Appendix  No.

Title

Appendix 9.2

Contamination Assessment Report and Remediation Action Plan

Appendix  10.1

Breakdown of Annual Quantity of Materials Generation

Appendix  10.2

Breakdown of Annual Quantity of Materials Disposal

Appendix  10.3

Letter from EPD

Appendix  10.4

Sediment Sampling and Testing Plan

Appendix  10.5

Results of Chemical and Biological Screening

Appendix  11.1

Coverage and Grid Schematization of XRL Model

Appendix  11.2

Indicator Points and Sections

Appendix  11.3a

Model Performance Review for Water Level, Current, Flow – Dry Season

Appendix  11.3b

Model Performance Review for Water Level, Current, Flow – Wet Season

Appendix  11.4a

Model Performance Review for Surface Salinity

Appendix  11.4b

Comparison of test results of the spin-up period and the actual simulation period for water depth, salinity and temperature at Point A

Appendix  11.4c

Comparison of test results of the spin-up period and the actual simulation period for chlorine at Point A

Appendix  11.5

Derivation of Heat Re-circulation Factor

Appendix  11.6a

Predicted Temperature Elevation at Surface Water – Dry Season

Appendix  11.6b

Predicted Temperature Elevation at Surface Water – Wet Season

Appendix  11.7a

Predicted Depth-averaged Residual Chlorine Concentration – Dry Season

Appendix  11.7b

Predicted Depth-averaged Residual Chlorine Concentration – Wet Season

Appendix 11.8

Hydrogeological Impact Assessment

Appendix 11.9a

Sewerage Impact Assessment for West Kowloon Terminus

Appendix 11.9b

Sewerage Impact Assessment at Northern Section of Alignment

Appendix 11.9c

Sewerage Impact Assessment at Southern Section of Alignment

Appendix  12.1

Dust Emission Rate Calculation

Appendix  12.2

Contours of Annual TSP Concentration in µg/m3 at 15m Above Ground at West Kowloon Area