 2002 |
Vary conditions 2.20 and 3.14 in Part C of Environmental Permit No. EP-004/1998/B
Add Note 6a to Part C of Environmental Permit No. EP-004/1998/B
Add reference information to conditions 5.2 and 5.10 in Part C of Environmental Permit No. EP-004/1998/B
Add Figure 1, Figure 2 and Figure 3 to the Environmental Permit No. EP-004/1998/B and subsequent variation of the figure number in Figure 1 and condition 3.12 of the Environmental Permit No. EP-004/1998/B.
|
9 April 2002 |
|
|
2002年 3月 11日 |
在環境許可證編號 EP-004/1998/B的 C 部內更改第 2.20 及 3.14 項條件
在環境許可證編號 EP-004/1998/B的 C 部加上註 6a
在環境許可證編號 EP-004/1998/B 的 C部內第 5.2及 5.10項條件加入參考資料
在環境許可證編號 EP-004/1998/B加上圖 1, 圖 2及圖 3,及跟隨修改環境許可證編號 EP-004/1998/B圖 1及第 3.12項條件的附圖編號
|
2002年 4月 9日 |
VEP-067/2002 |
10 June 2002 |
Vary conditions 2.20 and 3.14 in Part C of Environmental Permit No. EP-004/1998/C
Add Note 6a to Part C of Environmental Permit No. EP-004/1998/C
Add reference information to conditions 5.2, 5.7 and 5.10 in Part C of Environmental Permit No. EP-004/1998/C
|
8 July 2002 |
|
|
2002年 6月 10日 |
在環境許可證編號 EP-004/1998/C的 C 部內更改第 2.20 及 3.14 項條件
在環境許可證編號 EP-004/1998/C的 C 部加上註 6a
在環境許可證編號 EP-004/1998/C的 C部內第 5.2 , 5.7 及 5.10項條件加入參考資料
|
2002年 7月8 日 |
VEP-078/2002 |
27 September 2002 |
Vary conditions 2.20 and 3.14 in Part C of Environmental Permit No. EP-004/1998/D
Add Note 6a to Part C of Environmental Permit No. EP-004/1998/D
Add reference information to conditions 5.2, 5.7 and 5.10 in Part C of Environmental Permit No. EP-004/1998/D
|
24 October 2002 |
|
|
2002年 9月 27日 |
在環境許可證編號 EP-004/1998/D的 C 部內更改第 2.20 及 3.14 項條件
在環境許可證編號 EP-004/1998/D的 C 部加上註 6a
在環境許可證編號 EP-004/1998/D的 C 部內第 5.2 , 5.7 及 5.10項條件加入參考資料
|
2002年 10月 24日 |
VEP-084/2003 |
24 January 2003 |
Vary clause (i) of Annex A of the Environmental Permit No. EP-004/1998/E.
Vary clause (c) of Annex E of the Environmental Permit No. EP-004/1998/E.
Delete clauses (a), (b), (g) and (h) of Annex E of the Environmental Permit No. EP-004/1998/E.
Vary conditions 2.20 and 3.14 in Part C of Environmental Permit No. EP-004/1998/E.
Vary Note 6a to Part C of Environmental Permit No. EP-004/1998/E.
Vary reference information to conditions 5.2 and 5.10 in Part C of Environmental Permit No. EP-004/1998/E.
|
20 February 2003 |
|
|
2003年 1月 24日 |
在環境許可證編號 EP-004/1998/E 的附件 A 更改第(i) 項條件
在環境許可證編號 EP-004/1998/E 的附件 E 更改第(c) 項條件
在環境許可證編號 EP-004/1998/E 的附件 E 刪除第(a), (b), (g) 及 (h) 項條件.
在環境許可證編號 EP-004/1998/E的 C 部內更改第 2.20 及 3.14 項條件.
在環境許可證編號 EP-004/1998/E的 C 部更改註 6a
在環境許可證編號 EP-004/1998/E的 C 部內第 5.2及 5.10項條件更改參考資料
|
2003年 2月20 日 |
|
|