Appendix No.

Title

Appendix 2.1

Tentative Construction Programme

Appendix 2.2

Summary of Works Areas

Appendix 3.1

Representative Photographs of Habitats Recorded within the Study Area

Appendix 3.2

Flora Recorded within the Study Area

Appendix 3.3

Representative Photographs of Fauna Species of Conservation Interest Recorded within the Study Area

Appendix 3.4

Fauna Recorded within the Study Area

Appendix 3.5

SSS Channel Design Proving Compensatory Stream Habitats

Appendix 3.6

Marine Ecological Impact Assessment for Lung Kwu Sheung Tan Barging Point

Appendix 3.7

Marine Ecological Impact Assessment for West Kowloon Terminus

Appendix 4.1

Representative Photographs of Fishponds Recorded within the Study Area

Appendix 4.2

Fisheries Impact Assessment for Lung Kwu Sheung Tan Barging Point and West Kowloon Terminus Water Cooling System

Appendix 4.3

Groundwater Drawdown Contour Plan

Appendix 5.1

Construction Plant Inventory – Unmitigated Scenario

Appendix 5.2

Construction Noise Calculation – Unmitigated Scenario

Appendix 5.3

Airborne Railway Noise Calculation  – Unmitigated Scenario

Appendix 5.4

Fixed Plant Noise Assessment for Stabling Sidings and Maintenance Facilities – Unmitigated Scenario

Appendix 5.5

Sample Calculation of Maintenance Train Departing and Arriving at SSS

Appendix 5.6

Fixed Plant Noise Calculation – Ventilation Building

Appendix 5.7

Construction Plant Inventory – Mitigated Scenario

Appendix 5.8

Construction Noise Calculation – Mitigated Scenario

Appendix 5.9

Airborne Railway Noise Calculation – Mitigated Scenario

Appendix 5.10

Sample Calculation of Fixed Plant Noise Assessment for Stabling Sidings and Maintenance Facilities – Mitigated Scenario

Appendix 5.11

Sample Calculation of Maintenance Train Departing and Arriving at SSS – Mitigated Scenario

Appendix 5.12

Cumulative Construction Noise Impact Assessment 

Appendix  6.1

Force Density Levels of TBM Obtained from Lok Ma Chau Measurement

Appendix 6.2

Line Source Response Values Obtained from West Island Line EIA Study

Appendix 6.3

Building Coupling Factor

Appendix 6.4

Building Vibration Responses

Appendix 6.5

Force Density Level of High Speed Train

Appendix 6.6

Tunnel Coupling Factor for Bored Tunnel in Soil

Appendix 6.7

Sample Calculation of Construction Ground-borne Noise Assessment

Appendix 6.8

Speed Profile of the Project

Appendix 6.9

Sample Calculation of Operation Ground-borne Noise Assessment

Appendix 6.10

Insertion Loss of Low Noise Trackform

Appendix 6.11

Sample Calculation of Operation Ground-borne Noise Assessment (with Low Noise Trackform)

Appendix 7.1

Summary of Alternative Design Scheme