Anticipated Construction Plant Inventory
Location Plant Team Ref. Activities Plant CNP/BS5228 ref. No. of PME Barrier Basic SWL SWL Vlookup SWL
Location B B-1 Transportation of plants Crawler crane CNP 048 1 112 112 1 124.2893 1.58E+11
Temporary platform/jetty Barge mounted crane CNP 048 1 112 112 1.58E+11
Lorry CNP 141 1 112 112 3.16E+09 124.2893 1.58E+11
  Flat-bed barge CNP 061 1 104 104 2.51E+10
  Total SWL =  117 5.01E+11
  B-2 Rock breaking Excavator fitted with hydraulic rock breaker (52kW) C8-12 1 106 106 1E+09 3.98E+10
  Total SWL =  106 116 3.98E+10
  B-3 Piling, Excavation, Soil nailing Mini-pile CNP 166 1 100 100 1E+09 1E+10
  CNP 081 1 112 112 3.99E+09 1.58E+11
  Drill rig, rotary type (diesel) note (1) 1 110 110 6.31E+10 1E+11
  Crawler crane CNP 048 1 112 112 6.31E+10 1.58E+11
  Total SWL =  113 4.27E+11
  B-4 Concreting Concrete pump, stationary/lorry mounted CNP 047 1 109 109 6.31E+10 7.94E+10
  Concrete lorry mixer CNP 044 1 109 109 7.96E+10 7.94E+10
  Compactor, vibratory CNP 050 1 105 105 7.94E+10 3.16E+10
  Flat-bed barge CNP 061 1 104 104 7.94E+10 2.51E+10
  Total SWL =  115 2.16E+11
  B-5 Transportation of turbine  Conveyor belt CNP 041 1 90 90 1E+09
  components, erection of temporary Flat-bed barge CNP 061 1 104 104 2.51E+10
  bridge Barge mounted crane CNP 048 1 112 112 1.58E+11
  Crawler crane CNP 048 1 112 112 1.58E+11
  Total SWL =  115 3.43E+11
   
Wind Turbine Site Crawler crane CNP 048 2 112 115 3.16E+09 124.6346 3.17E+11
  Mobile crane CNP 048 2 112 115 6.31E+10 3.17E+11
  Concrete pump, stationary/lorry mounted CNP 047 1 109 109 7.96E+10 7.94E+10
  Concrete lorry mixer CNP 044 1 109 109 1E+09 7.94E+10
  Pre-bored H-piling CNP 164 1 115 115 3.16E+11
  Compactor, vibratory CNP 050 1 105 105 3.16E+10
  Excavator/loader, wheeled/tracked CNP 081 1 112 112 1.58E+11
  Compactor, vibratory CNP 050 1 105 105 3.16E+10
  Conveyor belt CNP 041 1 90 90 1E+09
  Lorry CNP 141 2 112 115 7.94E+10 3.17E+11
  Dump truck, gross vehicle weight>38ton CNP 067 1 117 117 5.01E+11
  Total SWL =  123 2.91E+12 2.15E+12
   
Along route (2) R-1a Slope cutting - rock breaking Excavator, mini-robot mounted note (1) 1 94 94 2.51E+09
  Excavator fitted with hydraulic rock breaker (52kW) C8-12 1 106 106 3.98E+10
  Total SWL =  106 4.23E+10
  R-1b Slope cutting - site clearence Excavator, mini-robot mounted note (1) 1 94 94 2.51E+09
  Lorry, 5.5ton<gross vehicle weight<38ton note (1) 1 105 105 3.16E+10
  Total SWL =  105 3.41E+10
  R-2 Erection of temporary platform Wheeled crane C7-102 1 103 103 2E+10
    1
  Total SWL =  103 2E+10
  R-3a Backfilling - compacting Vibratory roller C3-115 1 102 102 1.58E+10
  Lorry, 5.5ton<gross vehicle weight<38ton note (1) 1 105 105 3.16E+10
  Total SWL =  107 4.75E+10
  R-3b Backfilling - excavation Excavator, mini-robot mounted note (1) 1 94 94 2.51E+09
  Lorry, 5.5ton<gross vehicle weight<38ton note (1) 1 105 105 3.16E+10
  Total SWL =  105 3.41E+10
  R-3c Backfilling - site clearence Dump truck, 5.5ton<gross vehicle weight<38ton note (1) 1 105 105 3.16E+10
      Total SWL =  105 2.91E+12 3.16E+10
     
Note (1)  SWL refer to the document prepared by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )  6.31E+10
(2) Mitigated with quiet construction plant and noise barriers 7.96E+09
1E+09
7.94E+10
3.99E+09
6.31E+10
5.02E+10
1.26E+11
1E+09
1.58E+10
7.54E+10
2.51E+09
1.27E+12
1.76E+12
3.17E+10 122.2456
7.96E+09
1E+09
3.99E+09
7.94E+09
6.31E+10
5.02E+10
1.26E+11
7.54E+10
1E+10
1.27E+12
1.58E+10
1.58E+10
1.68E+12
3.17E+11 126.8771
7.96E+10 126.8771
1E+09
3.99E+10
7.94E+10
6.31E+10
5.02E+10
1.26E+11
7.54E+11
1E+11
1.27E+12
1.58E+11
1.58E+11
4.87E+12
1.58E+11 124.2337
1.58E+11
6.31E+10
3.16E+10
7.96E+10
1E+09
7.94E+10
2E+10
7.94E+10
7.94E+10
6.31E+10
2.51E+10
6.31E+10
1.58E+11
7.54E+11
2E+11
6.34E+11
3.16E+11
2E+10
1.58E+11
2.65E+12
3.17E+11 124.5098
1.58E+11
6.31E+10
3.16E+10
7.96E+10
1E+09
2E+10
2.51E+10
6.31E+10
1.58E+11
7.54E+11
2.51E+10
6.34E+11
3.16E+11
2E+10
1.58E+11
2.82E+12