Agreement No. CE
87/2001 (CE)
FURTHER
DEVELOPMENT OF TSEUNG KWAN O
FEASIBILITY STUDY
ENVIRONMENTAL
IMPACT ASSESSMENT
Volume 2 - Figures
Figure 1.1 Elements of the Project
Figure 2.1 Theme
1 – No Further Reclamation
Figure 2.2 Theme 2
– Maximize Recreation Potential-Recreation and Water Sports
Figure 2.3 Theme
3 – Maximize Development with Water Frontage-Landscape Crescent
Figure 2.4 Theme 4
– Maximize Housing and Recreation Development
Figure
2.5 WCR Coastal Alignment
under Agreement CE 46/96
Figure
2.6 Refinement of WCR
Coastal Alignment –Dual-2 Configuration (Agreement NTE 5/99)
Figure
2.7 WCR Original Tunnnel
Alignment (Agreement NTE 1/2000)
Figure
2.8 Layout Plan of WCR
Coastal Alignment
Figure
2.9 Recommended Westerm
Coast Road Tunnel Alignment
Figure
2.10 Possible Locations of
Toll Plaza at TKO (Scheme 1 and 2)
Figure
2.11 Possible Locations of
Toll Plaza at TKO (Scheme 3 and 4)
Figure
2.12 Cross Bay Link – Route
Alignment Option
Figure
2.13 Alternative Alignment
CBL – Scheme A (Bridge Arrangement)
Figure
2.14 Alternative Alignment
CBL – Scheme B (Tunnel Arrangement)
Figure
2.15 Concept Plan for TKO
Further Development Area
Figure
2.16 Tiu Keng Leng Layout
Plan
Figure
2.17 Town Centre South
Layout Plan
Figure
2.18 Pak Shing Kok Layout
Plan
Figure
2.19 Recommended Western
Coast Road Tunnel Alignment
Figure 2.20-2.26 Recommended Western Coast Road General
Layout (Fig 2.20, Fig 2.21,
Fig 2.22, Fig 2.23, Fig 2.24, Fig 2.25, Fig 2.26)
Figure
2.27 Recommended Cross Bay
Link Bridge Alignment
Figure 2.28-2.31 Recommended Cross Bay Link General
Layout (Fig 2.28, Fig 2.29,
Fig 2.30, Fig 2.31)
Figure
2.33 Road P2 General Layout
Figure
2.34 Road P2 and Road D4
Flyover – General Layout
Figure
2.35 Surcharge Layout Plan
Figure
2.37 Western Coast Road
Development Package
Figure
2.38 Cross Bay Link
Development Package
Figure
2.39 Road P2 and Road D4
Flyover Development Package
Figure 3.1a Locations of Representative Air
Sensitive Receivers (Kowloon Area) (Sheet 1,
2)
Figure 3.1b Locations of Representative Air
Sensitive Receivers (TKO Area) (Sheet 1, 2, 3, 4, 5, 6, 7)
Figure 3.2 Locations of Chimneys at
Kowloon Area (Sheet 1, 2)
Figure 3.3 Locations of the EHC Ventilation Exhaust Building and Flaring Plants at Sai Tso Wan & TKO Landfill (Sheet 1, 2)
Figure 3.15 Contours of Hourly Average
Nitrogen Dioxide Concentrations in μg/m3 at 1.5m Above Ground Level (TKO
Area) (Sheet 1, 2, 3, 4)
Figure 3.16 Contours of 24-Hour Average
Nitrogen Dioxide Concentrations in μg/m3 at 1.5m Above Ground Level (TKO
Area) (Sheet 1, 2, 3, 4)
Figure 3.17 Contours of 24-Hour Average
Respirable Suspended Particulate Concentrations in μg/m3 at 1.5m Above
Ground Level (TKO Area) (Sheet 1, 2, 3, 4)
Figure
4.1 300M Study Area from
the Project Boundary
Figure
4.6a Recommended Traffic
Noise Mitigation Measures (Kowloon Area) (Sheet 1 of 3)
Figure
4.6b Recommended Traffic
Noise Mitigation Measures (Kowloon Area) (Sheet 2 of 3)
Figure
4.6c Recommended Traffic
Noise Mitigation Measures (Kowloon Area) (Sheet 3 of 3)
Figure
4.7a Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 1 of 7)
Figure
4.7b Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 2 of 7)
Figure
4.7c Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 3 of 7)
Figure
4.7d Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 4 of 7)
Figure
4.7e Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 5 of 7)
Figure
4.7f Recommended Traffic Noise
Mitigation Measures (TKO Area) (Sheet 6 of 7)
Figure
4.7g Recommended Traffic
Noise Mitigation Measures (TKO Area) (Sheet 7 of 7)
Figure
5.1 Drainage Channel
Systems at Tseung Kwan O
Figure
5.1a Proposed Secondary
Contact Recreation Zone
Figure
5.1b Proposed Sewage
Pumping Station for TKO Stage I Landfill
Figure
5.2 Marine Water and
Ecological Sensitive Receivers
Figure
5.3 Locations of Water
Quality Monitoring Stations
Figure
5.4a Cross Bay Link Bridge
Alignment
Figure 5.4b Cross
Bay Link General Layout – Sheet 1 of 3
Figure 5.4b Cross
Bay Link General Layout – Sheet 2 of 3
Figure 5.4b Cross
Bay Link General Layout – Sheet 3 of 3
Figure
5.5a Details of Dolphin For
Pier Type E and F
Figure
5.5b Dolphin Details for
Pier Type G
Figure
5.5c Fender Details for
Pile Caps of Bridge Piers
Figure
5.6 Coastline
Configuration for Scenario 2 (Ultimate Scenario with no WCR and CBL)
Figure
5.7 Emergency Bypass
Locations
Figure
5.8a Assumed Locations of
Spill Sources and Nearby Sensitive Receivers
Figure
5.8b Zoom-in Plot of
Assumed Locations of Spill Sources
Figure
5.9 Locations of Cross
Sections
Figure
5.10 Proposed Drainage
Works at Town Centre South
Figure
6.1 Sewerage Catchment
Area / Existing and Committed Sewerage Infrastructure
Figure
6.2 PVS Zone Boundary in
TKO
Figure
6.3 Proposed Sewage
Disposal Arrangement for Recreational Development in TKO Stage I Landfill
Figure
6.4 Plant Layout of Tseung
Kwan O Preliminary Treatment Works
Figure 6.5-6.7 Existing Sewerage Model Network (Fig 6.5, Fig 6.6, Fig 6.7)
Figure
6.8 Proposed Works at Town
Centre South
Figure
6.9 Proposed Works at Pak
Shing Kok
Figure 6.10-6.12 Performance Assessment of the Existing
Sewage System Under Baseline Condition (Fig 6.10, Fig 6.11, Fig 6.12)
Figure 6.13-6.15 Performance Assessment of the Proposed
Sewage System Under SIA Condition (Fig 6.13, Fig 6.14, Fig 6.15)
Figure 6.16-6.18 Recommended Sewerage Improvement Works (Fig 6.16, Fig 6.17, Fig 6.18)
Figure
6.19 Sewerage Master Plan
Figure
7.1a Habitat Map for E-WCR Assessment
Area
Figure 7.1b Habitat
Map for W-WCR Assessment Area (Sheet 1 of 2)
Figure 7.1b Habitat
Map for W-WCR Assessment Area (Sheet 2 of 2)
Figure 7.1c Habitat
Map for PSK Assessment Area (Sheet 1 of 2)
Figure 7.1c Habitat
Map for PSK Assessment Area (Sheet 2 of 2)
Figure
7.2 Proposed Channel
Connection At E-WCR Assessment Area
Figure
8.1 Key Marine Ecological
Resources
Figure
8.2 Representative
Photographs of Marine Habitats and Noteable Species
Figure
8.3 Location of Marine
Ecological Surveys
Figure
10.4.1 Extract of Draft
Outline Zoning Plan No. S/TKO/14 - Tseung Kwan O
Figure
10.4.3 Extract of Outline
Zoning Plan No. S/K14S/10 - Kwun Tong South
Figure
10.4.4 Extract of Outline
Zoning Plan No. S/K21/3 - Kai Tak South
Figure
10.4.5 Master Urban Design
Plan
Figure
10.4.6 Building Height Profile
Figure
10.4.7 Photomontage of New
Development Area
Figure
10.6.1 Landscape
Resources (Sheet 1 of 2)
Figure
10.6.2 Landscape
Resources (Sheet 2 of 2)
Figure
10.6.3 Landscape Character
Areas
Figure 10.6.4 A-M Landscape Resources – Photos (13 Sheets) (Sheet a, b, c, d, e, f, g, h, I, j, k, l, m)
Figure 10.6.4 N-T Landscape Character Areas - Photos (7
Sheets) (Sheet n, o, p, q, r, s, t)
Figure
10.6.5 DP1 - Western Coast
Road - Study Area Photo views
Figure
10.6.6 DP2 - Cross Bay Link -
Study Area Photo views
Figure 10.6.7 DP3
- Road P2 - Study Area Photo views
Figure
10.6.8 Oblique Aerial Photo of
Tseung Kwan O
Figure
10.6.9a Schedule 3 - Zone of
Visual Influence and VSRs for Construction Phase (Sheet 1 of 2)
Figure
10.6.9b Schedule 3 - Zone of
Visual Influence and VSRs for Construction Phase (Sheet 2 of 2)
Figure
10.6.9c Schedule 3 - Zone of
Visual Influence and VSRs for Operation Phase (Sheet 1 of 2)
Figure
10.6.9d Schedule 3 - Zone of
Visual Influence and VSRs for Operation Phase (Sheet 2 of 2)
Figure
10.6.12 DP3 - Road P2- Zone of
Visual Influence and VSRs for Construction and Operation Phase
Figure
10.7.1a Schedule 3 - Residual
Landscape Resource Impacts - Construction Phase (Sheet 1 of 2)
Figure
10.7.1b Schedule 3 - Residual
Landscape Resource Impacts - Construction Phase (Sheet 2 of 2)
Figure
10.7.1c Schedule 3 - Residual
Landscape Character Impacts - Construction Phase
Figure
10.7.1d Schedule 3 - Residual
Landscape Resource Impacts - Operation Phase (Sheet 1 of 2)
Figure
10.7.1e Schedule 3 - Residual
Landscape Resource Impacts - Operation Phase (Sheet 2 of 2)
Figure
10.7.1f Schedule 3 - Residual
Landscape Character Impacts - Operation Phase
Figure
10.7.2a DP1 - Western Coast Road
- Residual Landscape Resource Impacts - Construction Phase
Figure
10.7.2b DP1 - Western Coast Road
- Residual Landscape Character Impacts - Construction Phase
Figure
10.7.2c DP1 - Western Coast Road
- Residual Landscape Resource Impacts - Operation Phase
Figure
10.7.2d DP1 - Western Coast Road
- Residual Landscape Character Impacts - Operation Phase
Figure
10.7.3a DP2 - Cross Bay Link -
Residual Landscape Resource Impacts - Construction Phase
Figure
10.7.3b DP2 - Cross Bay Link -
Residual Landscape Character Impacts - Construction Phase
Figure
10.7.3c DP2 - Cross Bay Link -
Residual Landscape Resource Impacts - Operation Phase
Figure
10.7.3d DP2 - Cross Bay Link -
Residual Landscape Character Impacts - Operation Phase
Figure
10.7.4a DP3 - Road P2 - Residual
Landscape Resource Impacts - Construction Phase
Figure
10.7.4b DP3 - Road P2 - Residual
Landscape Character Impacts - Construction Phase
Figure
10.7.4c DP3 - Road P2 - Residual
Landscape Resource Impacts - Operation Phase
Figure
10.7.4d DP3 - Road P2 - Residual
Landscape Character Impacts - Operation Phase
Figure
10.8.1a Schedule 3 - Residual Visual
Impacts - Construction Phase (Sheet 1 of 2)
Figure
10.8.1b Schedule 3 - Residual
Visual Impacts - Construction Phase (Sheet 2 of 2)
Figure
10.8.1c Schedule 3 - Residual
Visual Impacts - Operation Phase (Sheet 1 of 2)
Figure
10.8.1d Schedule 3 - Residual
Visual Impacts - Operation Phase (Sheet 2 of 2)
Figure
10.8.2c DP1 - Western Coast Road
- Residual Visual Impacts - Operation Phase (Sheet 1 of 2)
Figure
10.8.2d DP1 - Western Coast Road
- Residual Visual Impacts - Operation Phase (Sheet 2 of 2)
Figure
10.8.3a DP2 - Cross Bay Link -
Residual Visual Impacts - Construction Phase (Sheet 1 of 2)
Figure
10.8.3b DP2 - Cross Bay Link -
Residual Visual Impacts - Construction Phase (Sheet 2 of 2)
Figure
10.8.3c DP2 - Cross Bay Link - Residual
Visual Impacts - Operation Phase (Sheet 1 of 2)
Figure
10.8.3d DP2 - Cross Bay Link -
Residual Visual Impacts - Operation Phase (Sheet 2 of 2)
Figure
10.8.4a DP3 - Road P2 - Residual
Visual Impacts - Construction Phase
Figure
10.8.4b DP3 - Road P2 - Residual
Visual Impacts - Operation Phase
Figure
10.9.1a Schedule 3 - Mitigation
Measures - Operation Phase (Tiu Keng Leng)
Figure
10.9.1b Schedule 3 - Mitigation
Measures - Operation Phase (Town Centre South)
Figure
10.9.1c Schedule 3 - Mitigation
Measures - Operation Phase (Pak Shing Kok)
Figure 10.9.2a DP1
- Western Coast Road - Mitigation Measures - Operation Phase (Sheet 1 of 2)
Figure 10.9.2b DP1
- Western Coast Road - Mitigation Measures - Operation Phase (Sheet 2 of 2)
Figure
10.9.3 DP2 - Cross Bay
Link - Mitigation Measures- Operation
Phase
Figure
10.9.4 DP3 - Road P2 -
Mitigation Measures- Operation Phase
Figure
10.10.1 Schedule 3 -
Photomontage - VP1 - Ocean Shores
Figure
10.10.2 Schedule 3 -
Photomontage - VP2 - Area 86 MTR Depot Site
Figure
10.10.3 Schedule 3 -
Photomontage - VP3 - Oscar by the Sea
Figure
10.10.4 Schedule 3 -
Photomontage - VP4 - Silverstrand
Figure
10.10.5 Schedule 3 -
Photomontage - VP5 - Junk Bay
Figure 10.10.6 Schedule 3 - Photomontage - VP6 - Heng Fa Chuen
Figure
10.10.7 Schedule 3 -
Photomontage - VP7 - Sceneway Gardens
Figure
10.10.8 Schedule 3 -
Photomontage - VP8 - Lei King Wan
Figure
10.10.9 Schedule 3 -
Photomontage - VP9 - Eastern Channel
Figure
10.11.1 DP1 - Western Coast Road
- Photomontage - VP1 - Ocean Shores
Figure
10.11.2 DP1 - Western Coast Road
- Photomontage - VP2 - Area 86 MTR Depot Site
Figure
10.11.3 DP1 - Western Coast Road
- Photomontage - VP3 - Oscar by the Sea
Figure
10.11.4 DP1 - Western Coast Road
- Photomontage - VP5 - Junk Bay / Area 77 Landfill
Figure
10.11.5 DP1 - Western Coast Road
- Photomontage - VP6 - Heng Fa Chuen
Figure
10.11.6 DP1 - Western Coast Road
- Photomontage - VP7 - Sceneway Gardens
Figure
10.11.7 DP1 - Western Coast Road
- Photomontage - VP8 - Lei King Wan
Figure
10.12.1 DP2 - Cross Bay Link -
Photomontage - VP1 - Ocean Shores
Figure
10.12.2 DP2 - Cross Bay Link -
Photomontage - VP2 - Area 86 MTR Depot Site
Figure
10.12.3 DP2 - Cross Bay Link -
Photomontage - VP3 - Oscar by the Sea
Figure
10.12.4 DP2 - Cross Bay Link -
Photomontage - VP5 - Junk Bay / Area 77 Landfill
Figure
10.12.5 DP2 - Cross Bay Link -
Photomontage - VP6 - Heng Fa Chuen
Figure
10.12.6 DP2 - Cross Bay Link -
Photomontage - VP10 - Waterfront Park (Future)
Figure
10.13.1 DP3 - Road P2 -
Photomontage - VP1 - Ocean Shores
Figure
10.13.2 DP3 - Road P2 -
Photomontage - VP11 - Park Central in Area 57
Figure
10.13.3 DP3 - Road P2 -
Photomontage - VP12 - Site 68A
Figure
11.1 Location Plan for
Ground Investigations of Marine Sediment
Figure
13.1 Locations of
Identified Anomalies
Figure
13.2 Locations of Cha Kwo
Ling Tin Hau Temple
Figure
14.1 Locations of
Monitoring Wells at Tseung Kwan O Stage I Landfill
Figure
14.2 Locations of Monitoring
Wells at Tseung Kwan O Stage II/III Landfill
Figure
14.3 Locations of
Monitoring Wells at Sai Tso Wan Landfill
Figure 14.4a-b Geology Map for Tseung Kwan O Stage I
& II/III Landfill (Fig 14.4a, Fig 14.4b)
Figure 14.5a-b Cross Section A-A between the
Development Site and Tseung Kwan O Stage I Landfill (Fig
14.5a, Fig 14.5b)
Figure 14.6a-b Cross Section B-B between the
Development Site and Tseung Kwan O Stage II/III Landfill (Fig
14.6a, Fig 14.6b)
Figure 14.7a-b Geology Map for Sai Tso Wan Landfill
(Fig 14.7a, Fig 14.7b)
Figure 14.8a-b Cross Section C-C between the
Development Site and Sai Tso Wan Landfill (Fig 14.8a,
Fig 14.8b)
Figure
15.1 Societal Risk
Guidelines Under Annex 4 of EIAO TM