Central Reclamation, Phase III

Studies, Site Investigation, Design and Construction

 

Environmental Impact Assessment Report

Volume 2 - Appendices

(July 2001)

APPENDICES

Appendix A    Project History

Appendix B    Review of Reclamation Methodology for CRIII Minimum Option

Figure b.1       Location of Site Investigation Stations b1.gif

Figure b.2       Seabed Level Contour Plan b2.gif

Figure b.3       Base of Marine Depostis Contour Plan b3.gif

Figure b.4       Base of Alluvium Contour Plan b4.gif

Figure b.5       Typical Geological Sections Through Reclamation Area b5a.gif b5b.gif

Figure b.6       Extent of Seawalls (Permanent and Temporary) b6.gif

Figure b.7       Typical Cross Sections Through Reclamation Areas b7.gif

Figure b.8       Horizontal Alignment of Central – Wan Chai Bypass Tunnel b8.gif

Figure b.9       Vertical Alignment for Central – Wan Chai Bypass Tunnel b9.gif

Figure b.10     Horizontal Alignment of Hong Kong Station Extended Overrun Tunnel b10.gif

Figure b.11     Typical Section of Existing Seawall and Proposed Hong Kong Station Extended Overrun Tunnel b11.gif

Figure b.12     Vertical Alignment for Hong Kong Station Extend Overrun Tunnel b12.gif

Figure b.13     Routing of Culvert Extensions b13.gif

Figure b.14     Recommended Reclamation Methods for Infrastructure Works b14.gif

Figure b.15     Section Through Reclamation in Area to North and East of Existing "Star" Ferry Piers b15.gif

Figure b.16     Graph to show Primary and Secondary Settlement for Marine Deposits b16.gif

Figure b.17     Envisaged Construction Programme for Final Reclamation Area West Works b17.gif

Figure b.18     Extent of Dredging and Sample Locations b18.gif

Appendix C    Detailed Construction Programme

Page c01        Detailed Construction Programme Sheet 1 of 6 c01.gif

Page c02        Detailed Construction Programme Sheet 2 of 6 c02.gif

Page c03        Detailed Construction Programme Sheet 3 of 6 c03.gif

Page c04        Detailed Construction Programme Sheet 4 og 6c04.gif

Page c05        Detailed Construction Programme Sheet 5 of 6 c05.gif

Page c06        Detailed Construction Programme Sheet 6 of 6 c06.gif

Appendix D   Sample Output File for Road Traffic Noise Assessment / Confirmation Letter from Transport Department on CRIII Road Speeds

Page d01        Page 1 of 7 d01.gif

Page d02        Page 2 of 7 d02.gif

Page d03        Page 3 of 7 d03.gif

Page d04        Page 4 of 7 d04.gif

Page d05        Page 5 of 7 d05.gif

Page d06        Page 6 of 7 d06.gif

Page d07        Page 7 of 7 d07.gif

Appendix E    Powered Mechanical Equipment (PME) for Different Construction Tasks during Normal Daytime Working Hours

Page e1.01     Unmitigated Scenario – Construction Activities Page 1 of 10 e101.gif

Page e1.02     Unmitigated Scenario – Construction Activities Page 2 of 10 e102.gif

Page e1.03     Unmitigated Scenario – Construction Activities Page 3 of 10 e103.gif

Page e1.04     Unmitigated Scenario – Construction Activities Page 4 of 10 e104.gif

Page e1.05     Unmitigated Scenario – Construction Activities Page 5 of 10 e105.gif

Page e1.06     Unmitigated Scenario – Construction Activities Page 6 of 10 e106.gif

Page e1.07     Unmitigated Scenario – Construction Activities Page 7 of 10 e107.gif

Page e1.08     Unmitigated Scenario – Construction Activities Page 8 of 10 e108.gif

Page e1.09     Unmitigated Scenario – Construction Activities Page 9 of 10 e109.gif

Page e1.10     Unmitigated Scenario – Construction Activities Page 10 of 10 e110.gif

Page e2.01     Unmitigated Scenario – Construction Activities Page 1 of 11 e201.gif

Page e2.02     Unmitigated Scenario – Construction Activities Page 2 of 11 e202.gif

Page e2.03     Unmitigated Scenario – Construction Activities Page 3 of 11 e203.gif

Page e2.04     Unmitigated Scenario – Construction Activities Page 4 of 11 e204.gif

Page e2.05     Unmitigated Scenario – Construction Activities Page 5 of 11 e205.gif

Page e2.06     Unmitigated Scenario – Construction Activities Page 6 of 11 e206.gif

Page e2.07     Unmitigated Scenario – Construction Activities Page 7 of 11 e207.gif

Page e2.08     Unmitigated Scenario – Construction Activities Page 8 of 11 e208.gif

Page e2.09     Unmitigated Scenario – Construction Activities Page 9 of 11 e209.gif

Page e2.10     Unmitigated Scenario – Construction Activities Page 10 of 11 e210.gif

Page e2.11     Unmitigated Scenario – Construction Activities Page 11 of 11 e211.gif

Appendix F    Detailed Calculations and Results of Cumulative Construction Noise Impacts during Normal Working Hours

Page f1.01      Unmitigated Scenario – Construction Schedule Page 1 of 11 f101.gif

Page f1.02      Unmitigated Scenario – Construction Schedule Page 2 of 11 f102.gif

Page f1.03      Unmitigated Scenario – Construction Schedule Page 3 of 11 f103.gif

Page f1.04      Unmitigated Scenario – Construction Schedule Page 4 of 11 f104.gif

Page f1.05      Unmitigated Scenario – Construction Schedule Page 5 of 11 f105.gif

Page f1.06      Unmitigated Scenario – Construction Schedule Page 6 of 11 f106.gif

Page f1.07      Unmitigated Scenario – Construction Schedule Page 7 of 11 f107.gif

Page f1.08      Unmitigated Scenario – Construction Schedule Page 8 of 11 f108.gif

Page f1.09      Unmitigated Scenario – Construction Schedule Page 9 of 11 f109.gif

Page f1.10      Unmitigated Scenario – Construction Schedule Page 10 of 11 f110.gif

Page f1.11      Unmitigated Scenario – Construction Schedule Page 11 of 11 f111.gif

Page f2.01      Unmitigated Scenario – Construction Schedule Page 1 of 12 f201.gif

Page f2.02      Unmitigated Scenario – Construction Schedule Page 2 of 12 f202.gif

Page f2.03      Unmitigated Scenario – Construction Schedule Page 3 of 12 f203.gif

Page f2.04      Unmitigated Scenario – Construction Schedule Page 4 of 12 f204.gif

Page f2.05      Unmitigated Scenario – Construction Schedule Page 5 of 12 f205.gif

Page f2.06      Unmitigated Scenario – Construction Schedule Page 6 of 12 f206.gif

Page f2.07      Unmitigated Scenario – Construction Schedule Page 7 of 12 f207.gif

Page f2.08      Unmitigated Scenario – Construction Schedule Page 8 of 12 f208.gif

Page f2.09      Unmitigated Scenario – Construction Schedule Page 9 of 12 f209.gif

Page f2.10      Unmitigated Scenario – Construction Schedule Page 10 of 12 f210.gif

Page f2.11      Unmitigated Scenario – Construction Schedule Page 11 of 12 f211.gif

Page f2.12      Unmitigated Scenario – Construction Schedule Page 12 of 12 f212.gif

Appendix G   Powered Mechanical Equipment (PME) for Different Construction Tasks during Restricted Working Hours

Page g.01       Powered Mechanical Equipment (PME) for Restricted Periods g01.gif

Appendix H   Detailed Calculations and Results of Cumulative Construction Noise Impacts during Restricted Working Hours

Page h.03       Noise Receiver Reference Page 3 of 15 h01.gif

Page h.04       Noise Receiver Reference Page 4 of 15 h02.gif

Page h.05       Noise Receiver Reference Page 5 of 15 h03.gif

Page h.06       Noise Receiver Reference Page 6 of 15 h04.gif

Page h.07       Noise Receiver Reference Page 7 of 15 h05.gif

Page h.08       Noise Receiver Reference Page 8 of 15 h06.gif

Page h.09       Noise Receiver Reference Page 9 of 15 h07.gif

Page h.10       Noise Receiver Reference Page 10 of 15 h08.gif

Page h.11       Noise Receiver Reference Page 11 of 15 h09.gif

Page h.12       Noise Receiver Reference Page 12 of 15 h10.gif

Page h.13       Noise Receiver Reference Page 13 of 15 h11.gif

Page h.14       Noise Receiver Reference Page 14 of 15 h12.gif

Page h.15       Noise Receiver Reference Page 15 of 15 h13.gif

Appendix I     Sample CALINE Air Quality Model Output

Page i.01        Page 1 of 4 i01.gif

Page i.02        Page 2 of 4 i02.gif

Page i.03        Page 3 of 4 i03.gif

Page i.04        Page 4 of 4 i04.gif

Appendix J     Sample ISCST3 Air Quality Model Output

Page j.01        Page 1 of 10 j01.gif

Page j.02        Page 2 of 10 j02.gif

Page j.03        Page 3 of 10 j03.gif

Page j.04        Page 4 of 10 j04.gif

Page j.05        Page 5 of 10 j05.gif

Page j.06        Page 6 of 10 j06.gif

Page j.07        Page 7 of 10 j07.gif

Page j.08        Page 8 of 10 j08.gif

Page j.09        Page 9 of 10 j09.gif

Page j.10        Page 10 of 10 j10.gif

Appendix K    Calculation of Dust Emission Factors

Page k.01       Scenario 1 of 8 k01.gif

Page k.02       Scenario 2 of 8 k02.gif

Page k.03       Scenario 3a of 8 k03.gif

Page k.04       Scenario 3b bof 8 k04.gif

Page k.05       Scenario 4 of 8 k05.gif

Page k.06       Scenario 5a of 8 k06.gif

Page k.07       Scenario 5b of 8 k07.gif

Page k.08       Scenario 6a of 8 k08.gif

Page k.09       Scenario 6b of 8 k09.gif

Page k.11       Scenario 7a of 8 k10.gif

Page k.12       Scenario 7b of 8 k11.gif

Page k.13       Scenario 8a of 8 k12.gif

Page k.14       Scenario 8bof 8 k13.gif

Appendix L    Sample Computer Output from FDM used in Construction Air Quality Assessments

Page l.01        Scenario 1 Daytime and Night-time – Unmitigated Page 1 of 15 l01.gif

Page l.02        Scenario 1 Daytime and Night-time – Unmitigated Page 2 of 15 l02.gif

Page l.03        Scenario 1 Daytime and Night-time – Unmitigated Page 3 of 15 l03.gif

Page l.04        Scenario 1 Daytime and Night-time – Unmitigated Page 4 of 15 l04.gif

Page l.05        Scenario 1 Daytime and Night-time – Unmitigated Page 5 of 15 l05.gif

Page l.06        Scenario 1 Daytime and Night-time – Unmitigated Page 6 of 15 l06.gif

Page l.07        Scenario 1 Daytime and Night-time – Unmitigated Page 7 of 15 l07.gif

Page l.08        Scenario 1 Daytime and Night-time – Unmitigated Page 8 of 15 l08.gif

Page l.09        Scenario 1 Daytime and Night-time – Unmitigated Page 9 of 15 l09.gif

Page l.10-       Scenario 1 Daytime and Night-time – Unmitigated Page 10 of 15 l10.gif

Page l.11        Scenario 1 Daytime and Night-time – Unmitigated Page 11 of 15 l11.gif

Page l.12        Scenario 1 Daytime and Night-time – Unmitigated Page 12 of 15 l12.gif

Page l.13        Scenario 1 Daytime and Night-time – Unmitigated Page 13 of 15 l13.gif

Page l.14        Scenario 1 Daytime and Night-time – Unmitigated Page 14 of 15 l14.gif

Page l.15        Scenario 1 Daytime and Night-time – Unmitigated Page 15 of 15 l15.gif

Appendix M   Dust Levels for Different Construction Scenarios (Unmitigated)

Page m.01      Scenario 4 – Unmitigated Page 1 of 3 m01.gif

Page m.02      Scenario 4 – Unmitigated Page 2 of 3 m02.gif

Page m.03      Scenario 4 – Unmitigated Page 3 of 3 m03.gif

Appendix N   Dust Levels for Different Construction Scenarios (Mitigated)

Page n.01       Scenario 4 – Mitigated Page 1 of 3 n01.gif

Page n.02       Scenario 4 – Mitigated Page 2 of 3 n02.gif

Page n.03       Scenario 4 – Mitigated Page 3 of 3 n03.gif

Appendix O   Hydraulic and Water Quality Modelling Results

Figure o1.1     Central Reclamation Phase III Baseline model mesh near Central o01.gif

Figure o1.2a   Baseline Layout, surface flow patterns, wet season spring tide o02.gif

Figure o1.2b   Baseline Layout, surface flow patterns, wet season neap tide o03.gif

Figure o1.3a   Baseline Layout, maximum speeds, wet season spring tide o04.gif

Figure o1.3b   Baseline Layout, maximum speeds, wet season neap tide o05.gif

Figure o1.4a   Baseline Layout, surface flow patterns, dry season spring tide o06.gif

Figure o1.4b   Baseline Layout, surface flow patterns, dry season neap tide o07.gif

Figure o1.5a   Baseline Layout, maximum speeds, dry season spring tide o08.gif

Figure o1.5b   Baseline Layout, maximum speeds, dry season neap tide o09.gif

Figure o1.6a   Baseline Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide o10.gif

Figure o1.6b   Baseline Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide o11.gif

Figure o1.6c   Baseline Layout, tide-averaged dissolved oxygen concentrations, wet season o12.gif

Figure o1.7a   Baseline Layout, tide-averaged total BOD5 concentrations, wet season spring tide o13.gif

Figure o1.7b   Baseline Layout, tide-averaged total BOD5 concentrations, wet season neap tide o14.gif

Figure o1.8a   Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season spring tide o15.gif

Figure o1.8b   Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season neap tide o16.gif

Figure o1.8c   Baseline Layout, tide- and depth-averaged unionised ammoniacal nitrogen concentrations, wet season o17.gif

Figure o1.8d   Baseline Layout, tide-averaged total inorganic nitrogen concentrations, wet season spring tide o18.gif

Figure o1.8e   Baseline Layout, tide-averaged total inorganic nitrogen concentrations, wet season neap tide o19.gif

Figure o1.8a   Baseline Layout, tide- and depth-averaged total inorganic nitrogen concentrations, wet season o20.gif

Figure o1.9a   Baseline Layout, tide-averaged E. coli concentrations, wet season spring tide o21.gif

Figure o1.9b   Baseline Layout, tide-averaged E. coli concentrations, wet season neap tide o22.gif

Figure o1.10a Baseline Layout, tide-averaged dissolved oxygen concentrations, dry season spring tide o23.gif

Figure o1.10b            Baseline Layout, tide-averaged dissolved oxygen concentrations, dry season neap tide o24.gif

Figure o1.10c Baseline Layout, tide- and depth-averaged dissolved oxygen concentrations, dry season o25.gif

Figure o1.11a Baseline Layout, tide-averaged total BOD5 concentrations, dry season spring tide o26.gif

Figure o1.11b            Baseline Layout, tide-averaged total BOD5 concentrations, dry season neap tide o27.gif

Figure o1.12a Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, dry season spring tide o28.gif

Figure o1.12b            Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, dry season neap tide o29.gif

Figure o1.12c Baseline Layout, tide- and depth-averaged unionised ammoniacal nitrogen concentrations, dry season o30.gif

Figure o1.12d            Baseline Layout, tide-averaged total inorganic nitrogen concentrations, dry season spring tide o31.gif

Figure o1.12e Baseline Layout, tide-averaged total inorganic nitrogen concentrations, dry season neap tide o32.gif

Figure o1.12f  Baseline Layout, tide- and depth-averaged total inorganic nitrogen concentrations, dry season o33.gif

Figure o1.13a Baseline Layout, tide-averaged E. coli concentrations, dry season spring tide o34.gif

Figure o1.13b            Baseline Layout, tide-averaged E. coli concentrations, dry season neap tide o35.gif

Figure o2.1     Central Reclamation Phase III construction phase model mesh near Central o36.gif

Figure o2.2a   Intermediate Layout, surface flow patterns, wet season spring tide o37.gif

Figure o2.2b   Intermediate Layout, surface flow patterns, wet season neap tide o38.gif

Figure o2.3a   Intermediate Layout, maximum speeds, wet season spring tide o39.gif

Figure o2.3b   Intermediate Layout, maximum speeds, wet season neap tide o40.gif

Figure o2.4a   Intermediate Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide o41.gif

Figure o2.4b   Intermediate Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide o42.gif

Figure o2.5a   Intermediate Layout, tide-averaged total BOD5 concentrations, wet season spring tide o43.gif

Figure o2.5b   Intermediate Layout, tide-averaged total BOD5 concentrations, wet season neap tide o44.gif

Figure o2.6a   Intermediate Layout, tide-averaged unionised ammoniacal nitrogren concentrations, wet season spring tide o45.gif

Figure o2.6b   Intermediate Layout, tide-averaged unionised ammoniacal nitrogren concentrations, wet season neap tide o46.gif

Figure o2.6c   Intermediate Layout, tide- and depth-averaged unionised ammoniacal nitrogren concentrations, wet season o47.gif

Figure o2.6d   Intermediate Layout, tide-averaged total inorganic nitrogren concentrations, wet season spring tide o48.gif

Figure o2.6e   Intermediate Layout, tide-averaged total inorganic nitrogren concentrations, wet season neap tide o49.gif

Figure o2.6f    Intermediate Layout, tide- and depth-averaged total inorganic nitrogren concentrations, wet season o50.gif

Figure o2.7a   Intermediate Layout, tide-averaged E. coli concentrations, wet season spring tide o51.gif

Figure o2.7b   Intermediate Layout, tide-averaged E. coli concentrations, wet season neap tide o52.gif

Figure o2.9a   Intermediate Layout, simulation of floating debris, wet season neap tide, LW release o53.gif

Figure o2.9b   Intermediate Layout, simulation of floating debris, wet season neap tide, HW release o54.gif

Figure o3.1     Central Reclamation Phase III operational phase model mesh near Central        o55.gif

Figure o3.2a   Final Layout, surface flow paterns, wet season spring tide o56.gif

Figure o3.2b   Final Layout, surface flow paterns, wet season neap tide o57.gif

Figure o3.3a   Final Layout, maximum speeds, wet season spring tide o58.gif

Figure o3.3b   Final Layout, maximum speeds, wet season neap tide o59.gif

Figure o3.4a   Final Layout, surface flow patterns, dry season spring tide o60.gif

Figure o3.4b   Final Layout, surface flow patterns, dry season neap tide o61.gif

Figure o3.5a   Final Layout, maximum speeds, dry season spring tide o62.gif

Figure o3.5b   Final Layout, maximum speeds, dry season neap tide o63.gif

Figure o3.6a   Final Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide o64.gif

Figure o3.6b   Final Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide o65.gif

Figure o3.6c   Final Layout, tide- and depth-averaged dissolved oxygen concentrations, wet season o66.gif

Figure o3.7a   Final Layout, tide-averaged total BOD5 concentrations, wet season spring tide o67.gif

Figure o3.7b   Final Layout, tide-averaged total BOD5 concentrations, wet season neap tide o68.gif

Figure o3.8a   Final Layout, tide-average unionised ammoniacal nitrogen concentrations, wet season spring tide o69.gif

Figure o3.8b   Final Layout, tide-average unionised ammoniacal nitrogen concentrations, wet season neap tide o70.gif

Figure o3.8a   Final Layout, tide- and depth-averaged unionised ammoniacal nitrogen concentrations, wet season o71.gif

Figure o3.8d   Final Layout, tide-averaged total inorganic nitrogen concentrations, wet season spring tide o72.gif

Figure o3.8e   Final Layout, tide-averaged total inorganic nitrogen concentrations, wet season neap tide o73.gif

Figure o3.8f    Final Layout, tide- and depth-average total inorganic nitrogen concentrations, wet seasono74.gif

Figure o3.9a   Final Layout, tide-averaged E. coli concentrations, wet season spring tide o75.gif

Figure o3.9b   Final Layout, tide-averaged E. coli concentrations, wet season neap tide o76.gif

Figure o3.10a Final Layout, tide-averaged dissolved concentrations, dry season spring tide o77.gif

Figure o3.10b            Final Layout, tide-averaged dissolved concentrations, dry season neap tide o78.gif

Figure o3.10c Final Layout, tide- and depth-averaged dissolved concentrations, dry season o79.gif

Figure o3.11a Final Layout, tide-averaged total BOD5 concentrations, dry season spring tide o80.gif

Figure o3.11b            Final Layout, tide-averaged total BOD5 concentrations, dry season neap tide o81.gif

Figure o3.12a Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations, dry season spring tide o82.gif

Figure o3.12b            Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations, dry season neap tide o83.gif

Figure o3.12c Final Layout, tide- and depth-averaged unionised ammoniacal nitrogen concentrations, dry season o84.gif

Figure o3.12d            Final Layout, tide-averaged total inorganic nitrogen concentrations, dry season spring tide o85.gif

Figure o3.12e Final Layout, tide-averaged total inorganic nitrogen concentrations, dry season neap tide o86.gif

Figure o3.12f  Final Layout, tide- and depth-averaged total inorganic nitrogen concentrations, dry season o87.gif

Figure o3.13a Final Layout, tide-averaged E. coli concentrations, dry season spring tide o88.gif

Figure o3.13b            Final Layout, tide-averaged E. coli concentrations, dry season neap tide o89.gif

Figure o3.16a Final Layout, simulation of floating debris, wet season neap tide LW release o90.gif

Figure o3.16b            Final Layout, simulation of floating debris, wet season neap tide HW release o91.gif

Figure o3.17a Final Layout, simulation of floating debris, dry season neap tide LW release o92.gif

Figure o3.17b            Final Layout, simulation of floating debris, dry season neap tide HW release o93.gif

Figure o4.1     Residual Seasonal Water Flows In The Region o94.gif

Table o1a       Dissolved Oxygen at Sensistive Receivers (Wet Season) o95.gif

Table o1b       Dissolved Oxygen at Sensistive Receivers (Dry Season) o96.gif

Table o2a       Total BOD5 at Sensitive Receivers (Wet Season) o97.gif

Table o2b       Total BOD5 at Sensitive Receivers (Dry Season) o98.gif

Table o3a       Unionised ammonical nitrogen at Sensitive Receivers (Wet Season) o99.gif

Table o3b       Unionised ammonical nitrogen at Sensitive Receivers (Dry Season) o100.gif

Table o4a       Total Oxidised nitrogen at Sensitive Receivers (Wet Season) o101.gif

Table o4b       Total Oxidised nitrogen at Sensitive Receivers (Dry Season) o102.gif

Table o5a       Total Kjeldahl nitrogen at Sensitive Receivers (Wet Season) o103.gif

Table o5b       Total Kjeldahl nitrogen at Sensitive Receivers (Dry Season) o104.gif

Table o6a       Total Inorganic nitrogen at Sensitive Receivers (Wet Season) o105.gif

Table o6b       Total Inorganic nitrogen at Sensitive Receivers (Dry Season) o106.gif

Table o7a       Phosphate at Sensitive Receivers (Wet Season) o107.gif

Table o7b       Phosphate at Sensitive Receivers (Dry Season) o108.gif

Table o8a       Suspended Solids at Sensitive Receivers (Wet Season) o109.gif

Table o8b       Suspended Solids at Sensitive Receivers (Dry Season) o110.gif

Table o9a       E.coli at Sensitive Receivers (Wet Season) o111.gif

Table o9a       E.coli at Sensitive Receivers (Dry Season) o112.gif

Appendix P    Information Abstracted from Previous Sediment Quality Report for the Project Site as applicable to the CRIII Minimum Option Layout

Figure p.01     Location of Vibrocore Sample Statoins Applicable to the CRIII Minimum Option Layout p01.gif

Appendix Q   Cumulative Water Quality Assessments for CRIII and WDII projects undertaken as part of the WDII EIA Study

Figure q01      Cumulative Construction Scenario – Tidal Averged Surface SS Elevation Spring-Neap Cycle, Wet Season q01.gif

Figure q02      Cumulative Construction Scenario – Tidal Averged Surface SS Elevation Spring-Neap Cycle, Dry Season q02.gif

Figure q03      Cumulative Construction Scenario – Tidal Averged Sedimentation Rate Spring-Neap Cycle, Wet Season q03.gif

Figure q04      Cumulative Construction Scenario – Tidal Averged Sedimentation Rate Spring-Neap Cycle, Dry Season q04.gif

Figure q05      Coastline Configuration for Cumulative Operation Scenario q05.gif

Figure q06      Operation Scenario – Surface Flow Pattern in Victoria Harbour q06.gif

Figure q07      Operation Senario – Depth Averaged Flow Speed in Victoria Harbour Wet Season q07.gif

Figure q08      Operation Senario – Surface Flow Pattern in Victoria Harbour Dry Season q08.gif

Figure q09      Operation Senario – Depth Averaged Flow Speed in Victoria Harbour Dry Season q09.gif

Figure q10a    Operation Senario – Tidal and Depth Averaged DO & BOD5 Concentrations, Spring-Neap Cycle, Wet Season q10.gif

Figure q10b    Operation Senario – Tidal and Depth Averaged DO & BOD5 Concentrations, Spring-Neap Cycle, Wet Season q11.gif

Figure q11a    Operation Senario – Tidal and Depth Averaged NH3-N & TIN Concentrations, Spring-Neap Cycle, Wet Season q12.gif

Figure q11b    Operation Senario – Tidal and Depth Averaged NH3-N & TIN Concentrations, Spring-Neap Cycle, Wet Season q13.gif

Figure q12      Operation Senario – Tidal and Depth Averaged E.coli Concentration, Spring-Neap Cycle, Wet Season q14.gif

Figure q13a    Operation Senario – Tidal and Depth Averaged DO & BOD5 Concentrations, Spring-Neap Cycle, Dry Season q15.gif

Figure q13b    Operation Senario – Tidal and Depth Averaged DO & BOD5 Concentrations, Spring-Neap Cycle, Dry Season q16.gif

Figure q14a    Operation Senario – Tidal and Depth Averaged NH3-N & TIN Concentrations, Spring-Neap Cycle, Dry Season q17.gif

Figure q14b    Operation Senario – Tidal and Depth Averaged NH3-N & TIN Concentrations, Spring-Neap Cycle, Dry Season q18.gif

Figure q15      Operation Senario – Tidal and Depth Averaged E.coli Concentration, Spring-Neap Cycle, Dry Season q19.gif

Figure q16      Operation Senario – Tidal Minimum Depth Averaged DO Concentration, Spring-Neap Cycle, Wet Season q20.gif

Figure q17      Operation Senario – Tidal Minimum Bottom Layer DO Concentration, Spring-Neap Cycle, Wet Season q21.gif

Figure q18      Operation Senario – Tidal Minimum Depth Averaged DO Concentration, Spring-Neap Cycle, Dry Season q22.gif

Figure q19      Operation Senario – Tidal Minimum Bottom Layer DO Concentration, Spring-Neap Cycle, Dry Season q23.gif

Appendix R    SedPlume Modelling Scenarios and results from Previous Studies for the Project Site

Figure r.01      Construction Works Areas r01.gif

Figure r.02      Scenario 1 – Suspened Sediment Concentrations, Dry Season Spring Tide r02.gif

Figure r.03      Scenario 1 – Suspended Sediment Concentrations, Dry Season Spring Tide r03.gif

Figure r.04      Location of the Cooling Water Intakes and Outlets r04.gif

Figure r.05      Scenario 2 – Suspened Sediment Concentrations, Dry Season Spring Tide r05.gif

Figure r.06      Scenario 2 – Suspened Sediment Concentrations, Dry Season Spring Tide r06.gif

Appendix S    EMSD Cooling Water Systems Data

Page s.01        EMSD Cooling Water Systems Data Page 1 of 14 s01.gif

Page s.02        EMSD Cooling Water Systems Data Page 2 of 14 s02.gif

Page s.03        EMSD Cooling Water Systems Data Page 3 of 14 s03.gif

Page s.04        EMSD Cooling Water Systems Data Page 4 of 14 s04.gif

Page s.05        EMSD Cooling Water Systems Data Page 5 of 14 s05.gif

Page s.06        EMSD Cooling Water Systems Data Page 6 of 14 s06.gif

Page s.07        EMSD Cooling Water Systems Data Page 7 of 14 s07.gif

Page s.08        EMSD Cooling Water Systems Data Page 8 of 14 s08.gif

Page s.09        EMSD Cooling Water Systems Data Page 9 of 14 s09.gif

Page s.10        EMSD Cooling Water Systems Data Page 10 of 14 s10.gif

Page s.11        EMSD Cooling Water Systems Data Page 11 of 14 s11.gif

Page s.12        EMSD Cooling Water Systems Data Page 12 of 14 s12.gif

Page s.13        EMSD Cooling Water Systems Data Page 13 of 14 s13.gif

Page s.14        EMSD Cooling Water Systems Data Page 14 of 14 s14.gif

Appendix T    Baseline Study - Description of the Environment

Figure t.01      Baseline Landscape And Visual Character Areas t01.gif

Figure t.02      Baseline Visual Envelope And Photo View Point Location t02.gif

Figure t.03      Primary Visual Receivers And Proposed Development Heights t03.gif

Figure t.04      Landscape And Visual Characteristics Photograph View A And B t04.gif

Figure t.05      Landscape And Visual Characteristics Photograph View C t05.gif

Figure t.06      Landscape And Visual Characteristics Photograph View D And E t06.gif

Figure t.07      Landscape And Visual Characteristics Photograph View F t07.gif

Figure t.08      Aerial View of the Study Area from The West (1997) Photograph View G t08.gif

Figure t.09      Aerial View of the Study Area from The East (1997) Photograph View H t09.gif

Appendix U   Planning and Development Control Framework

Appendix V    Landscape & Visual Impact Assessment for Redesign of the Hong Kong Station Extended Overrun Tunnel

Figure v.a1     View South From Vistoria Harbour – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v01.gif

Figure v.a1     View South From Vistoria Harbour – Day 1 with Promenade Landscaping v02.gif

Figure v.a3     View South From Vistoria Harbour – Year 10 with Promenade Landscape Proposal v03.gif

Figure v.b1     View South West From Expo Drive (At Grade) – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v04.gif

Figure v.b2     View South West From Expo Drive (At Grade) – Day 1 with Promenade Landscaping v05.gif

Figure v.b3     View South West From Expo Drive (At Grade) – Year 10 with Promenade Landscape Proposal v06.gif

Figure v.c1     View Friom Promenade – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v07.gif

Figure v.c2     View Friom Promenade – Day 1 with Promenade Landscaping v08.gif

Figure v.c3     View Friom Promenade – Year 10 with Promenade Landscape Proposal v09.gif

Figure v.d1     View West From Lung Wui Road (At Grade) – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v10.gif

Figure v.d2     View West From Lung Wui Road (At Grade) – Day 1 with Promenade Landscaping v11.gif

Figure v.d3     View West From Lung Wui Road (At Grade) – Year 10 with Promenade Landscape Proposal v12.gif

Figure v.e1     View North West Across Tamar Site From Wanchai – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v13.gif

Figure v.e2     View North West Across Tamar Site From Wanchai – Day 1 with Promenade Landscaping v14.gif

Figure v.e3     View North West Across Tamar Site From Wanchai – Day 1 with Promenade Landscape Proposal v15.gif

Figure v.f1      View East From Lung Wui Road (At Grade) – Day 1 with Minimum Mitigation if there is a programme delay on Promenade Landscape Works v16.gif

Figure v.f2      View East From Lung Wui Road (At Grade) – Day 1 with Promenade Landscaping v17.gif

Figure v.f3      View East From Lung Wui Road (At Grade) – Year 10 with Promenade Landscape Proposal v18.gif

Appendix W  Built Heritage Impact Assessment

APPENDIX A    PROJECT HISTORY

A.1                     Background To The Project

Reclamation at Central and Wan Chai was first proposed in 1983 by the Study on Harbour Reclamation and Urban Growth (SHRUG). Since then, the case for reclamation has been reconfirmed under a number of other studies. These include the Central and Wan Chai Reclamation Feasibility Study (CWCRFS) (1991), and the subsequent Central and Wan Chai Reclamation Development - Development of Urban Design Parameters Study (DUDPS) (1993). As a result of these studies and detailed engineering work, a portion of the Central and Wan Chai reclamation has already been implemented. The Central Reclamation Phase I (CRI) and Central Reclamation Phase II (CRII) reclamation works were completed in early 1997, leaving CRIII subject to further study.

In June 1997, the then Legislative Council (LegCo) enacted the ‘Protection of the Harbour Ordinance’. Under the Protection of the Harbour Ordinance (Harbour Ordinance), the central harbour is to be protected and preserved as a special public asset and a natural heritage of the people of Hong Kong. The Harbour Ordinance does not prohibit reclamation; however, all public bodies are required to have regard to the principle of "presumption against reclamation" and should assess the public benefits of any necessary reclamation projects in the central harbour against the preservation of this part of the harbour.

Subsequent to consultation with the Executive Council (ExCo), an outline zoning plan based on a "Streamlined Option" for CRIII was prepared and gazetted on 29 May 1998. Upon expiry of the exhibition period, 71 notices of objections were received. Most of these were expressions of concern for the necessity of extensive reclamation and its consequent impact to the harbour.

There is, however, a general acknowledgement that some reclamation is necessary to accommodate essential transport infrastructure links in the area and to provide for a quality, world-class waterfront.

On the basis of the reaction to the streamlined option, this study provides a minimum reclamation profile which:-

o        provides sufficient land for required marine and land based transport infrastructure;

o        has a limited impact on the harbour; and

o        provides adequate land to produce a high quality waterfront promenade which is to the standard of urban waterfronts elsewhere in the world.

A.2                        Planning And Development Context

A.2.1                     Strategic Planning Context

A.2.1.1                  Study on Harbour Reclamations and Urban Growth (SHRUG)

Proposals for harbour reclamation were first outlined under the Study on Harbour Reclamations and Urban Growth (SHRUG) undertaken in 1983. SHRUG postulated that the future growth in the metropolitan area bounding the harbour could only be achieved through a commitment to land reclamation. Three main urban reclamations, namely West Kowloon, Green Island, and Central and Wan Chai were identified. Central Reclamation Phase III was first proposed as a component part of the Central and Wan Chai Reclamation.

A.2.1.2                     Port and Airport Development Strategy (PADS)

SHRUG proposals were embraced and developed by the Port and Airport Development Strategy (PADS) which was completed in 1989. PADS articulated an urban development strategy premised on the relocation of the international airport at Kai Tak to an alternative location and the development of a major new port in the western harbour. The strategy emphasised the role of new land reclamation as a support resource to new air and port infrastructure. The strategy also gave recognition to the need to provide for the expansion of the Central Business District (CBD) on Hong Kong Island to allow for the continued expansion of the Hong Kong economy which was anticipated to be stimulated by the implementation of PADS proposals.

A.2.1.3                  Metroplan

Metroplan was approved by the Executive Council of the Hong Kong Government in 1991 to provide a land use - transport -environmental framework for the entire Metro Area. This comprised Hong Kong Island, Kowloon, New Kowloon and Tsuen Wan - Kwai Tsing. A time horizon extending to the year 2011 was assumed for planning purposes. A territorial population of about 6.5 million people was assumed to be achieved by 2011. Principal objectives of Metroplan that are relevant to this study are:-

o        to enhance Hong Kong’s role as an international business, finance and tourist centre;

o        to achieve a more balanced distribution of jobs relative to population concentrations, the locational preferences of new enterprises and the ease of travel;

o        to create an urban form that will foster a sense of identity;

o        to conserve and enhance major landscape attributes and important heritage features;

o        to provide a multi-choice, high capacity transport system that is financially viable, energy efficient and makes provision for the safe and convenient movement of pedestrians; and

o        to provide a strategy that can be carried out by both the public and private sectors under variable circumstances, particularly with respect to the availability of resources and significant changes of demand.

Metroplan is currently under review. The Stage 1 review has been completed. This has examined the baseline situation, formed broad suggestions for tackling the identified land use, transport and environmental problems, and set out the actions for the Stage II Study. The Stage II review, which commenced recently, will carry out a more detailed and comprehensive review of the Metro Area. It is anticipated that a revised development strategy will result from the review process to guide the planning and development of the Metro Area to the year 2016. One of the major changes which will have to be addressed is the tremendous growth in population currently anticipated by Government for the year 2016 (currently estimated at 8.9 million). Central Reclamation III is likely to be utilised principally for public, Government and commercial purposes.

A.2.1.4                 Territorial Development Strategy Review (TDSR)

In 1998 the Hong Kong Government of the Special Administrative Region (SAR) of China completed the Territorial Development Strategy Review. The review was intended to provide a land use-transport-environmental framework from which more detailed plans and programmes could be prepared. The current strategy was endorsed by the Executive Council on 24 February 1998. A time horizon extending to 2011 was assumed with a territorial population of about 8.1 million people. In seeking to satisfy the land use needs arising from demographic and economic pressures, the TDSR formulated a broad strategy which would require the optimal use to be made of spare capacities in currently agreed plans and programmes: through the redevelopment of obsolete areas; by the development of supplementary sites on the periphery of urban areas; and by the provision of land in new strategic growth areas created both by harbour reclamation and the use of suitable lowland rural areas.

A.2.2                     Development Proposals for Central and Wan Chai Reclamation

The Recommended Outline Development Plan and Development of Urban Design Parameters Study (1993)

Initial planning proposals for the CWCR were first produced in September 1989. These proposals were subsequently refined leading to the production of a Recommended Outline Development Plan (RODP) in 1993.

It is important to note that the 1993 RODP was preceded by an urban design analysis and eventually accompanied by a series of urban design parameters. Thus the land use parameters included within the plan were considered in two and three dimensions with detailed thought being given to the realisation of the proposals through a considered approach to land disposal and the application of lease conditions. Most importantly the urban design and planning approach gave detailed consideration to the integration of proposed development on the reclamation with that in the urban hinterland. Emphasis was also given to the management of space and pedestrian circulation set within practicably achievable parameters which gave strong emphasis to quality.

A.2.2.2               Hong Kong Island West Development Statement (HKWDS)

As a follow-up to Metroplan, five Development Statements have been completed. The most recent and relevant of these is the Hong Kong Island West Development Statement, where the needs of the Central Reclamation have been considered in detail. The HKWDS was endorsed by the Committee on Planning and Land Development (CPLD) in 1997.

The study confirmed that reclamation (although possibly a reduced reclamation) was essential to support key transport and other infrastructure as well as a number of key land uses.

The HKWDS also took cognisance of the recommendations of the "Comprehensive Study on Marine Activities, Risk Assessment and the Development of a Future Strategy for the Optimum Usage of Hong Kong Waters" (MARAD) which concluded in broad terms that the future strategy for port development should be to decentralise port functions to the east and west, leaving the central harbour for marine - based recreational activities. To this extent, HKWDS proposed the introduction of the latter and advocated a series of schemes linked to the development of a high quality waterfront promenade.

Protection of the Harbour Ordinance

Notwithstanding the depth of studies and public consultation undertaken for Metroplan and the TDSR and the views taken by the Government in selecting preferred strategies in each case, there was opposition to harbour reclamation. Concerns relate to the effect of reclamation on such issues as water quality, marine safety, and aesthetics. This eventually led to the enactment on 30 June 1997 of the "Protection of the Harbour Ordinance" which establishes a presumption against reclamation in the central harbour, with the limits set by :-

o        on the east - a straight line drawn from the extreme south-east point of Hung Hom adjacent to Kowloon Bay to the extreme north point of Hong Kong Island at North Point; and

o        on the west - a line following the course of the easternmost conduit of the tunnel defined in Section 2 of the Western Harbour Crossing Ordinance (Cap 436).

The main provision under Section 3 of the Ordinance is the establishment of a legal presumption against reclamation in the central harbour. The Department of Justice has advised that the principle does not prohibit reclamation or impose any specific procedural requirement, but requires that public benefit of the preservation of the central harbour to be weighed against the public benefit of the reclamation project before a decision to proceed with the project is taken. Provided that the balancing exercise is undertaken, the court would not substitute its own decision for that of the public officers and bodies concerned.

There are two principal concerns :-

o        the extent to which new reclamation is required to be kept within minimum limits in order to satisfy the needs of the community for additional land both for new land uses and infrastructure that functionally cannot be located elsewhere and which need to be located within a proposed reclamation area; and

o        in determining the minimum limits of any new reclamation, it should be established that the attributes of the central harbour would not be unreasonably diminished (or, conversely, enhanced) as a special public asset and natural heritage of the Hong Kong people.

Plan Structure

The current OZP was prepared against a backcloth of a strong harbour reclamation lobby but was at the same time required to respond to the findings of successive strategic and localised studies, all of which confirmed the need for reclamation. The strategic studies which had addressed the need for reclamation and the detailed reclamation studies which examined the feasibility of the reclamation on engineering, planning, urban design, property market, etc. grounds all confirmed the need for the Central and Wan Chai reclamation for a range of reasons. Most importantly, each of the property studies undertaken broadly confirmed the need for a similar quantum of commercial development to enable Hong Kong’s future economic prosperity and to provide for the expansion of the Central Business District. Of importance is that the principal area within which future commercial growth is to be facilitated lies within the current Draft OZP Planning Area.

Whilst the OZP has given emphasis to the accommodation of sites for commercial development, it has also had to respond to high level demands for various G/IC facilities.

The current OZP Planning Components

The OZP is essentially a hybrid version of previous planning proposals for the reclamation. The plan reflects proposals arising form Government’s review of the requirements for the remaining CRIII and Wan Chai Development Phase II (WDII), and has adopted some elements of past proposals. The OZP was premised as a response to perceived land use requirements and did not have the opportunity to undertake a detailed urban design appreciation.

The Draft OZP has a Planning Area amounting to some 58.35 ha. The plan includes some 15 separate sites allocated to commercial use. A large reservation (the Tamar Basin reclamation) is allocated for the development of a new Central Government Complex, and the balance of land use is ascribed to G/IC and open space purposes. It is notable that the OZP is not prescriptive on the extent of land which should eventually be committed to hotel use. No residential sites are included within the Planning Area.

A.2.3   Overview

This section has outlined past plans and studies applicable to the Study Area. The assessment reveals that there has been a clear shift in thinking over the last 16 years partially as a result of greater public awareness of, and, influence upon, the planning process.

Early studies were predicated on a strong commitment to economic growth, a portion of which was to be reliant upon large-scale land formation. PADS and Metroplan (and later TDSR) separately saw land reclamation as a means to an end and as an avenue through which Hong Kong’s prosperity could be enhanced and improvement of decaying areas could be achieved, whilst maintaining an awareness of the concomitant environmental concerns.

Each strategic study envisaged that Central Reclamation would provide core functions (principally commercial/economic functions) ancillary to their economic objectives. The need for land within the vicinity of Central has also been confirmed by the Office Lands Development Strategy (OLDS).

The Protection of the Harbour Ordinance marked a significant change in direction. The Ordinance gave implicit recognition to the need to consider natural and heritage resources in juxtaposition to strategic development goals.

To this extent, the review contained within this chapter provides important background to the sort of considerations which should influence the preparation of a revised reclamation option for Central Reclamation III. On the one hand, there needs to be a commitment to minimise the impact of reclamation on the harbour while, conversely, a commitment to the provision of a quality waterfront which addresses public aspirations.

APPENDIX B        Review of Reclamation Methodology for CRIII Minimum Option

B.1                        Site Geology

B.1.1                     Geological Profile for CRIII Minimum Option Site

A considerable amount of Site Investigation work has been undertaken as part of the Central Reclamation Phases I, II and III which is applicable to the reclamation layout for the Minimum Option. In particular the previous CRIII Marine Site Investigation Contract undertaken in 1995/1996, which included works entrusted to TDD by MTRC for the Hong Kong Station Extended Overrun Tunnel, provides a substantial amount of applicable data. The location of applicable site investigation stations are illustrated on Figure B.1. A review of available site investigation information indicates that the typical geological profile for the reclamation area is that summarised in Table B.1.

Table B.1 : Typical Geological Profile

Soil Type

Thickness
(m)

Top Level of Soil Stratum
(mPD)

Marine Deposits

3

-11

Alluvium

3

-14

Completely Decomposed Granite

25

-17

Contour Plans of the seabed level, base of Marine Deposits and base of Alluvium as derived from available site investigation information are presented in Figures B.2 to B.4. Typical geological sections through the reclamation area are presented in Figures B.5a and B.5b.

The soils present immediately below the seabed were investigated in some detail during the previous CRIII full reclamation project for the design of the various infrastructure works. In addition a Sediment Quality Report was prepared as required by Works Branch Technical Circular 22/92 – Marine Disposal of Dredged Mud. The soils below the CRIII Minimum Option reclamation area are as follows :

·         a thin layer (approximately 1 m) of Recent Marine Deposit-very soft, black silt/clay with shell fragments and organic matter of artificial contamination;

·         a layer of Marine Deposit (from approximately 1 m to 4 m below the seabed) – soft, dark greenish grey, sandy silty clay with occasional shell fragments; and

·         a layer of Alluvium – brownish yellow, clayey / silty fine to course sand with occasional subangular fine to medium gravel.

 B.1.2                 Engineering Preparation of Soils Below the CRIII Minimum Option Site

B.1.2.1               Introduction

Engineering properties for soils, particularly for Marine Deposits, have been derived from all existing available field and laboratory test data. Whilst the data covers the majority of the CRIII Minimum Option site, there is little or no data for areas surrounding existing ferry piers, landing steps and helipad (refer also to Figure B.1) due to the inability to recover soil samples from these areas in previous fieldwork contracts.

Tables B.2 – B.3 below summarise the engineering properties of the soils.

B.1.2.2                  Bulk and Dry Densities

Tables B.2 provides a summary of Bulk and Dry Density test results for the Marine Deposits found below the site.

Table B.2 : Marine Deposits – Summary of Bulk and Dry Densities

Test type

No. of tests

Maximum Values

Minimum Values

Mean Values

 

 

(mg/m3)

(mg/m3)

(mg/m3)

Bulk Density

172

2.12

1.27

1.67

Dry Density

25

1.39

0.66

1.01

 

Table B.3 provides a summary of Bulk and Dry Density test results for the Alluvial Clay found below the site

Table B.3 : Alluvial Clay – Summary of Bulk and Dry Densities

Test type

No. of tests

Maximum Values

Minimum Values

Mean Values

 

 

(mg/m3)

(mg/m3)

(mg/m3)

Bulk Density

45

2.28

1.64

2.02

Dry Density

14

1.98

1.3

1.66

B.1.2.3            Odeometer Test Results

Table B.4 provides a summary of Oedometer test results for the Marine Deposits and Alluvial Clay found below the site. These results are particularly pertenant to settlement assessments.

Test type

No. of tests

Maximum Values

Minimum Values

Mean Values

Mv x 10-3 (m2/kN)

Cv (m2/yr)

Mv x 10-3 (m2/kN)

Cv (m2/yr)

Mv x 10-3 (m2/kN)

Cv (m2/yr)

Marine Deposits

54

19.2

20.5

1.19

0.38

6.39

2.62

Alluvium Clay

21

4.2

28.7

0.25

0.5

1.11

10

B.1.2.4            Triaxial Test Results

Table B.5 provides a summary of Triaxial test results for Marine Deposits, Alluvial Clay and Alluvial Sand found below the site.

Table B.5 : Summary of Triaxial Test Results

 

 

Soil type

 

 

 

 

Marine Deposits

Alluvial Clay

Alluvial Sand

Values from

C' (kPa)

6.42

2.83

8.85

Triaxial Tests

f'

28.94

33.58

32.32

B.1.2.5            Standard Penetration Test Results

Table B.6 provides a summary of Standard Penetration Test results for all soils found below the site.

Table B.6 : Summary of Standard Penetration Test results

SPT'N

FILL

Marine Sand

Marine Clay

Residual Soil

Alluvium

CDG

HDG

C/HDG

0-2

1

9

56

 

3

 

 

 

3-5

1

7

3

 

9

8

 

 

6-10

1

3

4

 

26

25

 

 

11-15

 

 

 

1

30

28

 

 

16-20

 

1

 

 

23

34

 

 

21-25

1

 

1

1

13

18

 

 

26-30

 

 

 

 

15

24

 

1

31-35

 

 

 

 

14

22

 

1

36-40

 

 

 

 

10

29

 

 

41-45

 

 

 

 

6

21

 

 

46-50

 

 

 

1

6

20

 

 

>50

2

 

 

 

13

210

3

39

 

 

 

 

 

 

 

 

 

TOTAL

6

20

64

3

168

439

3

41

TOTAL NUMBER OF COUNTS :

744

 

 

 

 

 

B.1.3   Sediment Quality Study Results

A Sediment Quality Study was conducted and Sediment Quality Report prepared for the CRIII project in 1995/1996. Whilst the extent of the reclamation has been reduced since that time from 32 ha to 18 ha, the results of that study still remain applicable to the Minimum Option Layout. The earlier study classified the seabed sediments below the CRIII site according to their level of contamination by seven heavy metals as stipulated in the Environmental Protection Department Technical Circular No. 1-1-1992, Classification of Dredged Sediments for Marine Disposal. The contamination levels presented in the Technical Circular serve as criteria for determining the disposal requirements of the dredged materials. Definition of the classification is as follows :

·         Class A

Uncontaminated material, for which no special dredging, transport or disposal methods are required beyond those which would normally be applied for the purpose of ensuring compliance with EPD’s Water Quality Objectives, or for protection of sensitive receptors near the dredging or disposal areas.

·         Class B

Moderately contaminated material, which requires special care during dredging and transport, and which must be disposed of in a manner which minimises the loss of pollutants either into solution or by re-suspension.

·         Class C

Seriously contaminated material, which must be dredged and transported with great care and which cannot be dumped in the gazetted marine disposal grounds as it must be effectively isolated from the environment upon final disposal.

For sediments to be identified within a particular class, only the concentration of one metallic type needs to be exceeded. The criteria for delineating the three classes of sediment contamination are shown in Table B.7.

Table B.7 : Classification of Sediments by Metal Content (mg/kg dry weight)

Class

Cadmium

Chromium

Copper

Mercury

Nickel

Lead

Zinc

A

0.0 – 0.9

0 – 49

0 –54

0.0 – 0.7

0 - 34

0 – 64

0 – 149

B

1.0 – 1.4

50 – 79

55 – 64

0.8 – 0.9

35 - 39

65 – 74

150 – 190

C

1.5 or more

80 or more

65 or more

1.0 or more

40 or more

75 or more

200 or more

The study results indicated that the marine sediments in the study area contain high levels of heavy metals. The bottom mud (1 – 2 m below the seabed), is seriously contaminated.

An Electrochemical Potential analysis conducted as part of the study indicated that the sediments are anaerobic mud. The study also confirmed that the Total Organic Carbon (TOC) contents in the sediments are high (up to 6% of dry weight).

In 2000, a new Works Bureau Technical Circular (WBTC 3/2000) was issued to provide new requirements for testing and classification of seabed sediments. Further sediment quality study works are currently in progress to recover new seabed samples for testing and classification in accordance with this new WBTC. However, it is anticipated that these works will only serve to confirm the contamination status identified in the early study. A new Sediment Quality Report will be prepared and issued to relevant Government Departments to provide information obtained from the fieldwork and laboratory testing work undertaken.

For the proposes of this review, the results of the earlier study conducted in 1995 / 1996 will be used for classification of seabed sediments.

B.2                        Foundation Requirements for Infrastructure Works to be constructed on the CRIII Minimum Opiton Reclamation Platform

B.2.1                     Introduction

A number of major infrastructure works will be constructed on the CRIII reclamation platform immediately following its formation. The foundation requirements for these works and their ability to tolerate settlement (both direct and differential) have a direct bearing on the reclamation method to be used for forming the reclamation platform. The foundation requirements for each of these infrastructure works is outlined in this Chapter.

B.2.2                  Seawalls and Cooling Water Pumping Stations

The seawalls and cooling water pumping stations require a solid foundation to virtually eliminate settlement for stability reasons. Given the high profile nature of the project, it is critical that a reliable foundation is provided for the seawalls. The design of the seawalls for the earlier Central Reclamation Phase I and Phase II projects was based upon dredging all soft seabed deposits to provide the required solid foundation. It is recommended that a similar approach be adopted for the seawalls within the CRIII project.

The extent of seawalls (both permanent and temporary) required for the project is shown on Figure B.6. The temporary seawalls are needed to form two initial reclamation areas required to construct reprovisioned facilities thus enabling completion of the reclamation to proceed. In theory, it would appear possible not to remove soft deposits below the temporary seawalls. However, these seawalls will retain land directly accessible to the public (for access to reprovisioned ferry piers, public landing steps, cooling water pumping stations etc.) and therefore they need to be designed in a manner such that they are treated on the same status as permanent seawalls.

Given the recommendation to remove soft seabed deposits below seawalls for CRIII, the geometry and extent of both initial reclamation areas and the need to complete the infrastructure works on or adjacent to these areas (including cooling water pumping stations, cooling water pipelines, stormwater culvert J extension, public transport facilities etc.) as early as possible, it is further recommended that the whole of both initial reclamation areas should also have all soft seabed deposits removed from below them i.e. it is recommended that both initial reclamation areas be fully dredged. Typical cross sections through both areas are provided in Figure B.7. These cross sections demonstrate the practical difficulties which would exist with trying to retain the limited amount of soft seabed deposits between existing and proposed dredged foundation trenches for the seawalls. The sizes of these initial reclamation areas are highly constrained both by their location and the need to provide sufficient land for the public to access the facilities constructed on or adjacent to them. Therefore they can neither be reduced or increased in size in order to minimise dredging. The extent of dredging required for construction of the initial reclamation areas is indicated on Figure B.6. The quantity of material to be dredged for the initial reclamation areas and the remaining permanent seawalls outside these areas have been computed and are presented in Table B.8.

Area

Quantity of Material to be Dredged (m3)

Initial Reclamation Area West

55,850

Initial Reclamation Area East

202,000

Other Permanent Seawalls

106,650

Total

364,500

 

 

 

 

 

B.2.3                  Central - Wan Chai Bypass Tunnel

In the Comprehensive Feasibility Study for Minimum Option it was recommended that the Central - Wan Chai Bypass Tunnel be constructed by diaphragm walling with "top down" construction. Therefore the foundations will extend down through the soft seabed deposits below the CRIII site to provide a solid foundation with minimum settlement.

The current alignment for the Central - Wan Chai Bypass Tunnel is presented in Figure B.8. It can be divided into three distinct sections as follows :

·         Section 1 is located within the Initial Reclamation Area East, where it is recommended that the reclamation be formed by a fully dredged method (refer to paragraph B.2.2 above);

·         Section 2 is located between the existing seawall forming the boundary of Central Reclamation Phase I and the Initial Reclamation Area East. The approximate length of this section of tunnel is 390 m.

·         Section 3 is located between the Initial Reclamation Area East and the eastern boundary of the reclamation. The approximate length of this section of tunnel is 190 m.

The vertical alignment currently proposed for the Central-Wan Chai Bypass Tunnel is such that the bottom of the tunnel base slab lies within or below the soft seabed deposits for the majority of the CRIII area (refer to Figure B.9).

Due to constraints imposed by maintaining ferry and public vessel operations until reprovisioned facilities are completed, the construction of the reclamation platform between the Initial Reclamation Areas cannot be commenced until approximately 24 months after construction works start. It will therefore be critical to ensure that sufficient land is provided to enable construction of the tunnel works in this area to commence immediately thereafter. Any delay in completing tunnel works will have a direct impact upon completing at-grade roads above. If not removed during the formation of the reclamation platform these soft deposits will either be removed during the diaphragm wall construction or the general excavation for construction of the tunnel box. Reclamation methods which involve time consuming improvement of the undredged foundation materials or maintaining of surcharge loads are therefore much less favourable from a programme viewpoint than the fully dredged reclamation method given the fact that the soft seabed deposits will have to be removed in any event.

In the areas to the sides of the tunnel the practicality of ground improvement techniques which include surcharging is questionable due to the need to provide sufficient working space for diaphragm wall construction. Failure to remove long term settlements in the areas to the sides of the tunnel would lead to differential settlements in roads / utilities which cross the tunnel. This in turn would necessitate unacceptable maintenance works having to be undertaken for what is a high profile project. Without dredging to the sides of the tunnel, ground improvement of some form would be required. Recent examples in Hong Kong have shown that failure to implement such ground improvement measures adequately can adversely affect diaphragm walling works to be carried out afterwards. Where very weak, underconsolidated, marine clays were not detected prior to diaphragm walling at one site in Hong Kong, it was necessary to weld steel plates onto the reinforcement cage in order to prevent the clays squeezing in and displacing concrete. Where ground treatment to improve the strength of the clays prior to construction is found to be unsuccessful then a costly and time-consuming programme of trial diaphragm wall panels may need to be implemented; the design of such a programme of work is complex and demands additional ground investigation and comprehensive instrumentation and monitoring.

It is therefore recommended that full removal of soft seabed deposits should be implemented for the areas directly under and to the sides of the tunnel in the zones outside the Initial Reclamation Areas. The reasons for this recommendation are summarized below. These reasons are in addition to the fact that the majority of soft seabed deposits would be removed in any event during general tunnel excavation (refer to Figure B.9).

·         Full dredging would permit construction of the tunnel diaphragm walls at an early date after commencement of reclamation work;

·         The potential for differential settlements occurring in road / utilities crossing the tunnel would be reduced or eliminated. This is turn would minimise or remove totally the need for maintenance works to rectify problems associated with such settlements.

·         Full dredging would eliminate totally the risk of excavating contaminated muds either during diaphragm wall or general tunnel excavation works and associated difficulties with disposal of these materials.

·         Full dredging would simplify and improve the quality of diaphragm wall construction works as problems have been encountered on other projects where muds have been left in place.

·         Full dredging would remove the environmental and health/safety risks associated with organic gas releases as marine deposits are disturbed or removed during subsequent construction of the tunnel.

B.2.4   Hong Kong Station Extended Overrun Tunnel and Associated Ventilation Structures

It is currently envisaged by the MTRC that the Hong Kong Station Extended Overrun Tunnel will be constructed as a floating box on a dredged formation.

The current alignment for the Hong Kong Station Extended Overrun Tunnel (EOT) is presented in Figure B.10 and indicates that the tunnel will largely be constructed immediately adjacent to the existing seawall in the area currently occupied by the existing "Star" Ferry Piers and Queen’s Pier. Record drawings obtained from the Civil Engineering Department show that the existing seawall is founded on a dredged trench. A typical section for the existing seawall along with the position of the EOT superimposed is presented in Figure B.11. Given the fact that a part of the proposed tunnel will be located over the dredged trench and that the envisaged construction method for the tunnel is for a floating box, the MTRC have stipulated in their Draft Entrustment Agreement for Construction of the EOT that:

"Phase 3 Central Reclamation shall be formed by Government using the fully dredged method. All existing material with CPT cone resistance of less than 1.2mPa shall be removed and replaced with marine sand fill up to formation level. The marine sand fill shall be compacted by vibrocompaction to achieve a CPT cone resistance of at least 10mPa.

Ground improvement measures such as groundwater drawdown shall be applied to minimise the total settlement to less than 75mm over 120 years and the differential settlement to less than 1:1000."

It should also be noted, as for the Central-Wan Chai Bypass Tunnel, that the current vertical alignment for the EOT will require virtually all soft seabed deposits along its alignment to be removed during tunnel construction if they are not removed during the reclamation platform construction. This is illustrated in Figure B.12 which indicates the vertical alignment for the EOT.

B.2.5   Extensions to Stormwater Drainage Culverts F, J and K

The current routings for the extensions to stormwater drainage culverts F, J and K are shown on Figure B.13. The figure indicates that the extensions to culverts J and K are located in the Initial Reclamation Area East and on the permanent seawall respectively. The reclamation method for these areas was discussed in detail in paragraph B.2.2 above.

The extension to culvert F crosses both the Hong Kong Station Extended Overrun Tunnel and the Central and Wan Chai Bypass Tunnel before crossing the Initial Reclamation Area West and discharging into Victoria Harbour.

As the reclamation method recommended for the Initial Reclamation Area West and the areas under and to the side of the tunnels (refer to paragraphs B.2.2 - B. 2.4) involves total removal of soft seabed deposits, a similar approach needs to be adopted for the entire culvert extension in order to avoid adverse differential settlements along the culvert alignment.

B.2.6                     Summary

The major infrastructure works which will be constructed on the CRIII reclamation platform include :

·         Central Wan Chai Bypass Tunnel;

·         Hong Kong Station Extended Overrun Tunnel;

·         Stormwater Culvert Extensions.

The consideration of foundation requirements for these works along with the seawalls and cooling water pumping stations, which form an integral part of the seawall, presented in this chapter has resulted in the recommendation that all soft seabed deposits below them should be removed. The extent of soft seabed deposits requiring removal to comply with this recommendation is presented in Figure B.14.

Figure B.14 indicates that two areas to the north and east of the existing "Star" Ferry Piers could be reclaimed in a manner such that the soft seabed deposits could be retained in place. It should be noted, however, that at-grade roads and associated utilities will be located within these areas (refer to Figure B.14) and in certain instances will extend into the adjacent areas where it is recommended that the soft seabed deposits be removed to satisfy foundation requirements of major infrastructure works. Figure B.15 provides a typical cross section for this area. It illustrates that the soft seabed deposits in this area which could be retained are located in two thin strips which makes their retention difficult from a practical construction perspective.

Table B.10 indicates the quantities of soft seabed deposits which would be removed for the areas shown on Figure B.14 and the quantities which could possibly be retained in the areas to the north and east of the existing "Star" Ferry Piers.

Table B.10 Estimated Quantity of Soft Seabed Deposits to be removed for Infrastructure Works Detailed on Figure B.10

Area

Quantity of Soft Seabed Deposits to be removed (m3)

Initial Reclamation Area West

55,850

Initial Reclamation Area East

202,000

Other Permanent Seawalls

106,650

Remaining CWB Areas

87,500

Remaining EOT Areas

39,000

Remaining Culvert Extension Areas

10,000

Quantities in Areas to North and East of Existing "Star" Ferry Piers = 79,000m3

An assessment of the effects which retaining the soft seabed deposits in the areas to the north and east of the "Star" Ferry Piers would have on the construction of the CRIII works and the long term impacts of leaving them in place is presented in section B.3 below.

B.3                     Assessment of impacts of Retaining Soft Seabed Deposits in Areas to North and East of Existing "Star" Ferry Piers

B.3.1                  Ground Conditions

An assessment has been undertaken of the settlements predicted to occur if soft seabed deposits (comprising marine deposits) are retained in the two areas to the north and east of the existing "Star" ferry piers (refer also to Figures B.14 and B.15)

For the purposes of the assessment, a typical geological section has been considered comprising of 3.5m of marine deposits. This section has been based on the results of all available ground investigation data. It should be noted, however, that due to the poor coverage of data in the area immediately adjacent to the "Star" ferry piers there is a risk that the thickness of insitu marine deposits could potentially be greater than the thickness (3.5m) assumed for the assessment. Therefore the resulting settlements associated with the reclamation in this area could be greater than those computed and presented in this chapter.

Further ground investigation in this area is not possible due to the continuing operation of ferry services from the "Star " ferry piers.

B.3.2                  Settlement Predictions

In the assessment, both the primary settlement and secondary compression associated with the insitu marine deposits have been assessed. In addition the creep settlement associated with the placed fill has also been considered. For the purposes of the assessment it has been assumed that the fill will be marine sand fill as recommended in the Comprehensive Feasibility Study for Minimum Option. Five basic reclamation construction scenarios have been considered as detailed below:

Case 1:            Untreated marine deposits;

Case 2:            Vertical prefabricated band drains within the marine deposits (1.5m centres);

Case 3: Vertical prefabricated band drains with 20kPa (1m) surcharge for 4, 8 and 12 months;

Case 4: Vertical prefabricated band drains with 80kPa (4m) surcharge for 4, 8 and 12 months; and

Case 5:                        Vertical prefabricated band drains with 180kPa (8m) surcharge for 4, 8 and 12 months.

For the reclamation fill, if untreated, the secondary creep settlement has been assessed to be of the order of 297mm over a 50 year period. This element of the settlement will occur throughout the reclamation area and will be dependent on the thickness of the placed fill given that similar placement techniques are utilised. It should be noted, however, that the settlement magnitude can be substantially reduced or eliminated using vibrocompaction techniques. An remaining settlement after vibrocompaction will tend to occur quickly with long term settlement being minimal in magnitude.

The predicted primary and secondary settlements of the marine deposits associated with the five basic reclamation construction scenarios are presented on Figure B.16 (for the purposes of the assessment one way drainage of the insitu marine deposits was assumed). Table B.11 summarises the magnitudes of the primary consolidation and secondary compression for the five reclamation construction scenarios. It also indicates the time period required for completion of the primary consolidation after completion of fill placement or removal of surcharge.

Reclamation Construction Scenario

Magnitude of Primary Consolidation (mm)

Time for completion of Primary Consolidation (months)

Magnitude of Additional Secondary Compression over a 50 year period (mm)

Case 1: Untreated Marine Deposits

1164

83

60

Case 2: Vertical prefabricated band drains

1164

21

60

Case 3: Vertical prefabricated band drains and 1m Surcharge

1164

19

105

Case 4: Vertical prefabricated band drains and 4m Surcharge

1164

9

128

Case 5: Vertical prefabricated band drains and 8m Surcharge

1164

6

140

Table B.11 Summary of Settlement Assessment Results

B.3.3                  Settlement Assessment

It can be seen from the settlement predictions presented in para. B.3.2 above that a significant magnitude of settlement will take place within the marine deposits in areas where the soft seabed deposits are retained below the reclamation. As the assessment has been based on an average thickness of marine deposits it should be noted that the primary settlements associated with the consolidation of the marine deposits could be significantly higher where the thickness of the marine deposits are greater. Given the scarcity of site investigation data in the area around the "Star" Ferry piers, the risk of greater settlements is considered high. In addition the settlements will vary as a function of the variability of the marine deposit thickness and will not be of a uniform value as indicated in the table. Indeed settlements across these areas of the reclamation could be highly variable over short distances especially adjacent to the edges of tunnels (refer to Figure B.15) causing potentially damaging absolute and differential settlement problems within the reclamation.

It can seen from the results presented that the use of vertical prefabricated band drains can significantly enhance the settlement rates. The improvements will, however, vary within the reclamation and depend upon the thickness of the insitu marine deposits. Table B.11 also indicates that surcharging will accelerate the settlement rates within the marine deposits. As for the vertical prefabricated band drains, the actual improvements will depend on the thickness of the marine deposits.

If ground improvement techniques are used significant instrumentation and monitoring would be required to control the duration of surcharge loading as part of an observation approach which is commonly adopted in such reclamations. Such monitoring of reclamation settlements is essential to confirm assumptions made in the settlement predictions as regards the magnitude and extent of the settlement and the ongoing settlement rates, all of which could have significant implications to the long-term performance of the reclamation platform. This instrumentation needs to be carefully protected from damage and therefore effectively precludes any other construction activities being undertaken in the vicinity.

From the primary and secondary settlement values predicted for the soft seabed deposits it can be seen that differential settlements will be present at the junction between the dredged and undredged areas of the reclamation particularly at the tunnel interfaces (refer to Figure B.15). These are more significant in the short term, depending on ground improvement techniques adopted but will also be problematic in the long term considering the secondary compression settlements which are predicted in the marine deposits over a 50 year period. These differential settlements will be of particular concern with respect to at-grade roads, utilities, and ground bearing structures located at the junction between the dredged and undredged zones of the reclamation (refer also to Section B.2)

B.3.4                     Impacts of Reclamation Construction Scenarios on CRIII Construction Programme

B.3.4.1                  Introduction

The information contained in this section was applicable in late 2000 when the review of reclamation methodology was carried out. Whilst the construction programme start date for CRIII has been delayed to August 2002 with related delays to the completion of key infrastructure works wihtin the reclamation, the principles contained in this paragrah are still appropariate.

The CRIII construction programme prepared for the CRIII Comprehensive Feasibility Study for Minimum Option was developed to suit the key dates for the following infrastructure works:

·         The Hong Kong Station Extended Overrun Tunnel;

·         At-Grade Highways; and

·         Provision of land for modification works to the advance tunnel section of the Central Wan Chai Bypass (CWB) located below Man Yiu Street.

The Hong Kong Station Extended Overrun Tunnel structural works will need to be completed by December 2005 (as specified by the MTRC in the draft entrustment agreement for construction of the works).

The at-grade roads within the CRIII area need to be completed by April 2006 in order to relieve congestion within the busy Central Business District. An earlier proposal from Transport Bureau to construct a temporary 4-lane 2way trunk road on the CRIII reclamation connecting Road P2 on CRI and Road D8 on CRII was abandoned on the premise that the CRIII at-grade new permanent road network would be available for use by early 2006.

The reclamation at the western side of CRIII needs to be completed by early 2006 to permit construction of upgrading of the CWB under Man Yiu Street (to suit the change from dual-2 to dual-3 configuration).

The two areas of reclamation situated to the north and east of the existing "Star" Ferry piers are reclaimed as part of the Final Reclamation Area West (FRAW). In accordance with the construction programme the reclamation of this area is programmed to begin in April 2004 and to be completed at the end of 2004 to permit infrastructure works on the reclamation platform to commence. The major infrastructure works to be constructed in the FRAW include:

·         Cooling Water Systems for future development programmed to commence in May 2004;

·         Stormwater Drainage Culvert Extension construction programmed to commence in August 2004;

·         Hong Kong Station Extended Overrun Tunnel (EOT) works programmed to commence in October 2004.

·         Advance Trunk Road Tunnel (ATRT) works for the Central Wan Chai Bypass (CWB) programmed to commence in October 2004;

An extract from the construction programme for the works in the FRAW area is attached as Figure B.17 for reference.

B.3.4.2               Impacts of Reclamation Construction Scenarios on CRIII Construction Programme

Impacts on the CRIII construction programme have been assessed for the following three basic reclamation scenarios for the areas to the north and east of the existing "Star" Ferry piers:

·         Full Removal of soft marine deposits;

·         No removal of soft marine deposits but installation of vertical prefabricated band drains; and

·         No removal of soft marine deposits but installation of vertical prefabricated band drains and placement of surcharge mounds.

The CRIII construction programme is based upon the full removal of soft marine deposits.

In the second reclamation scenario, the time required for the installation of vertical prefabricated band drains would be offset by not having to spend time removing the soft marine deposits. After completion of installation of the vertical prefabricated band drains, no further impacts would result to the construction programme as follow on infrastructure works would be under construction while settlement of the soft marine deposits was ongoing. Table B.11, however, indicates that not all primary consolidation of the soft marine deposits would be completed prior to construction of at-grade roads and utilities in the areas to the north and east of the existing "Star" Ferry piers. Thus the construction of these works would have to be delayed until at least the primary consolidation was completed.

For the third reclamation scenario a layer of surcharge has to be placed on the reclamation platform. It is anticipated that at least 2 months would be required to place the surcharge layer and to remove it on completion of primary consolidation. As follow on infrastructure works in the areas of surcharging could not commence until the surcharge had been removed, this will have an adverse impact on the construction programme. Delays to the programme will comprise of both the time required to place and remove the surcharge material and the time period for which the surcharge has to be left in place. Depending on the height of surcharge placed, the delays to the programe would be in the order of 8-12 months. These delays could not be recovered in follow on infrastructure works (which are already programmed to a tight programme) and therefore the key dates as stated in para. B.3.4.1 would be delayed by 8-12 months.

B.3.5                     Summary

Two basic options have been considered for the areas of reclamation to the north and east of the existing "Star" Ferry piers. For the first option all the soft seabed deposits are removed prior to placing the reclamation fill. For the second option the soft seabed deposits are retained and the reclamation fill is placed on top of these deposits.

For the option where all the soft seabed deposits are removed there will be no settlements related to the soft seabed deposits. This option is therefore considered to be the "safest" option in terms of providing a stable platform on which to place the reclamation fill and construct later infrastructure works.

For the option where the soft seabed deposits are retained settlement predictions have been undertaken to assess the levels of settlement which can be anticipated from placing the fill on top of these deposits. The results of these assessments have shown that significant levels of primary and secondary compression are likely to occur within the soft seabed deposits both during and after the placement of the reclamation fill. In addition it is also evident that in the absence of some form of ground treatment these settlements are likely to occur over a significant period of time, up to 83 months for primary consolidation. This will result in significant impacts to the construction programme for infrastructure, structures and utilities overlaying the completed reclamation.

In the area to the north and east of the "Star" Ferry piers, the average thickness of soft seabed deposits is 3.5m. For this thickness of soft seabed deposits, primary settlements of the order of 1164mm are predicted with 95% occurring over the first 83 months after placement of the reclamation fill. In order to enhance the rate of primary settlement within the soft seabed deposits vertical prefabricated band drains can be installed to reduce the drainage paths and increase the rate at which primary settlements occur. The rate of settlement can also be further enhanced by the use of surcharging. The assessment results indicate that the use of vertical prefabricated band drains can have significant benefits to the rate of primary settlement with 95% of the primary consolidation occurring within 21 months of placing the reclamation fill. Surcharging was found to provide further enhancements to the primary settlement rate.

An assessment of the impacts of the ground improvement proposals on the construction programme has also been conducted. This assessment showed that the use of vertical prefabricated band drains only would have no direct impact on the continuation of construction works but would require construction of roads and services in the vicinity to be delayed by 3-6 months (as only 18 months are available within the CRIII programme after completion of the filling in FRAW). The use of vertical prefabricated band drains and surcharge on the other hand would delay completion of key infrastructure works by 8-12 months. It should be noted that the procedures required for the installation of prefabricated band drains are complicated containing potential for errors which would adversely affect drain performance and settlement times. The method for drain installation also requires great care to avoid disturbing the soft seabed deposits both during installation of the drains and the subsequent placement of the lower layers of reclamation fill. Finally as the settlement predictions are based upon effective drain installation, any deviations from predicted performances, which would only be obvious after reclamation platform completion, would result in programme difficulties as rectification works would have to be undertaken or later works delayed until the required settlements had been completed.

Considering the analysis undertaken, it is recommended that all the soft seabed deposits should be removed in the areas to the north and east of the existing "Star" Ferry piers. This recommendation is made for the following resources:

·         The practical difficulties in retaining the soft seabeds in place due to the sectional shape of deposits to be retained (refer to Figure B.15); and

·         The adverse impacts and/or risks associated with ground treatments which need to be employed if the soft seabed deposits are retained are:

o        Surcharging if employed, would extend the construction programme by 8 -12 months - these delays would need to be accepted by Government and the MTRC.

o        Vertical prefabricated band drain installation is known to be risky and any errors in the installation would adversely affect the construction programme. It would also delay the completion of roads and services in the vicinity by 3-6 months. These delays would have to be accepted by Government.

B.4                     Proposed Dredging Plan for CRIII project

Based upon the recommendations contained in Sections B.2 and B.3 of this review paper, a proposed dredging plan for the CRIII project has been prepared and included as Figure B.18. The quantity of material to be dredged has been calculated to be 580,000m3 based upon currently available seabed level data and geotechnical field and laboratory text results. Using the information contained in the Sediment Quality Report for the CRIII Full Reclamation prepared in 1995/96, it has been assessed that the quantities of contaminated and non-contaminated material which would have to be dredged is as follows:

            Contaminated Material to be Dredged:       375,000m3

            Non-Contaminated Material to be Dredged:           205,000m3

Appendix F2

Mitigated Scenario

The quiet PMEs used for the mitigated scenario assessment are listed below. The sound power levels used for these PMEs in the unmitigated scenarios are also included for reference.

TM

 

TM

BS5228

BS5228

CNP Ref

Description

SWL, dB(A)

Ref.

SWL, dB(A)

CNP002

Air compressor

102

Table C7/16

96

CNP004

Paver

109

Table C8/24

101

CNP026

Hand-held breaker

114

Tabel C2/10

110

CNP027

Breaker, excavator mounted

122

Table C8/13

110

CNP030

Bulldozer

115

Table C3/27

109

CNP044

Concrete lorry mixer

109

Table C6/35

100

CNP047

Concrete pump

109

Table C6/36

106

CNP048

Crane

112

Table C7/114

101

CNP067

Dump truck

117

Table C9/27

105

CNP081

Excavator/loader

112

Table C3/97

105

CNP104

Grader

113

Table C9/11

110

CNP141

Lorry

112

Table C9/27

105

CNP170

Poker

113

Table C6/32

100

CNP185

Road roller

108

Table C8/27

104

CNP186

Vibratory roller

108

Table C3/116

106

Appendix H

Detailed Calculations and Results of Cumulative Construction Noise Impacts during Restricted Working Hours

Noise Receiver References

The noise receiver references used for the presentation of results in this Appendix relate to the buildings detailed below:

Receiver Reference used in this Appendix

Receiver Location

6

Mandarin Oriental Hotel

 

APPENDIX O : HYDRAULIC AND WATER QUALITY MODELLING FIGURES

Introduction

The Hydraulic and Water Quality Results are presented in figure and tabular format as described below

Figures            Contour plots of individual water quality parameters are included for three modelled scenarios – baseline, intermediate (construction) and operation. Baseline and operation plots are presented for both wet and dry seasons (spring and neap tides) whereas intermediate scenario plots are presented for wet season (spring and neap tides) only. Plots are also provided for surface flow pattern, maximum speeds and excess temperature.

            The extent of the plots was selected to provide detailed information close to the project site. Information provided on the plots indicates that at the eastern and western limits, conditions are virtually identical for all three modelled scenarios. Variations beyond the plot boundaries cannot therefore be attributed to the CRIII project works.

Tables Actual values of water quality parameters at 25 sensitive receivers within Hong Kong Waters (refer also to chapter 2 of Volume 1 of the report) are presented for the three modelled scenarios – baseline, intermediate (construction) and operation. Baseline and operation results are presented for wet and dry seasons (spring and neap tides). Intermediate (construction) results are presented for wet season (spring and neap tides) only. The results are presented in a format such that they can be compared directly with WQOs as defined in Chapter 3 of Volume 1 of the report and reproduced in this Appendix. Where a modelled result exceeds a WQO it is identified by shading in the tables.

FIGURES LIST

Figure No.

Title

Figure 1.1

Central Reclamation Phase III Baseline model mesh near Central

Figure 1.2a

Baseline Layout, surface flow patterns, wet season spring tide

Figure 1.2b

Baseline Layout, surface flow patterns, wet season neap tide

Figure 1.3a

Baseline Layout, maximum speeds, wet season spring tide

Figure 1.3b

Baseline Layout, maximum speeds, wet season neap tide

Figure 1.4a

Baseline Layout, surface flow patterns, dry reason spring tide

Figure 1.4b

Baseline Layout, surface flow patterns, dry reason neap tide

Figure 1.5a

Baseline Layout, maximum speeds, dry reason spring tide

Figure 1.5b

Baseline Layout, maximum speeds, dry reason neap tide

Figure 1.6a

Baseline Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide

Figure 1.6b

Baseline Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide

Figure 1.6c

Baseline Layout, tide-and depth-averaged dissolved oxygen concentrations, wet season

Figure 1.7a

Baseline Layout, tide-averaged total BOD5 concentrations, wet season spring tide

Figure 1.7b

Baseline Layout, tide-averaged total BOD5 concentrations, wet season neap tide

Figure 1.8a

Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season spring tide

Figure 1.8b

Baseline Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season neap tide

Figure 1.8c

Baseline Layout, tide-and depth-averaged unionised ammoniacal nitrogen concentrations, wet season

Figure 1.8d

Baseline Layout, tide-averaged total inorganic nitrogen concentrations, wet season spring tide

Figure 1.8e

Baseline Layout, tide-averaged total inorganic nitrogen concentrations, wet season neap tide

Figure 1.8f

Baseline Layout, tide-and depth-averaged total inorganic nitrogen concentrations, wet season

Figure 1.9a

Baseline Layout, tide-averaged E. coli concentrations, wet season spring tide

Figure 1.9b

Baseline Layout, tide-averaged E.coli concentrations, wet season neap tide

Figure 1.10a

Baseline Layout, tide-averaged dissolved oxygen concentrations, dry season spring tide

Figure 1.10b

Baseline Layout, tide-averaged dissolved oxygen concentrations, dry season neap tide

Figure 1.10c

Baseline Layout, tide-and depth-averaged dissolved oxygen concentrations, dry season

Figure 1.11a

Baseline Layout, tide-averaged total BOD5 concentrations, dry season spring tide

Figure 1.11b

Baseline Layout, tide-averaged total BOD5 concentrations, dry season neap tide

Figure 1.12a

Baseline Layout, tide- averaged unionised ammoniacal nitrogen concentrations, dry season spring tide

Figure 1.12b

Baseline Layout, tide- averaged unionised ammoniacal nitrogen concentrations, dry season neap tide

Figure 1.12c

Baseline Layout, tide-and depth-averaged unionised ammoniacal nitrogen concentrations, dry season

Figure 1.12d

Baseline Layout, tide-averaged total inorganic nitrogen concentrations, dry season spring tide

Figure 1.12e

Baseline Layout, tide-averaged total inorganic nitrogen concentrations, dry season neap tide

Figure 1.12f

Baseline Layout, die-and depth-averaged total inorganic nitrogen concentrations, dry season

Figure 1.13a

Baseline Layout, tide-averaged E.coli concentrations, dry season spring tide

Figure 1.13b

Baseline Layout, tide-averaged E.coli concentrations, dry season neap tide

Figure 2.1

Central Reclamation Phase III construction phase model mesh near Central

Figure 2.2a

Intermediate Layout, surface flow patterns, wet season spring tide

Figure 2.2b

Intermediate Layout, surface flow patterns, wet season neap tide

Figure 2.3a

Intermediate Layout, maximum speeds, wet season spring tide

Figure 2.3b

Intermediate Layout, maximum speeds, wet season neap tide

Figure 2.4a

Intermediate Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide

Figure 2.4b

Intermediate Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide

Figure 2.5a

Intermediate Layout, tide-averaged total BOD5 concentrations, wet season spring tide

Figure 2.5b

Intermediate Layout, tide-averaged total BOD5 concentrations, wet season neap tide

Figure 2.6a

Intermediate Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season spring tide

Figure 2.6b

Intermediate Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season neap tide

Figure 2.6c

Intermediate Layout, tide-and depth-averaged unionised ammoniacal nitrogen concentrations, wet season

Figure 2.6d

Intermediate Layout, tide-averaged total inorganic nitrogen concentrations, wet season spring tide

Figure 2.6e

Intermediate Layout, tide-averaged total inorganic nitrogen concentrations, wet season neap tide

Figure 2.6f

Intermediate Layout, tide-and depth-averaged total inorganic nitrogen concentrations, wet season

Figure 2.7a

Intermediate Layout, tide-averaged E.coli concentrations, wet season spring tide

Figure 2.7b

Intermediate Layout, tide-averaged E.coli concentrations, wet season neap tide

Figure 2.8

Not used.

Figure 2.9a

Intermediate Layout, simulation of floating debris, wet season neap tide, LW release

Figure 2.9b

Intermediate Layout, simulation of floating debris, wet season neap tide, HW release

Figure 3.1

Central Reclamation Phase III operational phase model mesh near Central

Figure 3.2a

Final Layout, surface flow patterns, wet season spring tide

Figure 3.2b

Final Layout, surface flow patterns, wet season neap tide

Figure 3.3a

Final Layout, maximum speeds, wet season spring tide

Figure 3.3b

Final Layout, maximum speeds, wet season neap tide

Figure 3.4a

Final Layout, surface flow patterns, dry season spring tide

Figure 3.4b

Final Layout, surface flow patterns, dry season neap tide

Figure 3.5a

Final Layout, maximum speeds, dry season spring tide

Figure 3.5b

Final Layout, maximum speeds, dry season neap tide

Figure 3.6a

Final Layout, tide-averaged dissolved oxygen concentrations, wet season spring tide

Figure 3.6b

Final Layout, tide-averaged dissolved oxygen concentrations, wet season neap tide

Figure 3.6c

Final Layout, tide-and depth-averaged dissolved oxygen concentrations, wet season

Figure 3.7a

Final Layout, tide-averaged total BOD5 concentrations, wet season spring tide

Figure 3.7b

Final Layout, tide-averaged total BOD5 concentrations, wet season neap tide

Figure 3.8a

Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season spring tide

Figure 3.8b

Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations, wet season neap tide

Figure 3.8c

Final Layout, tide-and depth-averaged unionised ammoniacal nitrogen concentrations, wet season

Figure 3.8d

Final Layout, tide-averaged total inorganic nitrogen concentrations, wet season spring tide

Figure 3.8e

Final Layout, tide-averaged total inorganic nitrogen concentrations, wet season neap tide

Figure 3.8f

Final Layout, tide-and depth-averaged total inorganic nitrogen concentrations, wet season

Figure 3.9a

Final Layout, tide-averaged E.coli concentrations, wet season spring tide

Figure 3.9b

Final Layout, tide-averaged E.coli concentrations, wet season neap tide

Figure 3.10a

Final Layout, tide-averaged dissolved oxygen concentrations, dry season spring tide

Figure 3.10b

Final Layout, tide-averaged dissolved oxygen concentrations, dry season neap tide

Figure 3.10c

Final Layout, tide-and depth-averaged dissolved oxygen concentrations, dry season

Figure 3.11a

Final Layout, tide-averaged total BOD5 concentrations, dry season spring tide

Figure 3.11b

Final Layout, tide-averaged total BOD5 concentrations, dry season neap tide

Figure 3.12a

Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations, dry season spring tide

Figure 3.12b

Final Layout, tide-averaged unionised ammoniacal nitrogen concentrations dry season neap tide

Figure 3.12c

Final Layout, tide-and depth-averaged unionised ammoniacal nitrogen concentrations, dry season

Figure 3.12d

Final Layout, tide-averaged total inorganic nitrogen concentrations, dry season spring tide

Figure 3.12e

Final Layout, tide-averaged total inorganic nitrogen concentrations, dry season neap tide

Figure 3.12f

Final Layout, tide-and depth-averaged total inorganic nitrogen concentrations, dry season

Figure 3.13a

Final Layout, tide-averaged E.coli concentrations, dry season spring tide

Figure 3.13b

Final Layout, tide-averaged E.coli concentrations, dry season neap tide

Figure 3.14

Not used.

Figure 3.15

Not used.

Figure 3.16a

Final Layout, simulation of floating debris, wet season neap tide, LW release

Figure 3.16b

Final Layout, simulation of floating debris, wet season neap tide, HW release

Figure 3.17a

Final Layout, simulation of floating debris, dry season neap tide, LW release

Figure 3.17b

Final Layout, simulation of floating debris, dry season neap tide, HW release

Figure 4.1

Residual Seasonal Water Flows in the Hong Kong Region

 

 

 

Tables LIST

Table No.

Title

Table 1

Dissolved Oxygen at Sensitive Receivers

Table 2

Total BOD5 at Sensitive Receivers

Table 3

Unionised Ammonical Nitogen at Sensitive Receivers

Table 4

Total Oxidised Nitrogen at Sensitive Receivers

Table 5

Total Kjeldahl Nitrogen at Sensitive Receivers

Table 6

Total Inorganic Nitrogen at Sensitive Receivers

Table 7

Phosphate at Sensitive Receivers

Table 8

Suspended Solids at Sensitive Receivers

Table 9

E.Coli at Sensitive Receivers

 

 

 

 

Table O.1 : Water Quality Objectives (WQOs) (All Phases) for Victoria Harbour

Water Quality Objective

Part or Parts of Zone

A.         AESTHETIC APPEARANCE

 

There should be no objectionable odours of discolouration of the water.

Whole zone

Tarry residues, floating wood, articles made of glass, plastic, rubber or of any other substances should be absent.

Whole zone

Mineral oil should not be visible on the surface. Surfactants should not give rise to a lasting foam.

Whole zone

There should be no recognisable sewage-derived debris.

Whole zone

Floating, submerged and semi-submerged objects of a size likely to interfere with the free movement of vessels, or cause damage to vessels, should be absent.

Whole zone

The water should not contain substances which settle to form objectionable deposits.

Whole zone

B.         BACTERIA

 

The level of Escherichia coli should not exceed 1 000 per 100 mL, calculated as the geometric mean of the most recent 5 consecutive samples taken at intervals of between 7 and 21 days.

Inland waters

C.         COLOUR

 

Human activity should not cause the colour of water to exceed 50 Hazen units.

Inland waters

D.         DISSOLVED OXYGEN

 

a)          The level of dissolved oxygen should not fall below 4 mg per litre for 90% of the sampling occasions during the whole year; values should be calculated as the annual water column average (see Note). In addition, the concentration of dissolved oxygen should not be less than 2 mg per litre within 2 m of the seabed for 90% of the sampling occasions during the whole year.

b)         The level of dissolved oxygen should not be less than 4 mg per litre.

Marine waters

 

 

 

Inland waters

E.          pH

 

a)          The pH of the water should be within the range of 6.5-8.5 units. In addition, human activity should not cause the natural pH range to be extended by more than 0.2 unit.

Marine waters

b)         Human activity should not cause the pH of the water to exceed the range of 6.0-9.0 units.

Inland waters

F.          TEMPERATURE

 

Human activity should not cause the daily temperature range to change by more than 2.0 oC.

Whole zone

G.         SALINITY

 

Human activity should not cause the salinity level to change by more than 10%.

Whole zone

 

Table O.1 : Water Quality Objectives (WQOs) (All Phases) for Victoria Harbour (Cont’d)

Water Quality Objective

Part or Parts of Zone

H.         SUSPENDED SOLIDS

 

a)          Human activity should neither cause the suspended solids concentration to be raised more than 30% nor give rise to accumulation of suspended solids which may adversely affect aquatic communities.

Marine waters

b)         Human activity should not cause the annual median of suspended solids to exceed 25 mg per litre.

Inland waters

I.          AMMONIA

 

The un-ionized ammoniacal nitrogen level should not be more than 0.021 mg per litre, calculated as the annual average (arithmetic mean).

Whole zone

J.          NUTRIENTS

 

a)          Nutrients should not be present in quantities sufficient to cause excessive or nuisance growth of algae or other aquatic plants.

Marine waters

b)         Without limiting the generally of objective (a) above, the level of inorganic nitrogen should not exceed 0.4 mg per litre, expressed as annual water column average (see Note).

Marine waters

K.         5-DAY BIOCHEMICAL OXYGEN DEMAND

 

The 5-day biochemical oxygen demand should exceed 5 mg per litre.

Inland waters

L.          CHEMICAL OXYGEN DEMAND

 

The chemical oxygen demand should not exceed 30 mg per litre.

Inland waters

M.        TOXIC SUBSTANCES

 

a)          Toxic substances in the water should not attain such levels as to produce significant toxic, carcinogenic, mutagenic or teratogenic effects in humans, fish or any other aquatic organisms, with due regard to biologically cumulative effects in food chains and to interactions of toxic substances with each other.

Whole zone

b)         Human activity should not cause a risk to any beneficial use of the aquatic environment.

Whole zone

Note:    Expressed normally as the arithmetic mean of at least 3 measurements at 1 m below surface, mid depth and 1 m above the seabed. However in water of a depth of 5 m or less the mean shall be that of 2 measurements (1m below surface and 1m above seabed), and in water of less than 3 m the 1 m below surface sample only shall apply.

 

 

Appendix P

Information Abstracted from Previous Sediment Quality Study Report for the Project Site as applicable to the CRIII Minimum Option Layout

P.1         Introduction

The information presented in this Appendix was obtained from previous Sediment Sampling and Testing Survey Works conducted for the project site in 1995/1996 and from ongoing Sediment Sampling and Testing Survey Works being conducted to satisfy the requirements of the recently issued WBTC NO. 3/2000. The information presented is as follows:

Figure P1        Location of Vibrocore Sample Stations Applicable to the CRIII Minimum Option Layout (both sampling work conducted in 1995/1996 and 2000).

Table P.1        Vibrocore Reference and Types of Tests Conducted in 1995/1996 (Sediment Classification Tests in accordance with WBTC 3/2000 were conducted on seabed samples taken from all locations listed in Table P.1 during the testing works in 2000).

Table P.2        Test Type 1 Results and Sediment Classification for Tests Conducted in 1995/1996.

Table P.3        Test Type 2 Results for Tests Conducted in 1995/1996. (Results of Cu, Zn, TBT, PAH and PCB concentration in the Dry Sediment from seabed samples collected in 2000 are included as a footnote to this table).

Table P.4        Test Type 3 Results for Tests Conducted in 1995/1996

Where appropriate, assessment criteria for the various contaminants within the sediment and elutriate have been provided with the tables for information. The discussion on the tests results is provided in Chapter 10 of this EIA Report.

Table P. 1 Vibrocore Reference and Types of Tests Applied Conducted in 1995/1996

Vibrocore Reference

Testing Applicable

VB1

Test types 1 and 2

VB2

Test types 1 and 3

VB11

Test types 1 and 3

VB13

Test type 1

VB15

Test type 1

VB16

Test types 1 and 2

VB17

Test type 1

VB20

Test types 1 and 2

VB21

Test types 1 and 3

VB23

Test types 1 and 3

VB24

Test type 1

VB27

Test types 1 and 3

VB31

Test types 1

VB32

Test types 1 and 3

VB37

Test types 1 and 3

Test Type 1 comprised of :

·         Analysis for Chromium (Cr), Cadmium (Cd), Copper(Cu), Mercury(Hg), Nickel(Ni), Zinc(Zn) and Lead (Pb);

·         Analysis for Dry Weight;

·         Analysis for Total Organic Carbon Content(TOC);

·         Analysis for Chemical Oxygen Demand(COD);

·         Analysis for Electrical Potential and Conductivity

Test Type 2               comprised of elutriate tests

Test Type 3               comprised of pore water tests

Table P. 2 : Test Type 1 Restults and Sediment Classification

for Tests Conducted in 1995/1996

Sampling

Sampling

Heavy Metal Parameter (mg/kg dry weight)

Classification in accordance with EPD Circular
1-1 92

Classification in accordance with WBTC 3/2000 (1)

Station

Depth (m)

Cd

Cr

Cu

Ni

Pb

Zn

Hg

 

0.00

0.40

44.10

239.00

15.10

40.40

156.00

0.22

C

H

VB1

0.90

0.05

20.60

8.40

12.20

30.10

34.80

<0.04

A

L

 

1.90

0.05

25.30

8.80

15.90

33.80

42.20

<0.04

A

L

 

2.90

0.03

12.10

5.30

6.80

25.80

53.00

<0.04

A

L

 

0.00

0.33

41.30

169.00

17.10

55.10

98.40

0.77

C

H

VB2

0.90

0.30

31.50

130.00

7.40

96.30

79.60

0.46

C

H

 

1.90

0.08

26.60

11.80

14.30

53.30

45.50

<0.04

A

L

 

2.90

0.05

23.50

8.30

15.40

34.50

42.30

<0.04

A

L

 

0.00

0.49

51.50

250.00

14.60

60.30

176.00

0.78

C

H

VB11

0.90

0.71

73.30

376.00

25.70

71.30

218.00

0.42

C

H

 

1.90

0.45

51.20

233.00

15.20

57.40

155.00

0.50

C

H

 

2.90

0.50

22.70

105.00

12.90

708.00

354.00

2.94

C

H

 

0.00

0.30

30.10

90.40

13.50

56.70

74.50

0.18

C

H

VB13

0.90

1.02

93.20

500.00

29.50

90.90

250.00

0.60

C

H

 

1.90

0.09

14.30

17.10

11.00

69.90

38.50

0.07

B

L

 

2.90

0.05

9.90

4.50

8.20

14.80

21.60

<0.04

A

L

 

0.00

0.57

52.70

264.00

8.40

74.70

207.00

0.40

C

H

VB15

0.90

0.06

10.30

3.00

3.30

11.60

20.10

<0.04

A

L

 

1.90

0.10

18.10

5.60

11.50

13.30

36.10

<0.04

A

L

 

2.90

0.07

12.70

4.20

7.60

12.30

25.40

<0.04

A

L

 

0.00

0.19

22.40

59.60

7.50

47.70

55.10

0.07

B

L

VB16

0.90

0.35

55.90

145.00

17.60

240.00

224.00

0.59

C

H

VB17

0.00

0.74

64.30

333.00

26.20

78.60

214.00

0.30

C

H

 

0.00

1.03

110.00

398.00

37.50

150.00

375.00

1.10

C

H

VB20

0.90

0.89

109.00

335.00

35.70

141.00

357.00

1.10

C

H

 

1.90

0.13

30.90

20.00

21.80

25.50

69.10

0.07

A

L

 

2.90

0.07

11.90

5.40

6.70

13.30

23.80

<0.04

A

L

1.        The Classification has been conducted uisng heavy metal results available. Further sediment sampling and testing is in progress to determine all other contaminant levels required by WBTC 3/2000.

Table P. 2 : Test Type 1 Restults and Sediment Classification

for Tests Conducted in 1995/1996 (Cont'd)

Sampling

Sampling

Heavy Metal Parameter (mg/kg dry weight)

Classification in accordance with EPD Circular
1-1-92

Classification in accordance with WBTC 3/2000 (1)

Station

Depth (m)

Cd

Cr

Cu

Ni

Pb

Zn

Hg

 

0.00

0.10

15.90

5.80

9.90

13.60

31.10

<0.04

A

L

VB21

0.90

0.44

50.00

208.00

22.90

60.40

150.00

<0.3

C

H

 

1.90

0.25

29.70

89.20

13.30

32.90

93.90

0.49

C

H

 

2.90

0.09

19.80

11.70

13.00

16.80

39.60

<0.04

A

L

 

0.00

0.70

69.10

319.00

21.20

65.10

186.00

0.46

C

H

VB23

0.90

0.55

66.80

276.00

30.00

64.50

175.00

0.60

C

H

 

1.90

0.75

91.10

269.00

29.00

120.00

311.00

0.80

C

H

 

2.90

0.51

33.80

81.70

13.70

183.00

268.00

0.70

C

H

 

0.00

0.93

85.10

372.00

37.20

106.00

263.00

0.30

C

H

VB24

0.90

0.73

68.10

330.00

28.60

85.70

220.00

0.40

C

H

 

1.90

0.11

16.80

16.80

6.70

20.70

34.60

<0.1

A

L

 

0.00

0.63

69.80

302.00

30.20

83.70

209.00

0.60

C

H

VB27

0.90

0.15

23.10

27.70

13.10

9850.00

151.00

0.52

C

H

 

1.90

0.07

18.50

5.80

10.40

71.50

31.30

0.06

A

L

 

2.90

0.08

14.90

4.20

9.10

27.10

27.10

<0.04

A

L

 

0.00

0.59

67.90

294.00

29.40

65.60

188.00

0.20

C

H

VB31

0.90

1.26

120.00

501.00

34.90

129.00

370.00

0.90

C

H

 

1.90

0.79

95.20

275.00

29.30

141.00

311.00

0.97

C

H

 

0.00

0.47

44.10

198.00

15.20

85.10

228.00

14.10

C

H

VB32

0.90

0.09

25.90

17.10

16.00

20.70

55.20

0.45

A

L

 

1.90

0.12

18.20

9.50

16.10

23.20

44.80

0.20

A

L

 

2.90

0.09

18.70

7.30

13.30

18.70

39.00

0.09

A

L

 

0.00

1.00

87.80

390.00

29.30

144.00

390.00

1.20

C

H

VB37

0.90

1.16

88.20

378.00

30.20

149.00

428.00

1.30

C

H

 

1.90

1.03

108.00

422.00

35.10

105.00

375.00

1.10

C

H

 

2.90

0.57

64.80

176.00

20.20

128.00

304.00

0.80

C

H

 

5.90

0.04

12.30

9.40

8.40

13.20

27.60

0.04

A

L

1.        The Classification has been conducted uisng heavy metal results available. Further sediment sampling and testing is in progress to determine all other contaminant levels required by WBTC 3/2000.

 

Sampling Station

Sampling Depth (m)

Cond @25 uS/cm

Moisture %

Redox Pot
mV

TOC %

TIC
%

TC

%

COD mg/kg

 

0.00

4880.00

45.60

167.00

1.40

1.40

2.80

423.00

VB1

0.90

4000.00

36.80

147.00

1.20

0.70

1.90

79.00

 

1.90

4000.00

40.80

176.00

0.60

0.40

0.90

101.00

 

2.90

2760.00

22.60

138.00

0.20

<0.1

0.20

26.00

 

0.00

5320.00

49.20

103.00

2.40

1.30

3.60

413.00

VB2

0.90

5220.00

46.00

151.00

2.70

2.00

4.60

269.00

 

1.90

4120.00

36.20

150.00

1.30

0.20

1.60

102.00

 

2.90

3660.00

36.20

150.00

0.90

0.20

1.20

78.00

 

0.00

3290.00

32.00

154.00

1.00

0.20

1.20

346.00

VB11

0.90

4950.00

49.50

157.00

1.20

0.20

1.40

317.00

 

1.90

3610.00

35.50

89.00

0.90

0.20

1.10

295.00

 

2.90

3260.00

29.40

83.00

5.20

1.80

7.10

333.00

 

0.00

4490.00

43.60

132.00

0.90

1.60

2.50

496.00

VB13

0.90

5670.00

56.00

98.00

1.80

<0.2

1.90

636.00

 

1.90

3130.00

29.90

67.00

1.20

1.70

2.90

93.00

 

2.90

2870.00

25.90

96.00

1.30

1.20

2.50

135.00

 

0.00

5320.00

54.50

111.00

6.00

1.00

7.10

681.00

VB15

0.90

3320.00

30.20

91.00

2.40

2.60

5.00

100.00

 

1.90

4060.00

39.10

98.00

3.10

<0.1

3.10

82.00

 

2.90

3640.00

33.10

96.00

2.80

<0.1

2.80

75.00

 

0.00

3900.00

32.90

152.00

0.50

0.40

1.00

149.00

VB16

0.90

3620.00

37.40

122.00

2.70

0.80

3.70

224.00

VB17

0.00

6130.00

58.00

122.00

1.30

<0.2

1.40

333.00

 

0.00

5800.00

57.30

183.00

1.60

<0.2

1.80

679.00

VB20

0.90

5780.00

55.20

123.00

2.00

<0.2

2.20

491.00

 

1.90

4800.00

45.00

100.00

2.20

1.60

3.70

282.00

 

2.90

3780.00

32.90

84.00

0.90

3.20

4.00

201.00

 

0.00

5160.00

48.50

94.00

0.40

2.20

2.50

1020.00

VB21

0.90

5590.00

52.00

147.00

1.00

0.7

1.70

1180.00

 

1.90

3740.00

36.10

86.00

4.70

2.90

7.60

610.00

 

2.90

3660.00

34.40

152.00

1.30

2.20

3.40

617.00

 

0.00

5210.00

24.70

122.00

1.20

<0.1

1.30

770.00

VB23

0.90

5580.00

56.60

147.00

1.70

<0.2

1.70

1230.00

 

1.90

5250.00

51.70

131.00

1.60

<0.2

1.70

1160.00

 

2.90

3000.00

29.00

134.00

3.50

1.70

5.20

852.00

 

0.00

6050.00

62.40

100.00

2.00

<0.2

2.00

1840.00

VB24

0.90

3200.00

54.50

103.00

2.50

<0.2

2.50

1420.00

 

1.90

2780.00

53.70

100.00

9.10

<0.2

9.10

626.00

 

0.00

6040.00

57.00

135.00

1.30

1.00

2.30

942.00

VB27

0.90

4020.00

35.00

152.00

2.00

2.20

4.20

615.00

 

1.90

3200.00

29.80

88.00

0.40

1.60

1.90

499.00

 

2.90

3090.00

26.20

146.00

0.50

1.20

1.80

596.00

 

0.00

5680.00

55.80

118.00

1.20

<0.2

1.50

1220.00

VB31

0.90

5400.00

54.10

121.00

2.40

<0.2

2.50

915.00

 

1.90

5080.00

45.40

124.00

2.00

<0.1

2.10

769.00

 

0.00

4360.00

34.20

195.00

1.70

2.20

3.90

236.00

VB32

0.90

4940.00

42.00

142.00

0.30

2.90

3.20

181.00

 

1.90

4270.00

39.70

141.00

1.50

3.30

4.70

174.00

 

2.90

3990.00

35.90

143.00

0.30

2.10

2.40

179.00

 

0.00

6090.00

59.00

68.00

2.70

0.20

2.90

817.00

VB37

0.90

6480.00

60.30

68.00

2.50

<0.2

2.50

1030.00

 

1.90

5900.00

57.30

68.00

1.90

0.20

2.10

808.00

 

2.90

5170.00

50.60

178.00

1.50

<0.2

1.60

567.00

 

5.90

2580.00

27.50

127.00

0.80

1.10

1.90

90.00

 

 

 

 

 

Table P. 3 Test Type 2 Results for Tests Conducted in 1995/1996

Sampling Station

Sampling Depth (m)

Cd

ug/L

Cr

ug/L

Cu (3)

ug/L

Ni

ug/L

Pb

ug/L

Zn(3)

ug/L

Hg

ug/L

NH3-N

mg/L

Tributyl/Tin ug/L

VB2

0.0

<2

14

<10

<10

<10

<100

<0.2

11.8

<0.02

VB11

0.0

<2

<10

<10

<10

<10

<100

<0.2

15.9

<0.02

VB21

0.0

<2

<10

<10

<10

<10

<100

<0.2

15.2

<0.02

VB23

0.0

<2

<10

<10

<10

<10

<100

<0.2

17.1

<0.02

VB27

0.0

<2

<10

<10

<10

<10

<100

<0.2

8.2

<0.02

VB32

0.0

<2

<10

<10

<10

<10

<100

<0.2

2.3

<0.02

VB37

0.0

<2

<10

<10

<10

<10

<100

<0.2

30.1

<0.02

Water Quality Standard ug/L

2.5 (1)

15(1)

5(1)

30(1)

25(1)

40(1)

0.3(1)

Not Applicable

0.1(2)

1.        Environmental Quality Standards and Assessment Levels for Surface Waters (from HMIP(1994) Environmental and BPEO Assessment Principle for Integrated Pollution Control)

2.        Michael H. Salazar and Sandra M. Salazar (1996). "Mussels as Bioindicators: Effects of TBT on Survival, Bioaccumulation, and Growth under Natural Conditions" in Organotin, edited by M. A. Champ and P. F. Seligman. Chapman & Hall, London.

3.        Due to insufficient sample available for testing, the detection levels for Cu and Zn do not prove conclusively that contamination levels within the elutriate would be acceptable. Therefore an assessment of the leaching potential has been made using a partitioning coefficient approval utilising the sediment data below collected in Decmber 2000 from the CRIII site.

Contaminant

Contaminant Level (mg/kg dry weight)

Acceptance

 

VB2

VB11

VB21

VB23

VB27

VB32

VB37

Criteria (3)

Cu

243

215

251

212

237

226

221

390

Zn

272

297

303

305

312

289

360

410

TBT(in Interstitial Water)

<0.015

0.015

<0.015

<0.015

0.021

<0.015

0.024

0.15

  

Table P. 3 Type 2 Test Results for Tests Conducted in 1995/1996

Test Method

Analysis Description

Units

LOR

VB2 (0.0m)

VB4 (0.0m)

VB6 (0.0m)

VB8 (0.0m)

VB11 (0.0m)

VB21 (0.0m)

VB23 (0.0m)

VB27 (0.0m)

VB32 (0.0m)

VB37 (0.0m)

EP-075B-WS

POLYNUCLEAR (1) AROMATICS (PAHs)

 

 

 

 

 

 

 

 

 

 

 

 

 

Napthalene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

2-Methylnaphthalene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

2-Chloronaphthalene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Acenaphthylene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Acenapthene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Fluorene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Phenanthrene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Anthracene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Fluranthene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Pyrene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

N-2-Fluorenylacetamide

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Benz(a)anthracene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Chrysene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Benzo(b) & (k) fluoranthene

µg/L

2

<13

<8

<8

<8

<8

<8

<8

<8

<13

<8

 

7.12-Dimethylbenz(a) anthracene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Benzo(a)pyrene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

3-Methylcholanthrene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Indeno(1.2.3-cd)pyrene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Dibenz(a.h)anthracene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

 

Benzo (g.h.i)perylene

µg/L

2

<7

<4

<4

<4

<4

<4

<4

<4

<7

<4

EP-066-WS

TOTAL (1) POLYCHLORINATED BIPHENYLS (PCBs)

µg/L

1

<3

<2

<2

<2

<2

<2

<2

<2

<2

<2

(1)            Due to insufficient sample available for testing, the detection levels do not prove conclusively that contamination levels within the elutriate would be acceptable. Therefore an assessment of the leaching potential has been made using a partitioning coefficient approach utilising the sediment data below collected in December 2000 from the CRIII site.

Contaminant

Contaminant level (mg/kg dry weight)

Acceptance

 

VB2

VB11

VB21

VB23

VB27

VB32

VB37

Criteria (1)

Total LPAHs

143

85

81

183

125

84

121

5,200

Total HPAHs

676

480

571

1,500

699

451

658

12,000

Total PCBs

18

14

17

102

24

13

48

130

 

APPENDIX Q          Cumulative Water Quality Assess,emts fpr CRIII and WDII projects undertaken as part of the WDII EIA Study

Q1    Construction Phase Cumulative Assessment

Q.1.1           Introduction

Q.1.1.1        A construction phase cumulative assessment of the WDII, CRIII and Yau Tong projects has been undertaken by the WDII Consultant. Full details of this assessment are provided in Reference 8. The key information from the assessment has, however, been reproduced in this Appendix for easy reference.

Q1.2            Dredging and Filling Activities for Cumulative Assessment

Q1.2.1         The dredging and filling activities considered for the cumulative assessment for the three projects are detailed in Table Q.1 below.

Table Q.1 Dredging and Filling Activities for Construction Phase Cumulative Assessment

Description

Production Rate (m3 per day)

Plant

Dump Interval (hours)

Fines Release Rate (Kgs-1)

Sediment Loss Rate (kgs-1)

Maximum Fines Release Rate (kgs-1)

CRIII Dredge Final East

100m3 per hour

1 grab dredger of 8m3 capacity

-

1.86

 

15.19

CRIII Fill Final East

17,800 m3 per day

1 bottom dumping barge of 1,000m3 capacity

0.9

13.33

 

 

Yau Tong (Mitigated Scenario)

10,000 m3 per day

Bottom dumping with silt curtain

Spill loss during first 10 minutes for each 1 hour dumping cycle

45.26

 

45.26

WDII Dredging
CBR Area A1

4500

1 close grab dredger of 8m3

-

 

1.56

-

WDII Seawall trench sand filling
CBR Area A2

1875

1 close grab dredger of 8m3

-

 

0.18

-

WDII Dredging
WCR Area A3

2250

1 close grab dredger of 8m3

-

 

0.78

-

WDII Seawall trench sand filling
WCR Area A4

1875

1 close grab dredger of 8m3

-

 

0.18

-

WDII Dredging WCR/RHKYC B'water Area A5

2250

1 close grab dredger of 8m3

-

 

0.78

-

WDII Seawall trench sand filling WCR/RHKYC B'water Area A6

1875

1 close grab dredger of 8m3

-

 

0.18

-

WDII Dredging
Subsea Water Mains (1) Area A7

1000

1 close grab dredger of 8m3

-

 

0.35

-

WDII Dredging
Subsea Water Mains (1) Area A8

1000

1 close grab dredger of 8m3

-

 

0.35

-

WDII Dredging Submarine Sewage Pipeline
Area A9

1000

1 close grab dredger of 8m3

-

 

0.35

-

1.        For the purpose of modelling, two dredging locations are considered with A7 close to Hong Kong Island and A8 close to Tsim Sha Tsui. However, it should be noted that the dredging will be performed by 1 close grab dredger and, thus, will only operate at one location at a time.

Q1.3   Prediction and Evaluation of Environmental Impacts

Q1.3.1            Figures Q.1 and Q.2 show the extent of SS elevations for the cumulative assessment during the wet and dry season respectively. As shown in these figures, the extent of SS impact during the dry season appears smaller than that of the wet season. The construction cumulative SS concentration, at various sensitive receivers (including those considered for the CRIII assessments) are presented in Table Q.2.

Sensitive Receiver

SS concentration (absolute value) in surface layer (mg L-1)

 

Criterion

Dry season

Wet season

 

 

Mean (1)

Maximum (1)

% time in compliance

Mean (1)

Maximum (1)

% time in compliance

Cooling Water Intakes

 

 

 

 

 

 

 

Windsor House

-

10.1

30.4

-

23.8

236.3

-

Excelsior Hotel & World Trade Centre

-

8.1

20.6

-

14.0

55.8

-

Sun Hung Kai Centre

-

22.8

88.2

-

12.0

85.3

-

Great Eagle Centre / China Resources Building

-

11.3

59.7

-

7.3

62.2

-

Wan Chai Tower / Revenue Tower / Immigration Tower

-

11.3

59.7

-

7.3

62.2

-

Hong Kong Convention and Exhibition Centre Phase I

-

14.7

255.4

-

7.7

53.2

-

Hong Kong Convention and Exhibition Centre Extension

-

10.5

38.4

-

8.3

48.4

-

Telecom House / HK Academy for Performing Arts / Shun On Centre

-

14.4

123.8

-

8.2

78.1

-

MTRC South Intake

< 40

14.4

123.8

97.6

8.2

78.1

99.3

Prince's Building Group at CRIII

-

11.3

44.0

-

7.5

31.6

-

Queensway Government Offices at CRIII

-

15.9

178.4

-

9.3

262.8

-

Admiralty Centre at CRIII

< 40

15.9

178.4

92.8

9.3

262.8

98.7

HSBC & Hotel Furama at CRIII

-

10.1

24.8

-

18.9

140.2

-

WSD Saltwater Intakes

 

 

 

 

 

 

 

Wan Chai

< 10

12.2

38.1

50.1

9.3

31.1

68.0

Central Water Front

< 10

8.7

20.8

75.7

6.6

31.9

92.2

Sheung Wan

< 10

9.0

21.6

73.4

6.2

24.5

96.6

Quarry Bay (2)

< 10

8.1

16.3

92.6

9.3

25.1

68.0

Kowloon South

< 10

7.5

7.5

100.0

5.8

5.8

100.0

Tai Wan

< 10

7.5

9.8

100.0

6.6

16.2

94.8

Kennedy Town

< 10

7.7

11.3

98.8

5.8

6.6

100.0

Sai Wan Ho

< 10

7.8

13.5

96.4

7.9

24.1

81.9

Siu Sai Wan

< 10

7.5

8.8

100.0

7.3

13.8

89.0

Notes:      (1)            Absolute value of SS includes the ambient SS level (7.5 mg L-1 for dry season and 5.8 mg L-1 for wet season) in the surface layer of water column.

1.        As the invert level of the intake is located at the second top layer of the water column, the SS levels at the second top layer are quoted.

o        Bold number indicates exceedance of criterion.

Q1.3.2            Figures Q.3 and Q.4 show the tidal-averaged sedimetation rate of SS during the wet and dry seasons, respectively. Both figures indicate that the sedimentation rates at waters near the Green Island and within Junk Bay are much lower than 0.2kgm-2 per day. Thus, it is considered that the marine works from WDII, CRIII and Yau Tong Development will not adversely impact the coral communities at waters near the Green Island and within Junk Bay.

Q1.4   Specific Mitigation Measures for Cumulative Scenario

Q1.4.1            To minimise the potential SS impact, specific mitigation measures are recommended for the CRIII work during concurrent CRIII and WDII reclamation works. These include :

                                i.            deployment of silt curtains around the close grab dredgers to contain SS within the construction site during dredging and seawall filling; and

                              ii.            deployment of silt screens at the cooling water intakes and WSD salt water intakes to further minimise the intake of SS within the sea water.      

Q1.4.2      According to the Contaminated Spoil Management Study conducted for EPD in 1991, the implementation of silt curtain around the close grab dredgers will reduce the dispersion of SS by a factor of 4 (or about 75%). However, silt curtains should not be used in areas where current speeds are higher than 1.0 m s-1, and the effectiveness of the silt curtains will be reduced in areas of current speeds greater than around 0.5 m s-1. Thus, silt curtains will be recommended for seawall dredging and seawall trench filling near the existing coastline where current speeds are less than 0.5 m s-1. Similarly, the implementation of silt screen at the intake could reduce the SS level by a factor of 2.5 (or about 60%). This SS reduction factor has been established under the Pak Shek Kok Reclamation, Public Dump EIA (1997) and has been adopted in a number of recent studies, including the Western Coast Road EIA study.

Q1.4.3      Table Q.3 summarises the application of silt curtains and silt screens under the cumulative scenario. Table Q.4 summarises the predicted SS levels at the intakes after the implementation of these measures. With the measures recommended in Section Q1.4.1, all the sensitive receivers will comply with the relevant water quality criteria. Further mitigation measures for cumulative scenario is considered not necessary.

 Table Q.3 : Application of Silt Curtains and Silt Screens under Cumulative Scenario

Mitigation Measures

Location of Applications

Silt Curtains

·         Construction sites where dredging and seawall filling are undertaken, including CBR1, WCR1, WCR3E, Wan Chai PCWA, Extended Waterfront Promenade / Breakwater of Kellett Island Marina and FRAE of CRIII.

Silt Screens

·         WSD salt water intakes at Wan Chai, Central Water Front, Sheung Wan, Quarry Bay, Sai Wan Ho and Siu Sai Wan.

·         Cooling water intakes for Windsor House, Excelsior Hotel and World Trade Centre, Sun Hung Kai Centre, Great Eagle Centre / China Resources Building, Wan Chai Tower / Revenue Tower / Immigration Tower, HKCEC Phase I, HKCEC Extension, Telecom House / Hong Kong Academy for Performing Arts / Shun On Centre, MTRC South Intake, Prince’s Building Group at CRIII, Queensway Government Offices at CRIII, Admiralty Centre at CRIII, HSBC and Hotel Furama at CRIII.

 

Sensitive Receiver

SS concentration (absolute value) in surface layer (mg L-1)

 

 

Dry season

Wet season

 

Criterion

Maximum (1)

Maximum (1)

Cooling Water Intakes

 

 

 

Windsor House

-

5.3

25.4

Excelsior Hotel & World Trade Centre

-

4.3

7.3

Sun Hung Kai Centre

-

11.6

10.3

Great Eagle Centre / China Resources Building

-

8.7

8.0

Wan Chai Tower / Revenue Tower / Immigration Tower

-

8.7

8.0

Hong Kong Convention and Exhibition Centre Phase I

-

28.3

7.1

Hong Kong Convention and Exhibition Centre Extension

-

6.2

6.6

Telecom House / HK Academy for Performing Arts / Shun On Centre

-

15.1

9.5

MTRC South Intake

< 40

15.1

9.5

Prince's Building Group at CRIII

-

6.7

4.9

Queensway Government Offices at CRIII

-

20.1

28.0

Admiralty Centre at CRIII

< 40

20.1

28.0

HSBC & Hotel Furama at CRIII

-

5.0

15.8

WSD Saltwater Intakes

 

 

 

Wan Chai

< 10

6.1

4.9

Central Water Front

< 10

4.3

7.0

Sheung Wan

< 10

4.5

6.0

Quarry Bay (2)

< 10

4.3

7.0

Kennedy Town

< 10

3.7

2.4

Sai Wan Ho

< 10

3.6

8.1

Notes:      (1)              Absolute value of SS includes the ambient SS level (7.5 mg L-1 for dry season and 5.8 mg L-1 for wet season) in the surface layer of water column, with the deployment of silt curtains at CRIII and WDII at the dredging and fill release points (except dredging along the routes of WSD cross harbour water mains and the reprovisioned Wan Chai East submarine sewage pipeline) and installation of silt screens at the seawater intakes.

(2)              As the invert level of the intake is located at the second top layer of the water column, the SS levels at the second top layer are quoted.

-               Other WSRs, including WSD Cheung Sha Wan intake, WSD Cha Kwo Ling intake, WSD Yau Tong intake, planned intakes at Gren Island East, North and West, Kau Yi Chau Fishery, PLA Headquarters intake, Queen Mary Hospital intake, Stage 1 Phase 1 intake and Wah Fu Estate intake were found not to be impacted by marine works from CRIII and WDII.

Q1.5   Conclusion

Q1.5.1            With the mitigation measures proposed in Section Q.1.4 in place, the water quality impacts on sensitive receivers will be kept within acceptable limits.

Q2       Operation Phase Cumulative Assessment

Q2.1   Introduction

Q2.1.1            An operation phase cumulative assessment of the WDII, CRIII and other planned reclamation projects to be completed prior to 2012 has been undertaken by the WDII Consultant. Full details of this assessment are presented in Reference 8. The key information from the assessment has, however, been reproduced in this Appendix for easy reference.

Q2.2   Coastline Configuration for Cumulative Assessment

Q2.2.1            The operation phase coastline configuration adopted for the cumulative assessment is presented in Figure Q.5. This coastline configuration was based upon latest available information from the various planned reclamations to be undertaken prior to 2012. It includes the completed reclamation coastline for the CRIII project.

Q2.3   Pollution Loading Inventory for Cumulative Assessment

Q2.3.1            The pollution loading inventory adopted for the cumulative assessment was that compiled for the WDII project, based on the WDII expedient connection survey conducted in January 2000 and the pollution load inventory compiled under the on-going study titled "Update of Cumulative Water Impacts and Hydrological Effects of Coastline Development and Upgrading of Assessment Tool, Agreement No. CE42/97."

Q2.4   Prediction and Evaluation of Cumulative Impacts

Q2.4.1            Water Movement

Q2.4.1.1         The simulated surface flow patterns in the Victoria Harbour for the flood and ebb tides in the wet season are shown in Figure Q.6. Contour plots of depth-averaged flow speeds for the same tides are shown in Figure Q.7 . Equivalent results for the dry season are presented in Figures Q.8 and Q.9. The flow patterns correspond to the instantaneous water movements when the maximum flow discharges are observed across the Victoria Harbour between Tsim Sha Tsui and Wan Chai. Although the figures do not show the location of the Green Island, the hydrodynamic effect of Green Island has been taken account of in the model and represented by a thin dam.

Q2.4.1.2         In general, the modelling results for both wet and dry seasons demonstrate that flow speeds in the Victoria Harbour are moderate. Relatively higher flow speeds can be found between North Point and Kowloon Bay, between Wan Chai and Tsim Sha Tsui, and at the eastern harbour entrance near Lei Yue Mun. Within the Central Harbour area, the near shore flow speeds are generally lower than 0.25ms-1 and the highest flow speed occurs near the HKCEC Extension .

Q2.4.1.3         The wet season flow speed contours indicate that the ebb tide flow speed in the Victoria Harbour is higher than that for the flood tide. The depth-averaged ebb tide flow speeds lie within the range of 0.6 ms -1 and 1.0 ms -1, with a maximum of 1.12 ms -1 between North Point and Kowloon Bay. The depth-averaged flow speeds in the Victoria Harbour during the flood tide are generally less than 0.6 ms -1 and the highest speed is 0.78 ms -1 at the eastern harbour entrance. The flow speeds in the Central Harbour area are slow with relatively higher flow speed in the channel between the new extension of the HKCEC and the Wan Chai Waterfront.

Q2.4.1.4         From the dry season simulation, the contour plots show that the flow speeds for both flood and ebb tides are similar. In general, the depth-averaged flow speeds in the Victoria Harbour are less than 0.6 ms -1 . The respective maximum speeds for the ebb and flood tides are 0.91 ms -1 and 0.80 ms -1, both occurring at the eastern harbour entrance. Similar to the wet season case, the Central Harbour area experiences low flow speeds but higher speeds can be found near the HKCEC Extension.

Q2.4.1.5         The modelling results for the two seasons suggest that the west season ebb tide flow speeds in the Victoria Harbour are generally higher than those in the dry season. For the flood tide simulations, the flow speeds are more comparable between the two seasons.

Q2.4.1.6         Comparison with the baseline modelling results shows that the flow speed distributions within the Victoria Hrabour before and after the implementation of the CRIII and WDII projects are very similar. The reclamation causes slight change in the prevailing currents in the Central Harbour area. The maximum flow speeds in the harbour are slightly decreased by approximately 0.1 ms -1, mainly attributable to the local change of the coastline and is unlikely to affect the overall flow regime in the Victoria Harbour.

Q2.4.1.7         A comparison of the mean and maximum discharge rates across the Victoria Harbour between the baseline and operation scenarios is presented in Table Q.5, to assess the impact of planned reclamations upto 2012 on the overall assimilative capacity of the harbour. The mean and maximum discharge rates during the flood and ebb tides are taken at sections to the west and east of the harbour, between Yau Ma Tei and Sheung Wan, and across Lei Yue Mun respectively.

 Table Q.5 Discharge Rates at Sections to the East and West of the Victoria Harbour

Section

Season

Tide Phase

Mean discharge (m3 s -1)

Percentage change (%)

 

 

 

Baseline

Operation

 

Victoria Harbour East

Wet

Flood

Ebb

3926

4503

3731

4389

-4.96

-2.54

 

Dry

Flood

Ebb

4832

4007

4636

3864

-4.07

-3.56

Victoria Harbour West

Wet

Flood

Ebb

3139

3663

3079

3674

-1.92

0.31

 

Dry

Flood

Ebb

4026

3131

3979

3117

-1.18

-0.45

 

Section

Season

Tide Phase

Maximum discharge (m3 s -1)

Percentage change (%)

 

 

 

Baseline

Operation

 

Victoria Harbour East

Wet

Flood

Ebb

8464

11410

7995

10980

-5.54

-3.77

 

Dry

Flood

Ebb

9234

9302

8944

9000

-3.14

-3.25

Victoria Harbour West

Wet

Flood

Ebb

6733

9040

6583

9015

-2.23

-0.28

 

Dry

Flood

Ebb

7402

6997

7394

7004

-0.11

0.10

Q2.4.1.8         In general, the results show that the predicted mean discharges across the Victoria Harbour in the operation phase are decreased by less than 5% from the baseline scenario. Flow discharges in the operation phase took into account the cumulative effect of the Kowloon Point reclamation, the revised South East Kowloon Development reclamation, the Yau Tong Bay reclamation, the Western Coast Road reclamation, the CRIII and the WDII reclamations in the Victoria Harbour and some other reclamations outside the Victoria Harbour. Larger changes in discharge rate are observed at the eastern cross-section, particularly for the flood tide. The volume of flow through the east sectin (Qe) or the west section (Qw) of the Victoria Harbour is determined not only by the volume of flow through the other section, but also the volume of water (V) that could be retained within the Victoria Harbour between both sections. The area of the Victoria Harbour will be reduced after the completion of major reclamation projects within the Harbour. Thus, Qe will be reduced due to lower Qw and lower V during the ebb tide, and Qw will be reduced due to lower Qe and lower V during the flow tide in the operation phase. As the west section is wider than the east section, the reduction of volume of flow through the west section will have smaller change in discharge rate, while the reduction of the same volume of flow through the narrower east section will have higher change in the discharge rate. Thus, it is not surprising to see the precentage change of discharge rate through the east section is generally higher than that of the west section. Considering the marginal change in flow discharge through the Victoria Harbour, unacceptable water quality impact is not anticipated.

Q2.4.2            Water Quality in Victoria Harbour

Q2.4.2.1         For each seasonal condition simulated in the cumulative operation assessment, the water quality model results are presented as contour plots of tidal and depth-averaged water quality parameters for one spring-neap cycle. The parameters illustrated in this way are DO BOD, NH3-N, TIN and E.coli. All averaged values are arithmetic means except that for E. coli which refers to geometric mean.

o        Wet Season Results

Q2.4.2.2         The results of the wet season water quality simulations for the operation scenario are shown in Figures Q.10 to Q.12 and Q16 and Q17.

Q2.4.2.3         The depth-averaged DO concentration contours in the Victoria Harbour reveal a similar patern to that of the baseline condition. The DO in the harbour varies between 4 mg L-1 and 5.5 mg L-1. DO levels are generally higher at the western side of the harbour than those on the eastern side. The lowest DO is found at the eastern harbour entrance, possibly due to the oxygen uptake associated with the decay of BOD loads discharging from the SSDS interim outfall at the Stonecutters' Island, exceeding the WQO for depth-averaged DO. Low DO level is also observed within the semi-enclsoed area adjacent to Stonecutters' Island as a result of its low flushing capacity. In the vicinity of the Central Harbour area, although the tidal minimum depth averaged DO is marginally lower than 4.0mgL-1 (refer to Figure Q.16), it still complies with the WO of annual depth averaged DO concentration when the dry season predicitons are also considered. The tidal minimum bottom DO is generally greater than 3.0mgL-1 (refer to Figure Q.17) and, thus, complies with the WQO of bottom DO.

Q2.4.2.4         The overall distributions of BOD are largely unchanged form the baseline scenario. In general, the simulated BOD concentrations in the Victoria Harbour are less than 2 mg L-1. BOD level in the Victoria Harbour decreases gradually from the western side, where the SSDS interim outfall is located, towards the eastern side with the BOD level of less than 1.0 mg L-1. On the other hand, elevated BOD concentrations are observed within the semi-enclsoed area adjacent to Stonecutters' Island and within the Yau Ma Tei Typhoon Shelter. High BOD levels are also found near the sewage outfall from the Wan Chai catachment, but the BOD concentrations within the Central Harbour area are generally less than 2 mg L-1.

Q2.4.2.5         The overall NH3-N levels in the Victoria Harbour are slightly increased by approximately 0.05 mg L-1 when compared with the baseline condition, but the distributions are similar. The NH3-N concentrations in the operation phase scenario are less than 0.2 mg L-1 within the Central Harbour area. The WQO for NH3-N is, however, specified in terms of the unionised ammonia level. With reference to the WQO of 0.021 mg L-1 for unionised ammonia, the total NH3-N level at 32.4oC, pH8 and salinity of 30.8 ppt is estimated to be 0.22mg L-1 . The predicted concentrations of total NH3-N in the Central Harbour area therefore do not exceed the WQO for NH3-N.

Q2.4.2.6         Similar to the changes in NH3-N level, the predicted TIN concentrations in the Victoria Harbour are slightly higher in the operation scenario than those in the baseline scenario. This may be attributed to the increase in pollution load between the baseline scenario and the operation scenario. Higher TIN levels can be found near the western harbour and also within the semi-enclosed area adjacent to Stonecutters' Island. The depth-averaged TIN concentrations in the Central Harbour area are less than 0.4mg L-1. Elevated TIN level is observed near the stormwater discharges. Hence, the WQO for TIN (0.4mgL-1) cannot be met near the stormwater outfalls but slight improvements from the baseline simulation are observed in the operation scenario.

Q2.4.2.7         Comparing with the baseline simulation results, the E. coli levels in the Victoria Harbour are only marginally affected. The E. coli concentrations range form 1.0 x 107 cfu m-3 (1000 cfu per 100mL) to 5.0 x 108 cfu m-3 (50000 cfu per 100 mL) near the submarine sewage outfall locations. In general, the E. coli level is higher in the western harbour than that on the eastern side. Within the Central Harbour area the predicted E. coli concentrations are less than 1.0 x 108 cfu m-3 (10000 cfu per 100mL).

Q2.4.2.8         The depth averaged mean and 90%ile SS concentration at EPD's routine monitoring stations VM4, VM5 and VM6 range between 8.1/mgL-1 at station VM4 and 9.7mgL-1 at VM6. This is higher than the predicted in the baseline scenario by upto 26.5% and, thus, complies with the WQO for SS.

o        Dry Season Results

Q2.4.2.8         The water quality modelling results for the operation scenario, dry season are presented in Figures Q.13 to Q.15 and Q.18 to Q.19.

Q2.4.2.9         The DO concentrations in the Victoria Harbour simulated for the dry season are comparable to the baseline conditions. The depth-averaged DO concentrations are greater than 6.0 mgL-1 at the eastern side of the harbour, while those for the western harbour are slightly lower, between 5.0 mgL-1 and 6.0 mgL-1. However, DO levels fall below 4.0 mgL-1 within the semi-enclsoed areas adjacent to the Stonecutters' Island, breaching the WQO (>4.0). This is consistent with the baseline scenario due to the slow tidal flow within the semi-enclosed area. In the vicinity of the Central Harbour area, the tidal minimum depth averaged are bottom DO concentrations (refer to Figures Q.18 and Q.19) are both greater than
5.0 mgL-1, which comply with the WQO for depth averaged and bottom DO.

Q2.4.2.10       The BOD concentration distributions in the Victoria Harbour are similar to that in the baseline simulation. The predicted BOD levels in dry season are genarally lower than that in the wet season. Lower BOD levels in the dry season are likely to be the result of lower BOD pollutant loadings from stormwater discharges. The BOD concentrations in the Central Harbour area are around 1.0 mgL-1.

Q2.4.2.11       The pattern of NH3-N distributions in the Victoria Harbour is largely unchanged from the baseline scenario. The NH3-N concentrations are generally less than 0.15 mgL-1 within the harbour areas, but higher levels are found in the western side of the harbour and within the semi-enclsoed area adjacent to the Stonecutters' Island. In the Central Harbour area, the NH3-N concentrations are less than 0.2 mgL-1 and, thus, comply with the WQO for unionised ammonia level of 0.021mgL-1, which is equivalent to a NH3-N level of 0.67 mgL-1 at 17.1oC, pH 8 and salinity of 30.8ppt.

Q2.4.2.12       The simulated TIN concentrations in the Victoria Harbour are similar between the baseline and operation scenarios. Because of the lower TON loadings from stormwater discharges, the dry season TIN level in the vicinity of the Central Harbour area is much lower than that in the wet season. In general, the TIN concentrations in the Central Harbour area are less than 0.3 mgL-1 and, thus, comply with the WQO for TIN of 0.4 mgL-1.

Q2.4.2.13       The modelling results for the operation scenario indicates that the distributions of E. coli concentrations in the Victoria Harbour are slightly altered, but the general trend is similar. The E.coli levels are similar between the dry and wet seasons, with slightly higher overall levels for the dry season. The simulated E. coli concentrations near the Central Harbour area are generally less than 1.0 x 108 cfu m-3 (10000 cfu per 100mL), with higher values near the reprovisioned Culvert L west of the HKCEC Extension.

Q2.4.2.14       Comparison with the baseline water quality modelling results suggests that the levels of pollutant in the Central Harbour area are similar between the baseline and operation phases. No unacceptable water quality impacts associated with the CRIII and WDII reclamations are envisaged in the Victoria Harbour.

Q2.4.3            Water Quality at Sensitive Receivers

Q2.4.3.1         The main water sensitive receivers identified in the Central Harbour area include WSD saltwater pumping stations and a number of seawater intakes for the cooling water systems of the neighbouring commercial buildings. In general, these intakes are located within a few metres from the water surface and, thus, the water quality within the surface layer is of main concern.

Q2.4.3.2         From the water quality model, time-series of the SS, DO, BOD, NH3-N and E.coli concentrations in the surface water layer at the WSD saltwater intakes and surface SS concentration at the cooling water intakes are extracted. The mean and maximum values of the water quality parameters in the wet and dry seasons, together with the relevant criteria, are shown in Tables Q.6 to Q.10 for comparison.

 

Sensitive Receiver

SS concentration (absolute value) in surface layer (mg L-1)

 

Criterion

Dry season

Wet season

 

 

Mean

Maximum

% time in compliance

Mean

Maximum

% time in compliance

Cooling Water Intakes

 

 

 

 

 

 

 

Windsor House

-

16.7

22.1

-

8.9

12.3

-

Excelsior Hotel & World Trade Centre

-

16.7

22.1

-

8.9

12.3

-

Sun Hung Kai Centre

-

8.3

9.9

-

7.6

8.5

-

Great Eagle Centre / China Resources Building

-

8.1

10.0

-

7.5

8.8

-

Wan Chai Tower / Revenue Tower / Immigration Tower

-

8.1

10.0

-

7.5

8.8

-

Hong Kong Convention and Exhibition Centre Phase I

-

8.1

10.0

-

7.5

8.8

-

Telecom House / HK Academy for Performing Arts / Shun On Centre

-

8.1

10.0

-

7.5

8.8

-

MTRC South Intake

< 40

8.1

10.0

100

7.5

8.8

100

WSD Saltwater Intakes

 

 

 

 

 

 

 

Wan Chai (1)

< 10

8.3

9.9

100

7.6

8.5

100

Central Water Front

< 10

8.5

9.7

100

7.0

8.8

100

Sheung Wan

< 10

8.5

9.7

100

7.0

8.8

100

Quarry Bay (1)

< 10

6.2

8.2

100

7.3

8.5

100

Kowloon South

< 10

17.4

19.5

0

7.2

9.0

100

Tai Wan

< 10

6.9

9.6

100

7.5

8.3

100

Cha Kwo Ling

< 10

5.8

7.2

100

7.3

8.1

100

Kennedy Town

< 10

8.6

10.4

93.9

5.6

6.3

100

Sai Wan Ho

< 10

5.7

7.4

100

7.3

8.0

100

Siu Sai Wan

< 10

4.5

5.6

100

6.0

6.9

100

Yau Tong

< 10

5.6

7.2

100

7.2

8.1

100

Notes:

1.        The depth of the intake is within the second top layer of the water column. The SS level in the second layer is quoted.

 

Sensitive Receiver

DO concentration in surface layer (mg L-1)

 

Criterion

Dry season

Wet season

 

 

Mean

Minimum

% time in compliance

Mean

Minimum

% time in compliance

WSD Saltwater Pumping Station

 

 

 

 

 

 

 

Wan Chai (1)

> 2

5.9

5.6

100

5.2

3.9

100

Central Water Front

> 2

5.6

5.3

100

5.5

4.0

100

Sheung Wan

> 2

5.6

5.3

100

5.5

4.0

100

Quarry Bay (1)

> 2

6.2

5.9

100

4.3

3.4

100

Kowloon South

> 2

5.5

5.4

100

6.7

5.4

100

Tai Wan

> 2

6.1

5.8

100

5.3

4.1

100

Cha Kwo Ling

> 2

6.3

6.1

100

5.1

4.2

100

Kennedy Town

> 2

5.5

4.9

100

5.7

4.9

100

Sai Wan Ho

> 2

6.3

6.1

100

4.9

3.9

100

Siu Sai Wan

> 2

6.5

6.3

100

4.6

4.0

100

Yau Tong

> 2

6.3

6.1

100

4.9

4.1

100

Notes:

(1)            The depth of the intake is within the second top layer of the water column. The DO level in the second layer is quoted.

 

Sensitive Receiver

BOD5 concentration in surface layer (mg L-1)

 

Criterion

Dry season

Wet season

 

 

Mean

Maximum

% time in compliance

Mean

Maximum

% time in compliance

WSD Saltwater Pumping Station

 

 

 

 

 

 

 

Wan Chai (1)

< 10

0.8

1.0

100

1.7

2.3

100

Central Water Front

< 10

1.0

1.5

100

1.7

2.1

100

Sheung Wan

< 10

1.0

1.5

100

1.7

2.1

100

Quarry Bay (1)

< 10

0.5

0.7

100

1.4

1.9

100

Kowloon South

< 10

0.7

0.7

100

1.7

2.3

100

Tai Wan

< 10

0.5

0.7

100

1.6

2.0

100

Cha Kwo Ling

< 10

0.4

0.5

100

1.6

2.5

100

Kennedy Town

< 10

1.0

1.5

100

0.9

1.5

100

Sai Wan Ho

< 10

0.4

0.6

100

1.6

2.2

100

Siu Sai Wan

< 10

0.2

0.3

100

1.1

1.5

100

Yau Tong

< 10

0.3

0.5

100

1.5

2.2

100

Notes:

(1)            The depth of the intake is within the second top layer of the water column. The BOD5 level in the second layer is quoted.

 

Sensitive Receiver

NH3-N concentration in surface layer (mg L-1)

 

Criterion

Dry season

Wet season

 

 

Mean

Maximum

% time in compliance

Mean

Maximum

% time in compliance

WSD Saltwater Pumping Station

 

 

 

 

 

 

 

Wan Chai (1)

< 1

0.15

0.20

100

0.17

0.24

100

Central Water Front

< 1

0.22

0.35

100

0.19

0.30

100

Sheung Wan

< 1

0.22

0.35

100

0.19

0.30

100

Quarry Bay (1)

< 1

0.08

0.13

100

0.15

0.21

100

Kowloon South

< 1

0.21

0.24

100

0.10

0.18

100

Tai Wan

< 1

0.10

0.16

100

0.16

0.22

100

Cha Kwo Ling

< 1

0.06

0.09

100

0.15

0.25

100

Kennedy Town

< 1

0.31

0.44

100

0.07

0.17

100

Sai Wan Ho

< 1

0.06

0.10

100

0.16

0.20

100

Siu Sai Wan

< 1

0.02

0.05

100

0.10

0.14

100

Yau Tong

< 1

0.06

0.10

100

0.15

0.23

100

Notes:

(1)            The depth of the intake is within the second top layer of the water column. The NH3-N level in the second layer is quoted.

 

Sensitive Receiver

E. coli concentration in surface layer (cfu per 100 mL)

 

Criterion

Dry season

Wet season

 

 

Mean (1)

Maximum

% time in compliance

Mean (1)

Maximum

% time in compliance

WSD Saltwater Pumping Station

 

 

 

 

 

 

 

Wan Chai (2)

< 20000

6241

12520

100

4300

13410

100

Central Water Front

< 20000

5095

19560

100

4453

11110

100

Sheung Wan

< 20000

5095

19560

100

4453

11110

100

Quarry Bay (2)

< 20000

3691

6732

100

2333

8650

100

Kowloon South

< 20000

1558

2558

100

435

2988

100

Tai Wan

< 20000

3713

8763

100

3715

15460

100

Cha Kwo Ling

< 20000

842

2575

100

3467

17240

100

Kennedy Town

< 20000

721

5593

100

173

3838

100

Sai Wan Ho

< 20000

2508

5001

100

7994

18820

100

Siu Sai Wan

< 20000

123

1265

100

1516

4403

100

Yau Tong

< 20000

1380

4514

100

2966

12220

100

Notes:

1.        Average values are calculated as geometric mean.

(2)            The depth of the intake is within the second top layer of the water column. The E. coli level in the second layer is quoted.

Q2.4.3.3         The results show that the SS concentratins at the sensitive receivers are generally increased when compared with the baseline scenario and to a greater extent in the dry season. The SS level at the WSD Kowloon South Salt Water Intake is increased considerably beyond the target limit. However, this is likely to be assoicated with the high pollution load at the SSDS interim outfall at the Stonecutters' Island in the operation year and the slow tidal flow in the semi-enclosure area near Yau Ma Tei. The exceedance of SS level at the WSD Kennedy Town Salt Water Intake appears to be related with the increase in background SS concentration (that may be associated with the increased pollution loading from adjacent local outfalls and the pollution load from the SSDS interim outfall) and is unlikely to be affected by the operation of the CRIII and WDII reclamations.

Q2.4.3.4         For the DO, BOD and NH3-N at the WSD salt water intakes, the prediced concentrations are similar to that simulated for the baseline scenario, and 100% compliance in time with the WSD's target limits can be achieved in the operation scenario. For E. coli levels at the WSD salt water intakes, the predicted concentrations during the operation phase of the CRIII and WDII will also comply with the WSD's target level.

Q2.5   Specific Mitigation Measures for Cumulative Scenario

Q2.5.1            The results of the cumulative assessment for the operation year of 2012 presented in section Q2.4 above illustrates that these will be no adverse water quality impacts in the Central Harbour area associated with the operation of the CRIII or WDII projects. Thus operational stage mitigation measures are not considered necessary.

Q2.6   Conclusion

Q2.6.1            Hydrodynamics

Q2.6.1.1         A cumulative assessment of the hydrodynamic impact due to planned reclamation upto 2012 including CRIII and WDII has been made. Under this assessment the hydrodynamic impacts have been assessed for the dry and wet seasons over a spring-neap tidal cycle. For both seasons, the baseline and operation simulations have been compared. The assessment concluded that:

o        The wet season ebb tide flow speeds in the Victoria Harbour are higher than that in the dry season. For the flood tide simulations, the flow speeds are more comparable between the two seasons.

o        The flow speed distributions within the Victoria Habrour before and after the implementation of the reclamation projects including CRIII and WDII are very similar. The reclamation projects will only cause slight change in the prevailing currents in the Central Harbour area.

 

o        The predicted mean discharges across the Victoria Harbour East (Lei Yue Mun) and Victoria Harbour West (Yau Ma Tei - Western District) will be decreased by less than 5% and 2%, respectively, during the wet season after the completion of WDII reclamation, as well as other reclamations within the Victoria Harbour, including the CRIII, Kowloon Point Development, the South East Kowloon Development, the Yau Tong Bay Development and the Western Coast Road reclamation.

o        The predicted mean discharges across the Victoria Harbour East (Lei Yue Mun) and Victoria Harbour West (Yau Ma Tei - Western District) will be decreased by about 4% and less than 1.5%, respectively, during the dry season after the completion of WDII reclamation, as well as other reclamations within the Victoria Harbour, including the CRIII, Kowloon Point Development, the South East Kowloon Development, the Yau Tong Bay Development and the Western Coast Road reclamation.

Q2.6.1.2         Therefore, it is concluded that the reclamation projects including CRIII and WDII will have minimal impact on the hydrodynamic regime of the Central Harbour area.

Q2.6.2            Water Quality

Q2.6.2.1         An assessment of the water quality impact during the operation year of 2012 has been made. Comparison between the baseline and operational water quality modelling results suggests that the levels of pollutants in the Central Harbour area are similar under both the baseline and operational scenarios. No unacceptable impacts associated with the operation of the CRIII and WDII projects upon the water quality in the Victoria Harbour are envisaged. Based on the moedlling results for the cumulative assessments, operation phase mitigation measures for the CRIII or WDII projects are not considred necessary. Operational water quality monitoring and aduit is therefore not considered necessary.

 

 

Appendix R - SedPlume Modelling Scenarios and Results from Previous Studies for the Project Site

R.1      Introduction

This Appendix provides details of previous SEDPLUME modelling conducted in 1996/1997 for the CRIII project site. It describes the modelling scenarios conducted to assess the far field impacts associated with spring tides, which have the largest tidal excursions and therefore give the largest area impacted by elevated suspended solid concentrations.

The SEDPLUME model used was a part of the WAHMO suite of coastal hydraulic and water quality models. As basic tidal flow data, the SEDPLUME model used results from the WAHMO model of tidal flows. The WAHMO model of tidal flows had been set up to simulate tidal flows for 1987 conditions and calibrated by simulating all relevant reclamations for 1995 conditions and comparing the mdoel with flow data sets collected on spring and neap tides in the 1995 dry season. The calibrated and validated model was accepted by the EPD in 1996.

R.2      Description of Modelled Scenarios

R.2.1   Scenario 1 Description

In Scenario 1 it was assumed that a single grab dredger would be employed on the Area West 1 (refer to Figure R.1) and three grab dredgers on the eastern island - Area East 1 (refer to Figure R.1) for dredging the seawall trenches for the Area West 1 and Area East 1 respectively. The rate of working for the dredger on Area West 1 was taken to be 1,000m3 per day and on the eastern island the combined rate of working for the three dredgers was taken to be 2,750m3 per day. The loss of fine sediment to suspension was assumed to be 5%, with a dry density of 488 kg m -3 for the fine portion, which gave a loss rate of 0.424 kg s-1 for Area West 1 and a combined loss rate of 1.165 kg s-1 for the Area East 1 for the duration of a 16-hour day. The loss of sediment to suspension at Area West 1 was simulated by injecting the sediment into the model at a single point and for the eastern island at three points, which reflected the number of stationary grab dredgers working in each area.

R.2.2   Scenario 2 Description

In Scenario 2 it was assumed that a single trailer dredger would be carrying out filling and that it would be working on the eastern island - Area East 1. The maximum rate of filling was assumed to be 25,000m3 per day for a 16-hour day. It was assumed that 100% of the fines content of the fill material would be lost to suspension with the fines content being taken to be 5% based on values obtained from other reclamation proejcts. The loss of fines to suspension was thus calculated to be 10.59 kg s-1 for the duration for the 16-hour working day which is based on a dry density of the fines of 488 kg m-3.

R.2.3   Differences Between Input to Modelled Scenarios Undertaken in 1996/1997 and 1999/2000

For the above scenarios modelled in 1996/1997, it is recognised that these are certain differences in input assumptions when compared to the 1999/2000 modelled scenarios presented in Chapter 10 of this EIA Report. These differences are summarised in Table R. 1 along with an explaination as to why they occur and an indication of whether they produce more or less conservatism in the modelling.

Table R. 1 Differences in Impact Assumptions for SEDPLUME Models

Item

Difference between 1996/1997 and 1999/2000 Modelling Assumptions

Effect on Conservatism of the Modelling Results

Loss of fines to suspension

100% loss of fines (1996/1997)


5% loss of fines (1999/2000)


(the difference in loss of fines was derived from data abstracted from other recent EIA projects. The difference in % fines release refers to marine sand filling).

The higher release rate for the 1996/1997 modelling will produce more conservative results than the 1999/2000 modelling

Dry Density of Dredging and Filling Materials

488 kgm-3 for fines content

(1996/1997)

No theoretical difference as the same type of material are to be dredged / filled. However, the higher density values used in the 1999/2000 modelling make this modelling more conservative than the 1996/1997 modelling.

 

1340 kgm-3 for entire dredge material
1600 kgm-3 for entire fill material

 

(1999/2000)

 

 

(the densities are presented in a different manner in 1999/2000 to suit the mdoel input requirements)

 

Total Loss Rates

1996/1997 Modelling

Scenario 1

Area West 1, Dredging, Loss Rate 0.424kgs-1
Area West 1, Dredging, Loss Rate 1.165kg-1

Scenario 2

Area East 1, Filling, Loss of fines 10.59kgs-1 for 16-hr working day

The net loss rate for the Scenerio 2 of 1996/1997 modelling is higher than that in the 1999/2000 modelling.

 

1999/2000 Modelling

Scenerio 1

Initial East, Filling, Fines Release Rate 13.33kgs-1 at dump intervals of 1.2 hrs.

Initial West, Filling, Fine Release rate 10.0kgs-1 at dump intervals of 2.7hrs

Scenerio 2

Final East, Dredging, Loss Rate 1.86 kgs-1
Final East, Filling, Fines Release Rate 13.33kg-1 at dump intervals of 0.9 hrs.

 

Construction Equipment

Grab Dredgers for Dredging
Trailer Dredger for filling

(1996/1997)

The larger reclamation area considered in 1996/1997 was associated with larger quantities of dredge and fill materials so that the results of the modelling will be conservative when compared to the 1999/2000 modelling. Programme periods for reclamation works are similar for both the 1996/1997 and 1999/2000 reclamation construction works.

 

Grab Dredgers for Dredging
Split Hopper Barges for Filling

 

(1999/2000)

 

 

(the differences are due to the reduction in reclamation area)

 

R.3      Results of Modelled Scenarios

R.3.1   Introduction

The SEDPLUME model results from the above scenarios were presented in elevated concentration of SS above the ambient (background) level. Comparisons were made between the predicted SS evaluations and the WQO allowance of SS elevation (3.6mg/l).

R.3.2   Scenario 1 Results

The contours (Figure R.2) of suspended solids concentration above ambient level on the flood tide show plumes extending from the works area along the coast of Hong Kong Island past Sheung Wan with the majority of the plumes having elevated concentrations in the range 2 - 5 mg l-1, with peak elevated concentrations off Western District in the range 5 - 10 mgl-1. In the lower layer there were areas of higher elevated SS concentrations, greater than 20 mg l-1, to the east of the dredging sites which are caused by re-erosion of the slack water deposits from the ebb tide. On the ebb tide the contours of elevated SS concentration in the upper layer show a plume with elevated concentrations in the range 2-5 mgl-1 extending some 2 km to the east of the dredging site. There is an area with higher elevated concentrations, in the range 10 - 15 mgl-1, shown on the western side of the HKCEC reclamation. The plume in the lower layer is similar but with areas of high elevated concentration, which are caused by re-erosion of slack water deposits.

The time history graphs (Figure R.3) of elevated SS concentrations at the sea water intakes show the maximum impacts at Intake 3 (Figure R.4), where the SS concentration increases by 8 mgl-1. At Intake 2 (Figure R.4) the maximum SS concentrations have increased from 2 mgl-1 to 4 mgl-1 while at the other intakes maximum suspended sediment concentrations still remain below 2 mgl-1 to 4 mgl-1 while at the other intakes maximum suspended sediment concentrations still remain below 2 mgl-1. The increment is within the WQO's allowance. Intake 4 appears to have no significant impact of SS from dredging.

The contour plots also show that there are virtually no SS impact at Wanchai and North Point flushing water intakes.

R.3.3   Scenario 2 Results

The contours of elevated SS concentrations on the flood tide show a plume extending from the filling site along the Central Reclamation Phase I to beyond Sheung Wan in the upper layer (Figure R.5).

Maximum elevated concentrations are at the filling site and are greater than 80 mgl-1 . There are also elevated suspended solids shown to the east of the dredging site which are the sediment remaining in suspension from the previous ebb tide. In the lower layer (Figure R.5) a plume is shown from the filling site extending westwards along the CRI. Again there is sediment present to the east of the dredging site from the previous ebb tide and there are small areas to the immediate east of the HKCEC caused by re-erosion of the recently deposited material.

On the ebb tide a small plume is shown to extend eastwards past the HKCEC in the upper layer with concentrations of greater than 80 mgl-1 close to the site of filling. Elsewhere on the ebb tide in the surface layer suspended sediment concentrations are less than 10 mgl-1. In the lower layer (Figure R.5) the pattern of suspended sediment concentrations is similar to that in the upper layer but with higher concentrations further away from the dredging site.

The time history graphs of elevated SS concentrations at the sea water intakes (Figure E.6) show predicted impacts at Intakes 1, 2 and 3 (Figure R.4) which are on the flood side of the filling operations. Intake 3 shows the maximum impact of up to 40 mgl-1 increase in the upper layer while the impacts at Intakes 1 and 2 are about 8 and 18 mgl-1 increase in the upper layer. The other intakes are mainly impacted in the lower layer with maximum increased of 10 mgl-1 at Intake 8. Intake 4 (Figure R.4) is not impacted by SS from filling oeprations.

The contour plots also show that there is less than 5 mgl-1 elevation of SS at Wanchai flushing water intake and no impact at North Point flushing water intake.

Appendix T

Baseline Study - Description of the Environment

T.1       Introduction

T.1.1   The CRIII works landscape and visual character zones are indicated on Figure T.1. The baseline visual envelope and photo view point locations are indicated in Figure T.2. Primary Visually Sensitive Receivers (VSRs) are depicted in Figure T.3. Photograph views of baseline landscape and visual characteristics are indicated in Figures T.4 – T.9.

T.2       Character Areas

T.2.1   The CRIII works area is composed of the following 17no. landscape and visual character zones:

CA1    The Servicemen’s Guides Association

The low-rise development of the Servicemen’s Guides Association Building, commonly referred to as the Fleet Arcade, is of low visual amenity and does not dominate the surrounding space. The site has direct access to the waterfront which is currently used as a sitting out terrace for a McDonald’s restaurant. Adjacent to the three-storey building is an area of vent shafts, pump house, kiosks and car parking.

CA2    Citic Tower

Citic Tower is a new medium rise office development which visually dominates the eastern zone of the study area (refer to Figure T.5). The structure provides positive visual amenity and balances well with its counterpoint development at the Central Barracks. Measures have been taken to retain a mature Banyan tree (Ficus microcarpa) adjacent to Citic Tower, which is one of two trees that marked the entrance to the former Tamar basin.

CA3    Lung Wui Road

Lung Wui Road follows an east-west alignment approximately 40 metres south of the existing sea wall and is depicted in Figure T.5. Views of Victoria Harbour and Kowloon Peninsula are obstructed by perimeter fencing at the Heliport site and Servicemen’s Guides Association but are open across the temporary park to the west. Streetscape character is enhanced by recent tree planting and concrete block paving, both of which are of a higher quality along the southern pavement.

CA4    Tim Mei Avenue and Tim Wa Avenue

Tim Mei Avenue is aligned north-south adjacent to the Citic Tower and footbridge and is depicted in Figure T.4. Views from one-way traffic are focused north on the Heliport site. The streetscape character is very open along it’s western boundary where a 12 metre wide pavement incorporates high quality tree planting within concrete block paving.

Tim Wa Avenue is aligned north-south and incorporates two-way traffic. The road is dominated by the Central Barracks on its western boundary and incorporates a central reservation with immature palm tree planting. In common with Tim Mei Avenue a very wide pavement area with tree planting has been constructed adjacent to the former Tamar basin which gives Tim Wa Avenue a very open character.

CA5    Former Tamar Basin

The rectangular site of the former Tamar basin is a large ‘hardstanding’ area paved with asphalt, the function of which currently alternates between a location for car parking and an events area and is depicted in Figure T.4. Peripheral tree planting situated along Harcourt Road, Tim Mei Avenue, Lung Wui Road and Tim Wa Avenue is currently immature and provides insignificant site screening. The former Tamar basin fragments the study area into disjointed eastern and western character zones.

CA6    Connaught Road Central/ Harcourt Road

This busy dual 3-lane transport corridor defines the southern edge of the subject site. The road is bridged in three locations linking the site with Swire House, World Wide House and Exchange Square to the west, Hutchison House in the Central section, and the United Centre to the east. Additionally a pedestrian underpass links Statue Square with Edinburgh Place and the "Star" Ferry Pier.

CA7    Heliport (Government Flying Service/ Heliservices) Area

The heliport is currently located west of Fenwick Pier Street adjacent to the sea wall with a boundary fence extending to the pavement edge. The site is devoid of noteworthy landscape or visual features and the boundary fence obscures views of Victoria Harbour from Lung Wui Road.

CA8    Temporary Park

A temporary park has been constructed adjacent to the sea wall opposite the Central Baracks. The park is 30 metres wide and comprises raised planters, a simple and robust concrete block paving scheme, bespoke seating and lighting and post-mounted binoculars to view the harbour traffic. The site is popular with visitors, primarily because it is one of the few locations in the city where one can gain amenity access to the harbour front.

CA9    Central Barracks

The Central Barracks is an easily identifiable landmark within the Central - Wan Chai district and is indicated at Figure T.3 and T.4. The PLA Forces Hong Kong Building within the barracks is of an unusual design with an inverted base which visually dominates the study area to a greater degree than any other single element. Visually Sensitive Receivers (VSRs) surrounding the Central Barracks site receive views of attractive mature trees planted within the development boundary. A mature Banyan Tree (Ficus microcarpa) is located at the north-eastern corner of the site at the junction of Lung Wui Road and Tim Wa Avenue. The tree is an important landscape and visual element which marks the western extent of the former Tamar basin and is similar to the Banyan tree transplanted at Citic Tower.

CA10  Queen’s Pier / Edinburgh Place

Queen’s Pier is a busy pedestrian interchange. The visual amenity of the site stems from the public and private vessels which are loading and unloading passengers. This area is cluttered with traffic control devices, utilities, and other architectural paraphernalia which is generally in disrepair. This is an intensively used space in a poorly maintained state.

CA11  City Hall

City Hall is a low rise complex with a tower block located at it’s western edge. The development is an example of modern architecture, designed in 1958, which maintains a clean angular form. Due to multiple uses including marriage registry, the then urban council chambers, car park and public library, City Hall generates substantial pedestrian activity. The building is well maintained with an attractive and unique character. A courtyard garden provides passive amenity space for pedestrians but there is limited spatial and visual relationship between the garden and Edinburgh Place. The garden is a memorial space of cultural significance.

CA12  Northern Areas of Statue Square adjacent to Connaught Road

Statue Square is connected to Edinburgh Place by a pedestrian underpass beneath Connaught Road Central and by an at-grade crossing at Charter Road. The spaces are aligned on a north-south axis from the HSBC Headquarters Building, to the "Star" Ferry Pier and are located adjacent to the Cenotaph site. Statue Square benefits from a strong sense of enclosure and provides a green link between the study area and Charter Garden. The square is a popular amenity resource for pedestrians and tourists. Statue Square provides a valuable visual corridor from the study area south into the urban fabric, noteworthy for the old and contemporary architectural styles of the Legislative Council Building and the Hong Kong & Shanghai Bank respectively. This is a major civic space of Hong Kong dominated by the famous facade of the Hongkong & Shanghai Bank.

CA13  "Star" Ferry Car Park

"Star" Ferry Car Park (also known as the Edinburgh Place Multi-storey Carpark) is a development of low visual quality which provides a major obstacle for pedestrian circulation within the surrounding areas. The structure creates a physical and visual barrier between Statue Square and the "Star" Ferry Pier.

CA14  "Star" Ferry Pier

The "Star" Ferry Pier provides a significant landmark within the Central area of Hong Kong Island particularly when viewed from the harbour. This old two-finger pier development generates substantial pedestrian movement, the majority passing south into Statue Square and the MTR system. Adjacent open space is characterised by a taxi rank, hawkers, poor quality hard and soft landscape, and one of the few remaining rickshaw operators in Hong Kong. Generally the "Star" Ferry Pier has a highly animated character which is adversely affected by a lack of pedestrian space, and the poorly maintained architectural structures and landscape elements.

CA15  General Post Office (GPO)

The GPO building is a single medium rise development of limited visual character located on Connaught Place. This south-eastern corner of the study area is visually dominated by Jardine House, which overshadows the GPO building and reduces its visual significance. A covered, at- grade walkway passes along the GPO northern boundary and an elevated walkway accesses the western facade. A small amount of soft landscaping has been implemented adjacent to the eastern end of the building and hard surfacing is of a generally poor quality throughout the immediate environs.

CA16  Eastern Edge of Central Reclamation Phase I

The western extent of the study area comprises a covered pedestrian link from the GPO to the new outlying islands ferry piers. The footpath is visually dominated by the harbour to the east and open development land to the west. A small temporary park has been implemented adjacent to the sea wall which leads to a convenience store. Generally the character of this reclamation edge is very open and notably lacking in tree planting due to the temporary nature of the development and unfinished building works.

CA17  Victoria Harbour between Central Reclamation Phase I and the Hong Kong Convention and Exhibition Centre

The harbour resource is contained on three sides by reclamation and is characterised by a milieu of craft including "Star" Ferries, Discovery Bay Ferries, hovercraft and private vessels using Queen’s Pier. There are very limited opportunities to access the harbour edge for passive recreation and soft landscape treatment is noticeably lacking, with the exception of street tree planting adjacent to the Hong Kong Convention and Exhibition Centre. The harbour is the visual focus for north and south facing development on Hong Kong Island and Kowloon Peninsula respectively. In turn it is visually dominated by these urban skylines.

T.3       Summary

T.3.1   The CRIII works area is highly fragmented and comprises components which are transitional in nature. There is a lack of physical and visual integration between the open underdeveloped eastern character zones and the older western areas. Streetscape is generally of a low quality and suffers from a lack of mature landscape planting. Public access to the harbour edge is generally lacking and the two temporary parks are poorly executed and maintained. Due to physical obstructions along the sea walls, views within the site are generally internalised and are more focused upon urban development to the south than upon the harbour resource. There remains visual permeability within the Central - Wan Chai skyline especially through Statue Square and Harcourt Garden to Wan Chai Gap. Generally, however, the CRIII works area comprises a series of unrelated architectural elements fragmented with numerous physically prominent utility features and temporary civil works. Little or no coherence is derived from the surrounding urban environment nor is advantage taken of the few positive aspects of the site.

 Appendix U

Planning and Development Control Framework

U.1   Metroplan

U.1.1            Metroplan (October 1991) sought to provide a comprehensive framework for the preparation of Development Statements and co-ordination of public and private efforts to implement changes and improvements to the Metropolitan area to the year 2011. The following summarises the relevant key landscape and visual issues within Metroplan proposals.

Open Space Framework

U.1.2            The Metroplan proposals advocate a clearly defined integrated open space system. Metroplan proposes the maximisation of the amenity value of the harbour, shorelines, urban fringes and existing major parks.

Metroplan Urban Design Statement

U.1.3            The Metroplan Urban Design Statement includes the following:

o                                                  a series of broad urban design principles which allow and encourage design/development flexibility and identifies key areas which require a design development approach; and

§                                                                           major contextual elements within Hong Kong Island West, including the scenic backdrop of Victoria Peak ridgeline, Victoria Harbour, (which is the most dominant feature of the study area), landmarks such as Central Plaza, the Bank of China, the Hong Kong Bank, Statue Square and the LegCo Building, and buildings, parks and special use areas are defined as important reference points providing distinctiveness and legibility and which help to structure the urban environment.

U.2   Central & Wan Chai Reclamation Development : Development of Urban Design Parameters (DUDPs)- October 1993

U.2.1            This study followed on from the recommendations of the Central and Wan Chai Reclamation Feasibility Study endorsed by the Land, Development and Planning Committee (LDPC) in January 1991 and was a study of the proposed reclamation project which comprised the Central, Tamar and Exhibition Cells totalling 108 ha.

U.2.2            Design Objectives pertinent to landscape and visual issues included:

o                                                  an emphasis on the special nature and character of each cell by the clear definition of open space, both physically and visually, and by the development of distinctive landscape proposals;

o                                                  ensuring that a legible and directional pedestrian circulation system is integrated within the development, linking together major activity nodes and reinforcing links with adjoining areas; and

o                                                  exploiting the design possibilities inherent in the waterfront, at ground level, as a suitable setting for recreational activities and amenities, during both daytime and evening.

U.2.3            The two relevant visual and landscape concerns are Pedestrian Circulation and the Landscape Framework and Design Criteria. These are briefly reviewed below.

Pedestrian Circulation

U.2.4            "The underlying quality of urban environment is to a large extent, dependent on the design, integration and continuity of its open space and pedestrian circulation system". The DUDPS recognised that all pedestrian and circulation areas have some recreational and amenity value which can be enhanced if these facilities are adequately integrated at different levels as part of a comprehensive open space and pedestrian circulation system.

The Landscape Framework and Design Criteria

U.2.5            The Landscape Framework and Design Criteria provided in DUDPs emphasised integration with the urban design framework and that "wherever possible landscaped open space should provide an appropriate setting for and be defined by adjoining building groups, establishing a framework for the detailed designed disposition of built elements".

U.2.6            Component parts have been identified, their overall role defined and site specific planning and design criteria presented.

U.2.7            The landscape framework and the pedestrian movement system are considered to be inherently linked. District open spaces shall provide a range of passive and active facilities. Major open spaces provide a dual function of creating corridors through the new development linking with existing open and civic spaces and providing a general landscape matrix to create a ‘special identity’.

U.2.8            Major elements of the landscape framework identified in DUDPs include the following:

o                                                  the Statue Square Open Space Corridor;

o                                                  an elevated central corridor within the Tamar site which would provide a direct link between the existing Admiralty complex and the new waterfront;

o                                                  an Exhibition Park creating an open space corridor from the existing urban area to the proposed waterfront;

o                                                  a large open plaza integrated with the proposed residential sector;

o                                                  street level pavement , boulevards and junctions;

o                                                  waterfront open space including promenade; and

o                                                  concourses, plazas and incidental spaces.

 

U.3   Hong Kong Island West Development Statement (HKWDS)

U.3.1            This statement was prepared to translate the broad concepts as laid down in Metroplan. The statement sought to provide a co-ordinated planning and development framework to guide the physical development and improvement of Hong Kong Island West to the year 2011. The scope of the study included the preparation of an Outline Master Development Plan which included sectoral planning frameworks covering, among others, landscape and recreation.

U.3.2            The key visual and landscape issues included the following:

o                                                  the shortfalls in open space within the Hong Kong Island West area;

o                                                  the erosion of the urban skyline and the natural ridgeline resulting from intensification of development and increased building heights;

o                                                  the creation of homogenous ‘canyon development’ with little character or definition;

o                                                  the deterioration of the urban environment (lack of visual interest and a sense of history) through demolition and redevelopment of historic buildings; and

o                                                  the increasing shortfalls in the quality and quantity of district and local open space and recreational facilities.

U.3.3            A description of the planning concept as put forward in the statement includes "a network of parks and recreational spaces connected by pedestrian linkages will be provided within and between each node to facilitate connectivity and to improve the attractiveness of urban form". The statement identifies ‘Solution Spaces’ which will be employed to achieve development objectives and to redress shortfalls in housing, open space and G/IC provision.

Pedestrian Network

U.3.4            HKWDS advocated that "where, practicable, current Government standards or other approved standards should be applied to enhance pedestrian, parking and servicing provision." Three major pedestrian schemes relating to the CRIII were proposed, as follows:

o                                                  a major underground connection between Hong Kong Station and Central MTR (completed);

o                                                  a grade separated walkway system on CWR; and

o                                                  improved cross connections across major trunk roads including Connaught Road Central, Harcourt Road and Gloucester Road.

Visual Aspects

U.3.5            The HKWDS emphasised the need to maintain the existing north/south view corridors between the Victoria Peak ridgelines and Victoria Harbour in the eastern/ central and far western areas of HKIW. In particular, the statement included a Recommended Urban Design and Action Plan. Relevant issues comprise the following:

o                                                  Building Height Control Measures to provide guidelines to control the height of future development which aims to achieve the following:

o                                                  stepped building height profiles rising gradually from the harbour;

o                                                  maintenance of the visual integrity of Victoria Peak and adjacent ridgelines via the preservation of a 20% building free backdrop from Causeway Bay to Sheung Wan as viewed from Kowloon "Star" Ferry. (Refer to Figure J.1).

o                                                  provision of a defined urban skyline which articulates a unique district height profile;

o                                                  definition of view corridors to provide visual permeability;

o                                                  control of building crown features to reduce visual confusion and proliferation of obtrusive structures; and

o                                                  flexibility should be maintained in the building height controls to allow for visual articulation and dynamism of the cityscape.

Recommended Landscape, Open Space and Recreation Action Plan

U.3.6            The main objective of the Recreation Action Plan was to "create and define a hierarchy of open spaces which, where possible, are interconnected to provide continuous pedestrian links via landscaped corridors and open spaces".

U.3.7            Principal elements relevant to the CRIII Study include:

o                                                  Landscape Protection;

o                                                  Open Space & Recreation Provision - an integrated open space framework encompassing a hierarchy of civic open spaces, urban fringe parks, district open spaces, local open spaces, and open space corridors;

o                                                  Major Civic Open Spaces - including an Exhibition Park, Statue Square Open Space Corridor, a Gateway Park and waterfront promenade;

o                                                  District & Local Open Spaces - as previously described;

o                                                  Open Space Corridors - the creation of an integrated network of open spaces will be achieved through progressive redevelopment and development of structured landscape open spaces and waterfront promenade;

o                                                  Pedestrianisation Schemes & Recreational Routes; and

o                                                  Streetscape Improvement Areas - implemented as an on-going activity.

The Next Steps

U.3.8            The HKWDS identified a number of key actions as a series of sectoral ‘next steps’ required to realise planning objectives. These include detailed feasibility studies for open space and pedestrian networks and streetscape improvement; development of digital building height monitoring systems; and feasibility studies for recreational transport routes.

U.3.9            HKWDS also identified significant problems and needs within Hong Kong Island West. The Urban Design, Landscape and Recreation Problems and Needs as stated in HKWDS are listed below.

Problems

U.3.10         The Urban Design, Landscape and Recreation problems identified in the HKWDS include the following:

o                                                  the erosion of the urban skyline;

o                                                  the proliferation of "pencil block" developments;

o                                                  the proliferation of single use (commercial offices) ribbon development along the waterfront east-west roadway arteries;

o                                                  the loss of character/definition/individuality to the Urban District;

o                                                  the overall under-provision of active recreation facilities;

o                                                  the general shortage of district and especially local open space in HKIW, especially in Sheung Wan sub-district;

o                                                  the lack of linkage between open spaces;

o                                                  the poor location, distribution and accessibility to major recreation and parks; and

o                                                  the poor quality of open space.

Needs

U.3.11         The Urban Design, Landscape and Recreation needs identified in the HKWDS include the following:

o                                                  the need to install mechanisms to protect listed buildings;

o                                                  the need to realise the potential of the waterfront for public recreation;

o                                                  the need for the development of an integrated network of open spaces and pedestrian routes to mirror those being developed for the reclamation areas or the development of additional pocket parks within redevelopment areas;

o                                                  the need for the retention of the distinctive backdrop of wooded slopes and the natural ridgeline and areas of notable townscape quality, as well as of prominent landmark features such as the harbour waterfront;

o                                                  the need to protect the natural landscape features and landmarks; institutionalise the protection of Victoria Peak Ridgeline and a 20% building free backdrop of the Ridgeline above Wan Chai, Central and Western when viewed from the Kowloon Peninsula which would require restrictions on development heights in Mid Levels and adjacent areas as well as development on CWCR;

o                                                  the need to protect and conserve existing landscape features and to develop measures to enable their early implementation;

o                                                  the need to provide ample social facilities and district open space to counter a significant shortfall of G/IC facilities; and

o                                                  the need to provide sufficient open space and G/IC facilities within new reclamation where possible.

U.3.12         The preceding issues have been considered where relevant in the formulation of the landscape and visual framework for CRIII.

U.4   The Draft Outline Zoning Plan

U.4.1            The main landscape features defined by the current Draft Outline Zoning Plan (No. S/H24/3), are limited to the Urban Waterfront, the Design Corridors, areas associated with Pedestrian Circulation and other open space. The OZP also provides guidance on building. Another issue relevant to the landscape and visual assessment is building height control. OZP proposals pertinent to landscape assessment are outlined below.

U.4.2            The OZP illustrates and provides broad principles concerning development within the defined planning area. This review has made reference to the plan and the Notes and the Explanatory Statement. The relevant issues are briefly reviewed below:

The Urban Waterfront

U.4.3            The Central Waterfront is considered essential to provide a unifying edge to the city in the form of a large public open space at the waterfront which should be able to provide various activity spaces for the public and to provide much-needed east-west pedestrian connections. The waterfront promenade includes areas reserved for water cooling pumping stations and associated facilities, and a buffer area from the major distributor Road P2 and areas for recreation and leisure uses.

U.4.4            Along the waterfront, focal points would be formed at where the north-south corridors (i.e. the State Square Corridor, Civic Corridor and Arts and Entertainment Corridor) join the waterfront promenade.

 

U.4.5            Towards the centre of the reclamation, the Civic Corridor and the associated civic centre and plaza will form the centre piece of the Central Waterfront.

U.4.6            To the west of the HKCEC Extension, the major activity node west of the HKCEC Extension is focused around a proposed marine basin of about 1.26 hectares. The basin will be fringed by adjacent developments of special architectural design and character. The basin will be constructed as part of the Wan Chai Development Phase II Project.

Design Corridors

U.4.7            The design framework of the Area is structured around three principal design corridors, providing direct and continuous connection to the new waterfront and forming view corridors between developments in the existing urban area and the Victoria Harbour. There are three Design Corridors. These are:

The Statue Square Corridor

U.4.8            The Statue Square Corridor comprises the Statue Square Open Space Corridor and the Historic Corridor, extending across Road P1, Road P2 and the Hong Kong Station Extended Overrun Tunnel. The Statue Square Open Space Corridor is a linear park, extending the full width of the Statue Square to the new waterfront along the central axis of the Hongkong Bank Building.

U.4.9            As part of a comprehensive development area, it is envisaged that the proposed landscaped pedestrian deck abutting a proposed low rise commercial development (or ‘groundscraper’) will become an important open space element and will support a wide range of passive recreational uses.

U.4.10         The Historic Corridor is located to the east of the landscaped pedestrian deck. The Corridor comprises a view corridor extending from the existing urban area to the waterfront promenade. The Corridor is aligned along the central axis of the old Bank of China, the Legislative Council Building and the Cenotaph which are elements evocative of Hong Kong’s history.

The Civic Corridor

U.4.11         An elevated walkway is proposed in the central part of the Civic Corridor. It is intended that the walkway will extend across Harcourt Road from the Admiralty Centre to the proposed Central Government Complex (CGC) at the former Tamar Basin across Harcourt Road. The pedestrian connection would subsequently continue through the CGC site to extend north into a civic square.

The Arts and Entertainment Corridor

U.4.12         The Arts and Entertainment Corridor comprises a network of footbridge links between existing cultural buildings which include the Hong Kong Arts Centre, the Hong Kong Academy for Performing Arts (APA), existing open space (e.g. the Grand Hyatt Sculpture Garden), the APA open air theatre, and, proposed future cultural-oriented developments to the north of the corridor.

 

Building Height

U.4.13         It is intended to preserve a minimum of 20% building-free area to protect the ridgeline of the Victoria Peak as recommended in Metroplan. The "CDA" site is subject to building height restrictions. In general, building heights decrease from south to north towards the harbour. Such control is stipulated with full regard to the development scale of the waterfront and to ensure that some existing signature buildings can still be seen from the major public vantage points at Tsim Sha Tsui and the harbour.

Pedestrian Circulation

U.4.14         In addition to the major open space corridors as mentioned above, other north-south and east-west elevated walkways are proposed within the Area. The pedestrian network comprises elevated walkways and subways to facilitate safe and uninterrupted pedestrian connection.

U.4.15         Such design elements would enhance the Victoria Harbour as a public asset and natural heritage by bringing people to the harbour and harbour to the people.

Open Space

U.4.16         A review of the Open Space zoning provided in the Draft OZP is provided below:

o                                                  As an open space entity the waterfront promenade would become a major tourist attraction and focus for the local community. It would incorporate substantial tree planting and will form a green edge to the reclamation. Refreshment kiosks, small commercial developments, festival markets and facilities for other cultural and recreational activities will be provided to add life and namely to the area.

o                                                  The OZP proposes to retain the existing Memorial Garden. The Garden’s western edge will have to be removed for a tree lined pavement, but it will have an opportunity to be extended north and south.

o                                                  The site in front of the proposed CGC is reserved for an open air civic square. It will provide a popular gathering ground for ceremonial functions and general activities and will form part of the major pedestrian network in the area.

o                                                  Another significant open space is reserved to the north of the Hong Kong Academy for Performing Arts. Elevated walkways are proposed to connect this area to both the existing hinterland and the future waterfront promenade. It will be another important link between the existing and new reclamation area.

U.4.17         The above factors and proposals have been considered in preparing the landscape and visual impact assessments.

Appendix V

Landscape & Visual Impact Assessment for Redesign of HOK
Extended Overrun Tunnel

V.1   Introduction

The contents of Appendix V has been provided by the MTRC Consultant for the EOT Project.

Vol 2_Appendix_V