Appendix 4.10 |
|
|
|
|
|
|
|
|
Assumed Powered Mechanical Equipment for Sewer Construction
(With the Use of Quiet Equipment) |
|
|
|
|
|
|
|
|
|
|
|
Breaking up pavement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical
Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Kick Ripper, Saw-and life
method |
R2 |
2 |
103 |
100% |
106 |
106.0 |
106.01 |
|
|
|
|
|
|
|
|
|
|
Excavation of Trench |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical
Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Excavator
(mini) |
BS C.3, item 108 |
2 |
97 |
100% |
100 |
|
|
|
Hand-held breaker |
CNP 024 |
2 |
108 |
100% |
111 |
|
|
|
Air
Compressor |
BS C.7, item 17 |
2 |
90 |
100% |
93 |
|
|
|
Lorry
(mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
111.6 |
111.65 |
|
|
|
|
|
|
|
|
|
|
Installation of Pipes
and Bedding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical
Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Mobile crane (mini) |
BS C.7, item 118 |
2 |
99 |
100% |
102 |
|
|
|
Lorry (mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
103.8 |
103.77 |
|
|
|
|
|
|
|
|
|
|
Backfilling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical
Equipment |
Reference |
No. Items |
SWL/Item |
On-Time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Compactor |
CNP 050 |
2 |
105.0 |
100% |
108.0 |
108.0 |
108.01 |
|
|
|
|
|
|
|
|
|
|
Reinstating Road Surface |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical
Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Lorry (mini) |
BS C.8, item 25 |
2 |
96 |
100% |
99 |
|
|
|
Concrete
mixer (electric) |
CNP 045 |
2 |
96 |
100% |
99 |
|
|
|
Air
Compressor |
BS C.7, item 24 |
2 |
95 |
100% |
98 |
|
|
|
Vibratory poker,
hand-held (Electric) |
BS 5228, Table C.6, item 40 |
2 |
98 |
100% |
101 |
105.4 |
105.42 |
|
Note: |
|
|
|
|
|
|
|
|
BS BS5228 (1997) Part 1 Noise and Vibration
Control on Construction and open sites |
|
|
|
|
|
R2 -
Commercially available quiet concrete demolition method in Hong Kong |
|
|
|
|
|
|
DREDGING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Derrick barge |
CNP 061 |
1 |
104 |
100% |
104 |
|
|
|
Dredger, grab |
CNP 063 |
1 |
112 |
100% |
112 |
4 |
112.64 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appendix 4.3
|
|
Assumed Powered
Mechanical Equipment for Submarine Outfall Construction (Unmitigated) |
|
|
|
|
|
|
|
|
|
|
Erection of Steel Working Platflorm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Stage 1: Setting up Steel
Working Platform |
|
|
|
|
|
|
|
|
Air Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
|
Percussion
Drill rig, equiped with down the hole hammer |
CNP 164 |
1 |
115 |
100% |
115 |
|
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
|
Crane |
CNP 048 |
1 |
112 |
100% |
112 |
|
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
117.7 |
117.69 |
|
Stage 2: Grouting |
|
|
|
|
|
|
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
|
Grout Pump |
CNP 106 |
1 |
105 |
100% |
105 |
109.8 |
109.76 |
|
Stage 3: Installation of Steel Casing in Rock |
|
|
|
|
|
|
|
Air Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
|
Percussion
Drill rig, equiped with ODEX |
CNP 164 |
1 |
115 |
100% |
115 |
115.3 |
115.33 |
|
Note:
Stages 1, 2 and 3 would not be conducted concurrently |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Erection of Scaffold |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
|
Vibrating Hammer |
CNP 172 |
1 |
115 |
100% |
115 |
|
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
6 |
116.07 |
|
|
|
|
|
|
|
|
|
|
Drilling and Installation of HDPE Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
|
Horizontal Drilling System1 |
CNP 101 |
1 |
108 |
100% |
108 |
111.6 |
|
|
Direct-drive mixing system1 |
CNP 101 |
1 |
108 |
100% |
108 |
|
Reclaimer2 |
CNP 282 |
1 |
103 |
100% |
103 |
|
Note: |
|
|
|
|
|
|
|
|
1 Based on diesel generator |
|
|
|
|
|
|
|
|
2 Based on water pump |
|
|
|
|
|
|
|
|
BS
BS5228 (1997) Part 1 Noise and Vibration Control on Construction and
open sites |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appendix 4.4 |
|
|
|
|
|
|
|
|
Assumed
Operation Equipment for STW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
Screening* |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
dB(A) |
SWL dB(A) |
dB(A) |
dB(A) |
|
Submersible water pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
|
Equalisation transfer pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
|
Effluent lift pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
|
Sludge recycling pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
|
Sludge wasty pump |
CNP 283 |
2 |
85 |
|
88 |
|
|
|
Sludge pump |
CNP 283 |
1 |
85 |
|
85 |
|
|
|
Air blower |
estimate1 |
1 |
102 |
|
102 |
|
|
|
Filter press |
estimate1 |
1 |
94 |
|
94 |
|
|
|
Deodouriser |
estimate1 |
1 |
79 |
|
79 |
10 |
103.28 |
|
|
|
|
|
|
|
|
|
|
Assumed Operation Equipment for Pumping
Stations P1a, P1b and P2 (Unmitigated) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
Screening* |
Sub-total |
Total SWL |
Total SWL |
|
(PME) |
|
|
dB(A) |
dB(A) |
SWL dB(A) |
dB(A) |
dB(A) |
|
Submersible water pump |
CNP 283 |
1 |
85 |
10 |
75 |
|
|
|
Deodouriser1 |
R1 |
1 |
79 |
|
79 |
80.5 |
80.46 |
|
|
|
|
|
|
|
|
|
|
Note: |
|
|
|
|
|
|
|
|
*
Assume 10 dB(A) noise reduction for equipment placing in enclosure |
|
|
|
|
|
|
1 Estimated SWLs of the equipment obtained
from contractors |
|
|
|
|
|
|
1
Based on fan with 1700m3/hr flowrate |
|
|
|
|
|
|
|
R1
Good Practices on Ventilation System Noise Control (EPD) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|