Anticipated Construction
Plant Inventory |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location |
Plant Team Ref. |
Activities |
Plant |
CNP/BS5228 ref. |
No. of PME |
Barrier |
Basic SWL |
SWL |
|
Vlookup SWL |
|
Location
B |
B-1 |
Transportation of plants |
Crawler crane |
CNP 048 |
1 |
|
112 |
112 |
1 |
124.2893 |
|
1.58E+11 |
Temporary
platform/jetty |
|
Barge mounted crane |
CNP 048 |
1 |
|
112 |
112 |
|
|
1.58E+11 |
|
Lorry |
CNP 141 |
1 |
|
112 |
112 |
3.16E+09 |
124.2893 |
|
1.58E+11 |
|
|
Flat-bed barge |
CNP 061 |
1 |
|
104 |
104 |
|
|
2.51E+10 |
|
|
|
Total
SWL = |
117 |
|
|
5.01E+11 |
|
B-2 |
Rock breaking |
Excavator
fitted with hydraulic rock breaker (52kW) |
C8-12 |
1 |
|
106 |
106 |
1E+09 |
|
|
3.98E+10 |
|
|
|
Total
SWL = |
106 |
|
116 |
|
3.98E+10 |
|
B-3 |
Piling, Excavation, Soil nailing |
Mini-pile |
CNP 166 |
1 |
|
100 |
100 |
1E+09 |
|
|
1E+10 |
|
|
|
CNP 081 |
1 |
|
112 |
112 |
3.99E+09 |
|
|
1.58E+11 |
|
|
Drill rig, rotary type (diesel) |
note (1) |
1 |
|
110 |
110 |
6.31E+10 |
|
|
1E+11 |
|
|
Crawler crane |
CNP 048 |
1 |
|
112 |
112 |
6.31E+10 |
|
|
1.58E+11 |
|
|
|
Total
SWL = |
113 |
|
|
4.27E+11 |
|
B-4 |
Concreting |
Concrete
pump, stationary/lorry mounted |
CNP 047 |
1 |
|
109 |
109 |
6.31E+10 |
|
|
7.94E+10 |
|
|
Concrete
lorry mixer |
CNP 044 |
1 |
|
109 |
109 |
7.96E+10 |
|
|
7.94E+10 |
|
|
Compactor,
vibratory |
CNP 050 |
1 |
|
105 |
105 |
7.94E+10 |
|
|
3.16E+10 |
|
|
Flat-bed barge |
CNP 061 |
1 |
|
104 |
104 |
7.94E+10 |
|
|
2.51E+10 |
|
|
|
Total
SWL = |
115 |
|
|
2.16E+11 |
|
B-5 |
Transportation of turbine |
Conveyor
belt |
CNP 041 |
1 |
|
90 |
90 |
|
|
1E+09 |
|
|
components, erection of
temporary |
Flat-bed barge |
CNP 061 |
1 |
|
104 |
104 |
|
|
2.51E+10 |
|
|
bridge |
Barge mounted crane |
CNP 048 |
1 |
|
112 |
112 |
|
|
1.58E+11 |
|
|
Crawler crane |
CNP 048 |
1 |
|
112 |
112 |
|
|
1.58E+11 |
|
|
|
Total
SWL = |
115 |
|
|
3.43E+11 |
|
|
|
|
|
|
|
Wind
Turbine Site |
|
Crawler crane |
CNP 048 |
2 |
|
112 |
115 |
3.16E+09 |
124.6346 |
|
3.17E+11 |
|
|
Mobile crane |
CNP 048 |
2 |
|
112 |
115 |
6.31E+10 |
|
|
3.17E+11 |
|
|
Concrete
pump, stationary/lorry mounted |
CNP 047 |
1 |
|
109 |
109 |
7.96E+10 |
|
|
7.94E+10 |
|
|
Concrete
lorry mixer |
CNP 044 |
1 |
|
109 |
109 |
1E+09 |
|
|
7.94E+10 |
|
|
Pre-bored H-piling |
CNP 164 |
1 |
|
115 |
115 |
|
|
3.16E+11 |
|
|
Compactor,
vibratory |
CNP 050 |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
Excavator/loader,
wheeled/tracked |
CNP 081 |
1 |
|
112 |
112 |
|
|
1.58E+11 |
|
|
Compactor,
vibratory |
CNP 050 |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
Conveyor
belt |
CNP 041 |
1 |
|
90 |
90 |
|
|
1E+09 |
|
|
Lorry |
CNP 141 |
2 |
|
112 |
115 |
7.94E+10 |
|
|
3.17E+11 |
|
|
Dump
truck, gross vehicle weight>38ton |
CNP 067 |
1 |
|
117 |
117 |
|
|
5.01E+11 |
|
|
|
Total
SWL = |
123 |
2.91E+12 |
|
|
2.15E+12 |
|
|
|
|
|
|
|
Along
route (2) |
R-1a |
Slope cutting - rock breaking |
Excavator, mini-robot mounted |
note (1) |
1 |
|
94 |
94 |
|
|
2.51E+09 |
|
|
Excavator
fitted with hydraulic rock breaker (52kW) |
C8-12 |
1 |
|
106 |
106 |
|
|
3.98E+10 |
|
|
|
Total
SWL = |
106 |
|
|
4.23E+10 |
|
R-1b |
Slope cutting - site clearence |
Excavator, mini-robot mounted |
note (1) |
1 |
|
94 |
94 |
|
|
2.51E+09 |
|
|
Lorry, 5.5ton<gross vehicle
weight<38ton |
note (1) |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
|
Total
SWL = |
105 |
|
|
3.41E+10 |
|
R-2 |
Erection of temporary platform |
Wheeled
crane |
C7-102 |
1 |
|
103 |
103 |
|
|
2E+10 |
|
|
|
|
|
|
|
|
1 |
|
|
|
Total
SWL = |
103 |
|
|
2E+10 |
|
R-3a |
Backfilling - compacting |
Vibratory
roller |
C3-115 |
1 |
|
102 |
102 |
|
|
1.58E+10 |
|
|
Lorry, 5.5ton<gross vehicle
weight<38ton |
note (1) |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
|
Total
SWL = |
107 |
|
|
4.75E+10 |
|
R-3b |
Backfilling - excavation |
Excavator, mini-robot mounted |
note (1) |
1 |
|
94 |
94 |
|
|
2.51E+09 |
|
|
Lorry, 5.5ton<gross vehicle
weight<38ton |
note (1) |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
|
Total
SWL = |
105 |
|
|
3.41E+10 |
|
R-3c |
Backfilling - site clearence |
Dump truck, 5.5ton<gross
vehicle weight<38ton |
note (1) |
1 |
|
105 |
105 |
|
|
3.16E+10 |
|
|
|
|
Total
SWL = |
105 |
2.91E+12 |
|
|
3.16E+10 |
|
|
|
|
|
|
Note (1) |
SWL
refer to the document prepared by the Noise Control Authority
(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf
) |
6.31E+10 |
|
|
(2) |
Mitigated with quiet
construction plant and noise barriers |
|
7.96E+09 |
|
|
|
1E+09 |
|
|
|
7.94E+10 |
|
|
|
3.99E+09 |
|
|
|
6.31E+10 |
|
|
|
5.02E+10 |
|
|
|
1.26E+11 |
|
|
|
1E+09 |
|
|
|
1.58E+10 |
|
|
|
7.54E+10 |
|
|
|
2.51E+09 |
|
|
|
1.27E+12 |
|
|
|
1.76E+12 |
|
|
|
|
3.17E+10 |
122.2456 |
|
|
7.96E+09 |
|
|
|
1E+09 |
|
|
|
3.99E+09 |
|
|
|
7.94E+09 |
|
|
|
6.31E+10 |
|
|
|
5.02E+10 |
|
|
|
1.26E+11 |
|
|
|
7.54E+10 |
|
|
|
1E+10 |
|
|
|
1.27E+12 |
|
|
|
1.58E+10 |
|
|
|
1.58E+10 |
|
|
|
1.68E+12 |
|
|
|
|
3.17E+11 |
126.8771 |
|
|
7.96E+10 |
126.8771 |
|
|
1E+09 |
|
|
|
3.99E+10 |
|
|
|
7.94E+10 |
|
|
|
6.31E+10 |
|
|
|
5.02E+10 |
|
|
|
1.26E+11 |
|
|
|
7.54E+11 |
|
|
|
1E+11 |
|
|
|
1.27E+12 |
|
|
|
1.58E+11 |
|
|
|
1.58E+11 |
|
|
|
4.87E+12 |
|
|
|
|
1.58E+11 |
124.2337 |
|
|
1.58E+11 |
|
|
|
6.31E+10 |
|
|
|
3.16E+10 |
|
|
|
7.96E+10 |
|
|
|
1E+09 |
|
|
|
7.94E+10 |
|
|
|
2E+10 |
|
|
|
7.94E+10 |
|
|
|
7.94E+10 |
|
|
|
6.31E+10 |
|
|
|
2.51E+10 |
|
|
|
6.31E+10 |
|
|
|
1.58E+11 |
|
|
|
7.54E+11 |
|
|
|
2E+11 |
|
|
|
6.34E+11 |
|
|
|
3.16E+11 |
|
|
|
2E+10 |
|
|
|
1.58E+11 |
|
|
|
2.65E+12 |
|
|
|
|
3.17E+11 |
124.5098 |
|
|
1.58E+11 |
|
|
|
6.31E+10 |
|
|
|
3.16E+10 |
|
|
|
7.96E+10 |
|
|
|
1E+09 |
|
|
|
2E+10 |
|
|
|
2.51E+10 |
|
|
|
6.31E+10 |
|
|
|
1.58E+11 |
|
|
|
7.54E+11 |
|
|
|
2.51E+10 |
|
|
|
6.34E+11 |
|
|
|
3.16E+11 |
|
|
|
2E+10 |
|
|
|
1.58E+11 |
|
|
|
2.82E+12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|