COVER

TABLE OF CONTENTS

 

 

1.    INTRODUCTION

Purpose of the Manual

Project Description

Environmental Monitoring and Audit Requirements

Project Organisation

 

2.    WATER QUALITY

Water Quality Parameters

Monitoring Equipment

Laboratory Measurement/Analysis

Monitoring Locations

Baseline Monitoring

Impact Monitoring

Post-construction Monitoring

Event and Action Plan for Water Quality

Water Quality Mitigation Measures

 

3.    WASTE MANAGEMENT

Introduction

Waste Control and Mitigation Measures

 

4.    ECOLOGY

Introduction

Ecological Mitigation Measures

 

5.    SITE ENVIRONMENTAL AUDIT

Site Inspection

Compliance with Legal and Contractual Requirements

Environmental Complaints

 

6.    REPORTING

General

Baseline Monitoring Report

Monthly EM&A Reports

Quarterly EM&A Summary Reports

Final EM&A Review Reports

Data Keeping

Interim Notifications of Environmental Quality Limit Exceedances

 

 

APPENDICES

 

Appendix A      Implementation Schedule

Appendix B      Sample Data Sheet for Water Quality Monitoring

Appendix C      Sample Template for the Interim Notification

 

LIST OF TABLES

 

Table 2.1       Proposed Marine Water Quality Monitoring Stations

Table 2.2       Action and Limit Levels for Marine Water Quality

Table 2.3       Event and Action Plan for Marine Water Quality

 

 

LIST OF FIGURES

 

Figure 1.1      Location Plan of Preferred Jetty Option

Figure 1.2      Tentative Construction Programme for Lung Kwu Chau Jetty

Figure 1.3      Project Organization

Figure 2.1      Proposed Marine Water Quality Monitoring Stations