Appendix No. |
Title |
Contamination
Assessment Report and Remediation Action Plan |
|
Breakdown
of Annual Quantity of Materials Generation |
|
Breakdown
of Annual Quantity of Materials Disposal |
|
Letter
from EPD |
|
Sediment
Sampling and Testing Plan |
|
Results
of Chemical and Biological Screening |
|
Coverage
and Grid Schematization of XRL Model |
|
Indicator
Points and Sections |
|
Model
Performance Review for Water Level, Current, Flow – Dry Season |
|
Model
Performance Review for Water Level, Current, Flow – Wet Season |
|
Model
Performance Review for Surface Salinity |
|
Comparison
of test results of the spin-up period and the actual simulation period for
water depth, salinity and temperature at Point A |
|
Comparison
of test results of the spin-up period and the actual simulation period for
chlorine at Point A |
|
Derivation
of Heat Re-circulation Factor |
|
Predicted
Temperature Elevation at Surface Water – Dry Season |
|
Predicted
Temperature Elevation at Surface Water – Wet Season |
|
Predicted
Depth-averaged Residual Chlorine Concentration – Dry Season |
|
Predicted
Depth-averaged Residual Chlorine Concentration – Wet Season |
|
Hydrogeological Impact Assessment |
|
Sewerage Impact Assessment for |
|
Sewerage Impact Assessment at Northern Section of
Alignment |
|
Sewerage Impact Assessment at Southern Section of
Alignment |
|
Dust Emission Rate Calculation |
|
Contours
of Annual TSP Concentration in µg/m3 at 15m Above Ground at West Kowloon Area |