Table 12.1       Implementation Schedule of Air Quality Measures

 

EIA

Ref

EM&A Ref

 

Environmental Protection Measures*

Location / Timing

Implementation Agent

Implementation Stages**

Relevant Legislation & Guidelines

D

C

O

Construction Phase

3.32

2.34

Installation of 2m high solid fences around the construction site of Pumping Station P2.

Work site / during construction

Contractor

 

Ö

 

 

3.34

2.34

Adopting the following good site practices and follow the dust control requirements of the Air Pollution Control (Construction Dust) Regulation:

·          Stockpiles of imported material kept on site should be contained within hoardings, dampened and / or covered during dry and windy weather;

·          Material stockpiled alongside trenches should be covered with tarpaulins whenever works are close to village houses;

·          Water sprays should be used during the delivery and handling of cement, sands, aggregates and the like.

·          Any vehicle used for moving sands, aggregates and construction waste should have properly fitting side and tail boards. Materials should not be loaded to a level higher than the side and tail boards, and should be covered by a clean tarpaulin.

Work site / during construction

All contractors

 

Ö

 

EIAO-TM, APCO,

Air Pollution Control (Construction Dust) Regulation

3.36

Section 2

1 hour and 24 hour dust monitoring and site audit

Designated air monitoring locations / throughout construction period

Contractor/ Environmental Team

 

Ö

 

EM&A Manual

Operation Phase

3.35

2.35

All proposed pumping stations, sequence batching reactor (SBR) feed pump station and sludge dewatering room would be enclosed and the outlet air from these facilities would be properly treated by deodorization facilities with 99.5% odour removal efficiency before discharge via vent pipes. 

Proposed pumping stations &STW / during operation

Contractor/DSD

 

Ö

Ö

 

*            All recommendations and requirements resulted during the course of EIA Process, including ACE and/or accepted public comment to the proposed project.

**            D=Design, C=Construction, O=Operation

N/A          Not applicable