Agreement No. CE 61/2007 (CE)

North East New Territories New Development Areas Planning and Engineering Study - Investigation

 

Final Environmental Impact Assessment Report

 

 

CONTENT

 

1              Introduction

 

1.1          Project Background

1.2          The Assignment

1.3          The Study Area

1.4          EIA Study Brief

1.5          Designated Projects

1.6          Objectives of the EIA Report

1.7          Structure of the Report

 

2              Project Description

 

2.1          General Description of the Project

2.2          Need for the Project

2.3          Revised Recommended Outline Development Plan

2.4          Key Infrastructure

2.5          Nature, Benefits and Scope of the Project

2.6          Construction Method

2.7          Implementation Programme

2.8          Concurrent Project

 

3              Air Quality Assessment

 

3.1          Overview

3.2          Environmental Legislation, Standards and Guidelines

3.3          Description of Environment

3.4          Air Sensitive Receivers

3.5          Assessment Methodology

3.6          Identification of Environmental Impact

3.7          Prediction and Evaluation of Impacts

3.8          Mitigation Measures

3.9          Conclusion

 

4              Noise Impact

 

4.1          Overview

4.2          Environmental Legislation, Standards and Guidelines

4.3          Description of the Environment

4.4          Potential Concurrent Project

4.5          Noise Sensitive Receivers

4.6          Assessment Methodology

4.7          Identification of Impacts

4.8          Evaluation of Impacts

4.9          Mitigation Measures

4.10        Assessment of Side Effects and Constraints

4.11        Evaluation of Constraints on Planned Noise Sensitive Developments/ Landuses

4.12        Summary of Environmental Mitigation Measures

4.13        Residual Environmental Impacts

4.14        Conclusion

 

5              Water Quality Impact

 

5.1          Overview              

5.2          Environmental Legislation, Standards and Guidelines              

5.3          Description of the Environment       

5.4          Water Quality Sensitive Receivers  

5.5          Assessment Methodology

5.6          Identification and Evaluation of Environmental Impacts            

5.7          Mitigation Measures          

5.8          Cumulative Impacts           

5.9          Residual Environmental Impacts    

5.10        Summary             

5.11        Reference            

 

6              Sewerage Impact Assessment        

 

6.1          Introduction

6.2          Methodology and Design Criteria

6.3          Existing and Planned Sewerage Infrastructure

6.4          Review of Findings under Previous NENT Study

6.5          Estimation of Sewage Flows

6.6          Effluent Quality and Discharge Standards of SWH STW

6.7          Sewage Treatment in Shek Wu Hui Sewage Treatment Works

6.8          Kwu Tung North NDA

6.9          Fanling North NDA

6.10        Treated Sewage Effluent (TSE) Reuse for NDAs

6.11        Interface with Other Projects

6.12        Conclusion and Recommendation

6.13        Reference

 

7              Waste Management Implications

 

7.1          Overview

7.2          Environmental Legislation, Standards and Guidelines

7.3          Description of the Environment

7.4          Assessment Methodology

7.5          Identification and Evaluation of Waste Management Implications

7.6          Mitigation Measures

7.7          Residual Waste Management Implications

7.8          Conclusion

 

8              Land Contamination Impacts

 

8.1          Overview

8.2          Environmental Legislation, Standards and Guidelines

8.3          Assessment Methodology

8.4          Description of the Environment

8.5          Site Investigation

8.6          Identification and Evaluation of Land Contamination

8.7          Way Forward for Dealing High Background Arsenic in KTN

8.8          Health Risk Assessment for Arsenic-Containing Soil

8.9          Conclusion

 

9              Hazard to Life

 

9.1          Introduction

9.2          Scope and Objectives

9.3          Study Approach

9.4          Cases to Be Assessed

9.5          Description of Sheung Shui Water Treatment Works

9.6          Meteorological Conditions

9.7          Population Considered in the Assessment

9.8          Hazard Identification

9.9          Consequence Analysis

9.10        Rationalization of Chlorine Release Scenarios and Estimation of Scenario Frequencies

9.11        Quantitative Risk Assessment

9.12        Conclusions and Recommendations

9.13        References

 

10           Landfill Gas Hazard

 

10.1        Overview

10.2        Environmental Legislation, Standards and Guidelines

10.3        Description of the Environment

10.4        Assessment Methodology

10.5        Qualitative Risk Assessment

10.6        Protective and Precautionary Measures

10.7        Conclusion

 

11           CULTURAL HERITAGE

 

11.1        Overview

11.2        Environmental Legislation, Standard and Guidelines

11.3        Assessment Methodology

11.4        Description of Environment

11.5        Identification and Evaluation of Impact

11.6        Mitigation Measures

11.7        Conclusions

11.8        References

 

12           Landscape and Visual Impact Assessment  

               

12.1        Introduction

12.2        Environmental Legislation, Standards and Guidelines

12.3        Scope of the Study

12.4        Landscape Impact Assessment Methodology

12.5        Review of Planning and Development Control Framework

12.6        Landscape Baseline Conditions

12.7        Sources of Impacts

12.8        Landscape Impact Assessment

12.9        Landscape & Visual Mitigation Measures

12.1        Visual Impact Assessment Methodology

12.11      Visual Baseline Conditions

12.12      Visual Impact Assessment

12.13      Conclusion – Schedule 3 DP

12.14      LVIA for Schedule 2 Designated Projects – General Introduction

12.15      Environmental Legislation, Standards and Guidelines

12.16      Scope of the Study

12.17      Schedule 2 Concurrent Projects

12.18      Landscape Impact Assessment Methodology

12.19      Visual Impact Assessment Methodology

 

12A         DP Package A

12A.1     KTN Schedule 2 DP 1, 2, 3 and 4 (Package A)

12A.2     Review of Planning and Development Control Framework

12A.3     Landscape Baseline Conditions

12A.4     Details of Site Formation Impacts – KTN Schedule 2 DPs 1, 2, 3 and 4

12A.5     Sources of Impacts

12A.6     Landscape Impact Assessment

12A.7     Summary of key landscape impacts

12A.8     Significance of landscape impacts before Mitigation

12A.9     Landscape and Visual Mitigation Measures for Construction and Operation

12A.10   Significance of Residual Landscape Impacts Upon Mitigation

12A.11   Visual Impact Assessment

12A.12   Sensitivity of VSRs/VPs

12A.13   Magnitude of Visual Change

12A.14   Significance of Visual Impacts

12A.15   Conclusion

 

12B         DP Package B

12B.1     KTN Schedule 2 DP 5 (Package B)

12B.2     Review of Planning and Development Control Framework

12B.3     Landscape Baseline Conditions

12B.4     Details of Site Formation Impacts – KTN Schedule 2 DP5

12B.5     Potential Landscape and Visual Impacts

12B.6     Landscape Impact Assessment

12B.7     Summary of key landscape impacts

12B.8     Significance of Landscape Impacts before mitigation

12B.9     Landscape and Visual Mitigation Measures for Construction and Operation

12B.10   Significance of Residual Landscape Impactsupon mitigation

12B.11   Visual Impact Assessment

12B.12   Magnitude of Visual Change

12B.13   Significance of Visual Impacts

12B.14   Conclusion

 

12C        DP Package C

12C.1     Introduction

12C.2     Review of Planning and Development Control Framework

12C.3     Landscape Baseline Conditions

12C.4     Details of Site Formation Impacts – Schedule 2 DPs 7, 11 and 13

12C.5     Potential Landscape and Visual Impacts

12C.6     Landscape Impact Assessment

12C.7     Summary of key landscape impacts

12C.8     Significance of Landscape Impacts

12C.9     Landscape and Visual Mitigation Measures for Construction and Operation

12C.10   Significance of Residual Landscape Impacts upon mitigation

12C.11   Visual Impact Assessment

12C.12   Visual Baseline Conditions

12C.13   Visual Impact Assessment

12C.14   Significance of Visual Impacts

12C.15   Conclusion

 

12D        DP Package D

12D.1     Introduction

12D.2     Review of Planning and Development Control Framework

12D.3     Landscape Baseline Conditions

12D.4     Details of Site Formation Impacts – FLN Schedule 2 DPs 8, 9, 10and 12

12D.5     Sources of Impacts

12D.6     Landscape Impact Assessment

12D.7     Summary of Key Landscape Impacts

12D.8     Significance of Landscape Impacts

12D.9     Landscape and Visual Mitigation Measures

12D.10   Significance of Residual Landscape Impacts upon mitigation

12D.11   Visual Impact Assessment

12D.12   Sensitivity of VSRs/VPs

12D.13   Visual Impact Assessment

12D.14   Significance of Visual Impacts

12D.15   Conclusion

 

13           Ecological Impact Assessment

 

13.1        Introduction

13.2        Ecological Resources and Development Context of the NDAs and Surrounding Areas

13.3        Review of Existing Literature Related to Ecological Conditions in the Study Area

13.4        Survey Methodology

13.5        Ecological Profile of the Study Area

13.6        Description and Ecological Evaluation of Habitats and Species

13.7        Prediction and Evaluation of Ecological Impacts of the Proposed Development

13.8        Mitigation of Impacts

13.9        Implementation, management and maintenance of mitigation measures            

13.10      Residual Impacts

13.11      Ecological Monitoring & Audit

13.12      Conclusion

13.13      References

 

14           Fisheries Impact Assessment

 

14.1        Introduction

14.2        Environmental Legislation, Policies, Plans, Standards and Guidelines

14.3        Methodology

14.4        Baseline Conditions – Review of Existing Information

14.5        Baseline Conditions – Site Investigation

14.6        Identification and Evaluation of Impacts

14.7        Mitigation Measures

14.8        Residual Environmental Impacts and Monitoring and Audit

14.9        Conclusions

 

15           Environmental Monitoring and Audit Requirements

 

15.1        Overview

15.2        Project Organization

15.3        EM&A Manual

15.4        Project Implementation Schedule

15.5        EM&A Programme

 

16           Summary of Environment Outcomes

 

16.1        Overview

16.2        Population and Environmental Areas Protected

16.3        Environmental Friendly Design and Benefit

16.4        Summary of the Measures taken for the Avoidance and Minimization of Environmental Impacts

 

17           Conclusion

 

17.1        Air Quality

17.2        Noise

17.3        Water Quality

17.4        Sewerage and Sewage Implication

17.5        Waste

17.6        Land Contamination

17.7        Hazard to Life

17.8        Landfill Gas

17.9        Cultural Heritage

17.10      Landscape and Visual

17.11      Ecology

17.12      Fisheries

17.13      Environmental Monitoring and Audit Requirements

 

LIST OF APPENDICES

 

2              Project Description

 

Appendix 2.1        RODPs Development Parameters

Appendix 2.2        Construction Programme

 

3              Air Quality Assessment

 

Appendix 3.1        Preliminary Construction Program

Appendix 3.2        Justification for the Percentage of Active Works Areas and Dust Suppression Efficiency

Appendix 3.3        Details of Dust Emission Sources and Calculations

Appendix 3.4        Key Assumptions for EmFAC

Appendix 3.5        Hourly Vehicular Emission Rates

Appendix 3.6        In-tunnel Air Quality Assessment

Appendix 3.7        Calculations of Industrial Emission Factors

Appendix 3.8        Details and Calculations of Odour Emission Sources

Appendix 3.9        Result of Unmitigated Cumulative TSP Concentration

Appendix 3.10      Result of Cumulative NO2 and RSP Concentration

Appendix 3.11      Result of Cumulative SO2 Concentration

Appendix 3.12      Result of Cumulative Odour Concentration

Appendix 3.13      Result of Mitigated TSP Concentration for Tier-1 Assessment

Appendix 3.14      Result of Mitigated TSP Concentration for Tier-2 Assessment

Appendix 3.15      Result of Mitigated TSP Concentration for Tier-3 Assessment

 

4              Noise Impact

 

Appendix 4.1a      Locations of Assessment Points – Construction Noise

Appendix 4.1b      Locations of Assessment Points – Road Traffic Noise

Appendix 4.1c      Locations of Assessment Points – Fixed Noise

Appendix 4.1d      Locations of Assessment Points – Helicopter Noise

Appendix 4.1e      Photos of Existing NSRs

Appendix 4.1f       Site Formation Level and Road mpd Level

Appendix 4.1g      Building Name, Landuse, Floor of Each and Selected Assessment Point

Appendix 4.2        Construction Programme

Appendix 4.3        Background Noise Measurement Locations for Fixed Noise Assessment

Appendix 4.4        SWL of PME

Appendix 4.5        Government Flying Service Memo Ref:AIR/10/14(3) dated 29 September 2008

Appendix 4.6        Secretary of Security (Memo Ref. ( ) in SBCR 12/1488/95 Pt.3 dated March 3, 2009

Appendix 4.7        Government Flying Service Memo Ref: AIR/10/14(4) dated 17 March 2011

Appendix 4.8        Hong Kong Police Force Memo Ref.74 in CP Con 15/47 Pt 2 dated 4 July 2011

Appendix 4.9a      Plant Inventory Adopted for Each Workfront (KTN)

Appendix 4.9b      Plant Inventory Adopted for Each Workfront (FLN)

Appendix 4.10a   Notional Distance between Assessment Points and Workfronts (KTN)

Appendix 4.10b   Notional Distance between Assessment Points and Workfronts (FLN)

Appendix 4.11a   Unmitigated Construction Noise Impacts (KTN)

Appendix 4.11b   Unmitigated Construction Noise Impacts (FLN)

Appendix 4.12a   Monthly Unmitigated Construction Noise Impacts from Each Workfront (KTN)

Appendix 4.12b   Monthly Unmitigated Construction Noise Impacts from Each Workfront (FLN)

Appendix 4.13a   Computer Plot of Road Scheme (KTN)

Appendix 4.13b   Computer Plot of Road Scheme (FLN)

Appendix 4.14a   Road Hierarchy (KTN)

Appendix 4.14b   Road Hierarchy (FLN)

Appendix 4.15a   Details of Road Traffic Data (KTN)

Appendix 4.15b   Details of Road Traffic Data (FLN)

Appendix 4.15c    Approval from TD on Traffic Data

Appendix 4.16a   Low Noise Road Surface Locations (KTN)

Appendix 4.16b   Low Noise Road Surface Locations (FLN)

Appendix 4.17      Highway Department Ref: (N54Z) in HNT/703/N/154 dated 13 April 2012

Appendix 4.18      Retrofitting Barrier along Fanling Highway

Appendix 4.19      Environmental Permit (EP-404/2011)

Appendix 4.19a   Sample Calculation for Road Traffic Noise Assessment

Appendix 4.19b   Road Traffic Noise – Setback and Other Mitigation Requirements for Planned Residential Buildings and Schools

Appendix 4.20a   Unmitigated Road Traffic Noise Impacts on NSRs (KTN) at Year 2044

Appendix 4.20b   Unmitigated Road Traffic Noise Impacts on NSRs (FLN) at Year 2044

Appendix 4.21a   Unmitigated Road Traffic Noise Impacts on NSRs (KTN) at Year 2036

Appendix 4.21b   Unmitigated Road Traffic Noise Impacts on NSRs (KTN) at Year 2043

Appendix 4.21c    Unmitigated Road Traffic Noise Impacts on NSRs (FLN) at Year 2038

Appendix 4.22      Determination of SWL of single mode shooting of each weapon

Appendix 4.23      Correspondence with HKPF

Appendix 4.24      Detailed Calculation of Shooting Noise Impacts on NSRs

Appendix 4.24a   Predicted SPL at NSRs due to Lo Wu Classification Range

Appendix 4.25      Detailed Calculation of Ventilation Shafts Noise Impacts on NSRs

Appendix 4.25a   Predicted SPL at NSRs due to Ventilation Shaft

Appendix 4.26      Detailed Calculation of Maximum Allowable SWL of DCS

Appendix 4.26a   Predicted SPL at NSRs due to DCS

Appendix 4.27      Detailed Calculation of Maximum Allowable SWL of STW

Appendix 4.27a   Predicted SPL at NSRs due to STW

Appendix 4.28      Detailed Calculation of Crowd and PA Noise Impacts on NSRs

Appendix 4.28a   Predicted SPL at NSRs due to Crowd and PA Noise

Appendix 4.29      Detailed Calculation of Maximum Allowable SWL of SPS / PS

Appendix 4.29a   Predicted SPL at NSRs due to SPS / PS

Appendix 4.30      Detailed Calculation of Helicopter Noise Impacts on NSRs

Appendix 4.31      Drawings Showing Barrier, Enclosure and Acoustic Mat for Construction Noise

Appendix 4.32a   Mitigated Construction Noise Impacts on NSRs (KTN)

Appendix 4.32b   Mitigated Construction Noise Impacts on NSRs (FLN)

Appendix 4.33a   Monthly Mitigated Construction Noise Impacts from Each Workfront (KTN)

Appendix 4.33b   Monthly Mitigated Construction Noise Impacts from Each Workfront (FLN)

Appendix 4.34      Record of Minutes held on 28 March 2011

Appendix 4.35      Typical Section of Semi-enclosure and Enclosure Design

Appendix 4.36a   Details of Road Traffic Noise Impacts on NSRs (Mitigated Scenario - KTN) at Year 2044

Appendix 4.36b   Details of Road Traffic Noise Impacts on NSRs (Mitigated Scenario - FLN) at Year 2044

Appendix 4.37a   Details of Road Traffic Noise Impacts on NSRs (Mitigated Scenario - KTN) at Year 2036

Appendix 4.37b   Details of Road Traffic Noise Impacts on NSRs (Mitigated Scenario - KTN) at Year 2043

Appendix 4.37c    Details of Road Traffic Noise Impacts on NSRs (Mitigated Scenario - FLN) at Year 2038

Appendix 4.38a   Not Used

Appendix 4.38b   Details of Road Traffic Noise Impacts on NSRs (Further Mitigation Scenario FLN) at Year 2044

Appendix 4.39a   Details breakdown of protected and benefitted land uses (KTN)

Appendix 4.39b   Details breakdown of protected and benefitted land uses (FLN)

 

5              Water Quality Impact

 

Appendix 5.1  Descriptions of Water Streams

Appendix 5.2  Loading from Non-point Sources

 

6              Sewerage Impact Assessment        

 

Appendix 6.1        Development Parameters

Appendix 6.2        Supplementary Development Parameters

Appendix 6.3        Estimation of Sewage Flows from NDAs

Appendix 6.4        Estimation of Sewage Flows to SWHSTW

Appendix 6.5        Sewerage System Design Calculations

Appendix 6.6        InfoWorks Hydraulic Modelling Results

Appendix 6.7        Proposed Effluent Discharge Standards of SWHSTW

 

 

8              Land Contamination Impacts

 

Appendix 8.1        Contamination Assessment Plan (CAP)

Appendix 8.2        Contamination Assessment Plan (CAP) for Government Sites

Appendix 8.3        Contamination Assessment Report (CAR) for Government Sites

Appendix 8.4        Health Risk Assessment Report for High Arsenic Soil in Kwu Tung North New Development Area   

 

9              Hazard to Life

 

Appendix 9.1        Population Distribution and Population Assumptions

Appendix 9.2        Site Survey on Riverside/Seafront Promenade Areas at Sha Tin

Appendix 9.3        Historical Incidents from MHIDAS Database

 

 

11           Cultural Heritage

 

Appendix 11.1      Declared Monuments and Graded Historic Buildings Records Identified in the CHAA

Appendix 11.2a   Detailed Plans showing Identified Built Heritage Items within the KTN NDA and Associated Infrastructure Works CHAA

Appendix 11.2b   Detailed Plans showing Identified Built Heritage Items within the FLN NDA and Associated Infrastructure Works CHAA

Appendix 11.3a   Historic Buildings Records Identified Cultural Heritage Resources within the KTN NDA and Associated Infrastructure Works CHAA

Appendix 11.3b  Historic Buildings Records Identified Cultural Heritage Resources within the FLN NDA and Associated Infrastructure Works CHAA

Appendix 11.4a   Landscape Features Records Identified Cultural Heritage Resources within the KTN NDA and Associated Infrastructure Works CHAA

Appendix 11.4b   Landscape Features Records Identified Cultural Heritage Resources within the FLN NDA and Associated Infrastructure Works CHAA

Appendix 11.5      North East New Territories New Development Areas Planning and Engineering Study - Archaeological Field Survey Final Report

Appendix 11.6a   Detailed Plans showing Identified Locations with Archaeological Interest within the KTN NDA and Associated Infrastructure Works CHAA

Appendix 11.6b   Detailed Plans showing Identified Locations with Archaeological Interest within the FLN NDA and Associated Infrastructure Works CHAA (1 of 2)

Appendix 11.6c    Detailed Plans showing Identified Locations with Archaeological Interest within the FLN NDA and Associated Infrastructure Works CHAA (2 of 2)

 

13           Ecological Impact Assessment

 

Appendix 13.1.1. Plant species of conservation significance and protected species recorded in the Study Area in this and/or relevant previous studies. Where study boundaries of previous studies extend beyond current Study Area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.1.2. Vegetation recorded within the Kwu Tung North NDA and observations during further surveys for this Study.

Appendix 13.1.3. Vegetation recorded within the Fanling North NDA and observations during further surveys for this Study.

Appendix 13.2.1. Terrestrial mammal species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extend beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.2.2.                 Terrestrial mammals recorded in the Kwu Tung North NDA and observations during further surveys for this Study.

Appendix 13.2.3.                 Terrestrial mammals recorded in the Fanling North NDA and observations during further surveys for this study

Appendix 13.2.4.                 Relative abundance of bats recorded in the Kwu Tung North NDA and observations during further surveys for this Study.

Appendix 13.2.5.                 Relative abundance of bats recorded in the Fanling North NDA and observations during further surveys for this Study.

Appendix 13.3.1. Bird species recorded in the Study Area in this and other studies, and habitats typically utilised.  Brackets denote habitats utilised by species which occur only occasionally in the Study Area or which occur in very small numbers relative to elsewhere in Hong Kong. Occurrence of such species in the Study Area is not considered of significance to the habitat evaluation and ecological assessment procedure except where otherwise noted in the report.

Appendix 13.3.2. Mean number and maximum count of bird species of conservation significance and wetland-dependent species recorded in Long Valley (south and east of the Sheung Yue River) during systematic surveys for this Study.

Appendix 13.3.3. Mean number and maximum count of bird species of conservation significance and wetland-dependent species recorded in Long Valley (north and west of the Sheung Yue River) during systematic surveys for this Study.

Appendix 13.3.4. Mean number and maximum count of bird species of conservation significance and wetland-dependent species recorded in systematic surveys in the Kwu Tung North NDA (excluding Long Valley) and observations during further surveys for this study.

Appendix 13.3.5. Mean number and maximum count of bird species of conservation significance and wetland-dependent species recorded in systematic surveys in the Fanling North NDA and observations during further surveys for this study (where no mean is shown, observations are from the further surveys).

Appendix 13.3.6. Peak monthly counts of wetland-associated bird species recorded in the tidal section of the Sheung Yue River, Kwu Tung North during August 2008 to June 2009.

Appendix 13.3.7. Peak monthly counts of wetland-associated bird species recorded in the non-tidal section of Ng Tung River, Fanling North during July 2008 to June 2009.

Appendix 13.3.8. Peak monthly counts of wetland-associated bird species recorded in the tidal section of Ng Tung River/ Shek Sheung River in Kwu Tung North during July 2008 to June 2009.

Appendix 13.4.1. Reptile species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.4.2. Maximum count of reptile species recorded in the Kwu Tung North NDA during surveys and observations during further surveys for this study.

Appendix 13.4.3. Maximum count of reptile species recorded in the Fanling North NDA during surveys and observations during further surveys for this study.

Appendix 13.5.1. Amphibian species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.5.2. Maximum count of amphibian species recorded in the Kwu Tung North NDA and observations during further surveys for this study.

Appendix 13.5.3. Maximum count of amphibian species recorded in the Fanling North NDA and observations during further surveys for this study.

Appendix 13.6.1. Fish species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.6.2. Maximum number of fish recorded in stream surveys in Kwu Tung North NDA and observations during further surveys for this study.

Appendix 13.6.3. Maximum number of fish recorded in stream surveys in Fanling North NDA and observations during further surveys for this study.

Appendix 13.7.1. Butterfly species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.7.2.                 Mean and maximum numbers of butterflies recorded in systematic surveys in the Kwu Tung North NDA and observations during further surveys for this study (where no mean is shown, observations are from the further surveys).

Appendix 13.7.3.                  Mean and maximum numbers of butterflies recorded in systematic surveys in the Fanling North NDA and observations during further surveys for this study (where no mean is shown, observations are from the further surveys).

Appendix 13.7.4. Species listed by Bascombe (1993) but not recorded in the subsequent surveys in the Study Area.

Appendix 13.8.1. Dragonfly species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.8.2. Mean and maximum number of dragonflies recorded in systematic surveys in the Kwu Tung North NDA and observations during further surveys for this study.

Appendix 13.8.3. Mean and maximum number of dragonflies recorded in systematic surveys in the Fanling North NDA and observations during further surveys for this study (where no mean is shown, observations are from the further surveys).

Appendix 13.9.1. Aquatic invertebrate species recorded in the Study Area in this and/or previous studies. Where study boundaries of previous studies extended beyond the current study area boundary, only records from within the area covered by this study are included. Note that for some sources, lists are incomplete and/or only some records are attributed to a specific locality.

Appendix 13.9.2. Maximum number of aquatic invertebrate recorded in stream fauna surveys in the Kwu Tung North NDA and observations during further surveys for this study.

Appendix 13.9.3. Maximum number of aquatic invertebrate recorded in stream fauna surveys in the Fanling North NDA and observations during further surveys for this study.

Appendix 13.10   Long Valley Nature Park: Preliminary Management Plan

Appendix 13.11   Representative photographs of habitats within the Study Area and sites of ecological significance which will be lost due to the Project.

 

14           Fisheries Impact Assessment

 

Appendix 14.1      Photo records of site visit

 

15           Environmental Monitoring and Audit Requirements

 

Appendix 15-1 Project Implementation Schedule

                               

16           Summary of Environment Outcomes

 

Appendix 16.1      Key Assessment Assumptions and Limitation of Assessment Methodologies

Appendix 16.2 Environmental Assessment for minor change in revised RODP

 

 

LIST OF FIGURES

 

 

1              Introduction

 

 

Figure 1.1         KTN NDA and FLN NDA- EIA Study Area

Figure 1.2              Locations of Designated Projects in KTN NDA

Figure 1.3              Locations of Designated Projects in FLN NDA

Figure 1.4              Locations of Designated Projects in Fanling Bypass

 

2              Project Description

 

Figure 2.1              Revised RODP of KTN NDA

Figure 2.2              Revised RODP of FLN NDA

Figure 2.3              Road Network in Study Area

Figure 2.4              Proposed Road and Improvement Works

Figure 2.5              Proposed Road and Improvement Works

Figure 2.6              Proposed Road and Improvement Works

Figure 2.7              Proposed Road and Improvement Works

Figure 2.8              Sections for Po Shek Wu Interchange Improvement

Figure 2.9              Sections for Po Shek Wu Interchange Improvement

Figure 2.10           Layout of Sewage Pumping Station for NDAs Development

Figure 2.11           Layout Plan of the Proposed Sewage Treatment Works Extension in FLN NDA

Figure 2.11a         Proposed Treated Sewage Effluent (TSE) Mains in Kwu Tung North NDA

Figure 2.11b         Proposed Treated Sewage Effluent (TSE) Mains in Fanling North NDA

Figure 2.11c         Proposed Treated Sewage Effluent (TSE) Mains within the Study Area

Figure 2.12           Proposed Road and Improvement Works

Figure 2.13           Proposed Road and Improvement Works

Figure 2.14           Proposed Road and Improvement Works

Figure 2.15           Sections for Fanling Bypass

Figure 2.16           Sections for Fanling Bypass

Figure 2.17           Sections for Fanling Bypass

Figure 2.18           Reprovisioning of North District Temporary Wholesale Market (On Completion)

Figure 2.19           Conceptual Cross Section of Steel Canopy at North District Temporary Wholesale Market

Figure 2.20           General Layout for Development Packages

Figure 2.20a         Proposed Network and Hierarchy in KTN NDA

Figure 2.20b         Proposed Network and Hierarchy in FLN NDA

Figure 2.21           Locations of Concurrent Projects – Construction Phase

Figure 2.22           Locations of Concurrent Projects – Operational Phase  

 

3              Air Quality Assessment

 

Figure 3.1              Location of Existing Air Sensitive Receivers of KTN NDA

Figure 3.2              Location of Existing Air Sensitive Receivers of FLN NDA

Figure 3.3              Location of Planned Air Sensitive Receivers of KTN NDA

Figure 3.4              Location of Planned Air Sensitive Receivers of FLN NDA

Figure 3.5              Road Networks Implementation Schedule for KTN NDA

Figure 3.6              Road Networks Implementation Schedule for FLN NDA

Figure 3.7              Location of Chimneys Adjacent to KTN and FLN NDAs

Figure 3.8              Locations of Proposed/Existing Air Pollution Sources in KTN NDA

Figure 3.9              Locations of Proposed/Existing Air Pollution Sources in FLN NDA

Figure 3.10           Layout Plan of the Proposed Shek Wu Hui Sewage Treatment Works Expansion (Option 2) in FLN NDA

Figure 3.11           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018

Figure 3.12           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018

Figure 3.13           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025

Figure 3.14           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025

Figure 3.15           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028

Figure 3.16           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028

Figure 3.17           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018

Figure 3.18           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018

Figure 3.19           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021

Figure 3.20           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021

Figure 3.21           Contours of Cumulative Unmitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025

Figure 3.22           Contours of Cumulative Unmitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025

Figure 3.23           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018

Figure 3.24           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025

Figure 3.25           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028

Figure 3.26           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018

Figure 3.27           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021

Figure 3.28           Contours of Cumulative Unmitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN FLN in Year 2025

Figure 3.29           Contours of Cumulative Max. 1-Hour NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2021

Figure 3.30           Contours of Cumulative Max. 24-Hour NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2021

Figure 3.31           Contours of Cumulative Annual-Averaged NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2021

Figure 3.32           Contours of Cumulative Max. 1-Hour NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2022

Figure 3.33           Contours of Cumulative Max. 24-Hour NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2022

Figure 3.34           Contours of Cumulative Annual-Averaged NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2022

Figure 3.35           Contours of Cumulative Max. 24-Hour RSP Concentration at 1.5m above Ground of KTN NDA in Year 2021

Figure 3.36           Contours of Cumulative Annual-Averaged RSP Concentration at 1.5m above Ground of KTN NDA in Year 2021

Figure 3.37           Contours of Cumulative Max. 24-Hour RSP Concentration at 1.5m above Ground of FLN NDA in Year 2022

Figure 3.38           Contours of Cumulative Annual-Averaged RSP Concentration at 1.5m above Ground of FLN NDA in Year 2022

Figure 3.39           Contours of Cumulative Max. 1-Hour NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2029

Figure 3.40           Contours of Cumulative Max. 24-Hour NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2029

Figure 3.41           Contours of Cumulative Annual-Averaged NO2 Concentration at 1.5m above Ground of KTN NDA in Year 2029

Figure 3.42           Contours of Cumulative Max. 1-Hour NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2029

Figure 3.43           Contours of Cumulative Max. 24-Hour NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2029

Figure 3.44           Contours of Cumulative Annual-Averaged NO2 Concentration at 1.5m above Ground of FLN NDA in Year 2029

Figure 3.45           Contours of Cumulative Max. 24-Hour RSP Concentration at 1.5m above Ground of KTN NDA in Year 2029

Figure 3.46           Contours of Cumulative Annual-Averaged RSP Concentration at 1.5m above Ground of KTN NDA in Year 2029

Figure 3.47           Contours of Cumulative Max. 24-Hour RSP Concentration at 1.5m above Ground of FLN NDA in Year 2029

Figure 3.48           Contours of Cumulative Annual-Averaged RSP Concentration at 1.5m above Ground of FLN NDA in Year 2029

Figure 3.49           Contours of Cumulative Max. 1-Hour SO2 Concentration (Chimney Impact) at 10m above Ground of KTN NDA

Figure 3.50           Contours of Cumulative Max. 24-Hour SO2 Concentration (Chimney Impact) at 10m above Ground of KTN NDA

Figure 3.51           Contours of Cumulative Annual-Averaged SO2 Concentration (Chimney Impact) at 10m above Ground of KTN NDA

Figure 3.52           Contours of Cumulative Max. 1-Hour SO2 Concentration (Chimney Impact) at 40m above Ground of FLN NDA

Figure 3.53           Contours of Cumulative Max. 24-Hour SO2 Concentration (Chimney Impact) at 40m above Ground of FLN NDA

Figure 3.54           Contours of Cumulative Annual-Averaged SO2 Concentration (Chimney Impact) at 35m above Ground of FLN NDA

Figure 3.55a         Contours of Cumulative Odour Concentration at 1.5m above Ground of FLN NDA

Figure 3.55b         Contours of Cumulative Odour Concentration at 55m above Ground of FLN NDA

Figure 3.56           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018 (Tier 1)

Figure 3.57           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018 (Tier 1)

Figure 3.58           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018 (Tier 2)

Figure 3.59           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018 (Tier 2)

Figure 3.60           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2018

Figure 3.61           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 1)

Figure 3.62           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 1)

Figure 3.63           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 2)

Figure 3.64           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 2)

Figure 3.65           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 3)

Figure 3.66           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025 (Tier 3)

Figure 3.67           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2025

Figure 3.68           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028 (Tier 1)

Figure 3.69           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028 (Tier 1)

Figure 3.70           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028 (Tier 2)

Figure 3.71           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028 (Tier 2)

Figure 3.72           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in KTN NDA in Year 2028

Figure 3.73           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018 (Tier 1)

Figure 3.74           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018 (Tier 1)

Figure 3.75           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018 (Tier 2)

Figure 3.76           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018 (Tier 2)

Figure 3.77           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in FLN NDA in Year 2018

Figure 3.78           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021 (Tier 1)

Figure 3.79           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021 (Tier 1)

Figure 3.80           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021 (Tier 2)

Figure 3.81           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021 (Tier 2)

Figure 3.82           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in FLN NDA in Year 2021

Figure 3.83           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025 (Tier 1)

Figure 3.84           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025 (Tier 1)

Figure 3.85           Contours of Cumulative Mitigated Max. 1-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025 (Tier 2)

Figure 3.86           Contours of Cumulative Mitigated Max. 24-Hour TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025 (Tier 2)

Figure 3.87           Contours of Cumulative Mitigated Annual-Averaged TSP Concentration at 1.5m above Ground in FLN NDA in Year 2025

 

4              Noise Impact

 

Figure 4.1              Locations of Fixed and Helicopter Noise Sources within 300m from the Study Area (KTN)

Figure 4.2              Locations of Fixed and Helicopter Noise Sources within 300m from the Study Area (FLN)

Figure 4.3              Locations of NSRs outside KTN

Figure 4.4              Locations of NSRs outside FLN

Figure 4.5              Locations of NSRs near FLB

Figure 4.6              Locations of Future NSRs in KTN

Figure 4.7              Locations of Future NSRs in FLN

Figure 4.8              Ranges of Helicopter Approach and Departure Path

Figure 4.9a           Locations and Extent of Mitigation Measures at Year 2044 (KTN)

Figure 4.9b           Locations and Extent of Mitigation Measures at Year 2044 (FLN)

Figure 4.10a         Not Used

Figure 4.10b         Locations and Extent of Further Mitigation Measures at Year 2044 (FLN)

Figure 4.11a         Locations of Proposed Social Welfares Facilities with Residential Premises and Home for the Elderly (KTN)

Figure 4.11b         Locations of Proposed Social Welfares Facilities with Residential Premises and Home for the Elderly (FLN)

Figure 4.12a         Locations of Proposed Kindergarten (KTN)

Figure 4.12b         Locations of Proposed Kindergarten (FLN)

 

5              Water Quality Impact

 

Figure 5.1              Drainage Basins and Water Gathering Ground

Figure 5.2              Existing and Planned Drainage Systems in Ng Tung and San Tin Basin

Figure 5.3              EPD’s Water Monitoring Stations within River Indus and River Beas

Figure 5.4              WSRs in KTN NDA

Figure 5.5              WSRs in FLN NDA

Figure 5.6              Typical Layout of Cofferdam

Figure 5.7              Location of Temporary Cofferdam in KTN NDA

Figure 5.8              Location of Temporary Cofferdam in FLN NDA          

 

6              Sewerage Impact Assessment        

 

Figure 6.1              Existing, Planned and Proposed Sewerage System within Study Area

Figure 6.2              Existing Layout of SWH STW

Figure 6.3              Layout Plan of the Proposed Sewage Treatment Works Extension in FLN NDA

Figure 6.4              Proposed Sewerage Layout for Kwu Tung North NDA

Figure 6.5              Proposed Sewerage Layout for Fanling North NDA

Figure 6.6              Proposed Treated Sewage Effluent (TSE) Mains in Kwu Tung North NDA

Figure 6.7              Proposed Treated Sewage Effluent (TSE) Mains in Fanling North NDA

Figure 6.8              Proposed Treated Sewage Effluent (TSE) Mains within the Study Area

 

9              Hazard to Life

 

Figure 9.1              NDA development near Sheung Shui Water Treatment Works (SSWTW)

Figure 9.2              QRA Flowchart

Figure 9.3              Societal Risk Guidelines

Figure 9.4              Implementation Plan of FLN/KTN Areas near SSWTW (Site Formation, Construction and Development)

Figure 9.5              Major Construction Work within 1 km CZ of SSWTW

Figure 9.6              Site Layout of SSWTW

Figure 9.7              Topography around SSWTW

Figure 9.8              Locations of Roads and Railway Surrounding SSWTW

Figure 9.9              FN Curves for the Construction Stage

Figure 9.10           FN Curves for the Operation Stage

Figure 9.11           Breakdown of FN curves by Accident Type (Case 6: 2030 NDA + surrounding)

Figure 9.12           IR Contours for SSWTW

 

10           Landfill Gas Hazard

 

Figure 10.1           Location of Landfill Gas Consultation Zone within NENT NDAs

Figure 10.2           Ma Tso Lung Landfill Site and KTN NDA RODP

Figure 10.3           Drillholes in Ma Tso Lung Landfill for Landfill Gas Monitoring

Figure 10.4           Location of Surface Gas Monitoring in Ma Tso Lung Landfill

Figure 10.5           Geological Plan

 

11           CULTURAL HERITAGE

 

Figure 11.1           Declared Monuments, Graded/Proposed Graded Historic Buildings and Sites of Archaeological Interest within the CHAA

Figure 11.2           Geology Map

Figure 11.3           Test Pits and Auger Holes Conducted in previous NENT Study

Figure 11.4           Areas and Spots of Archaeological Interest

Figure 11.5           Historic Buildings and Landscape Features in KTN NDA and Associated Infrastructure Works CHAA

Figure 11.6           Historic Buildings and Landscape Features in FLN NDA and Associated Infrastructure Works CHAA (Sheet 1 of 2)

Figure 11.7           Historic Buildings and Landscape Features in FLN NDA and Associated Infrastructure Works CHAA (Sheet 2 of 2)

Figure 11.8           Evaluation for Archaeological Potential and Significance for KTN NDA CHAA

Figure 11.9           Areas of Medium Archaeological Potential with No Survey Conduct before

Figure 11.10a       Evaluation for Archaeological Potential and Significance for FLN NDA CHAA

Figure 11.10b       Evaluation for Archaeological Potential and Significance for FLN NDA CHAA

 

12           Landscape and Visual Impact Assessment  

 

 

Figure 12.0.0        Aerial photograph of Study Area (Key Plan)

Figure 12.0.1        Aerial photograph of the Study Area for Kwu Tung North (KTN) NDA

Figure 12.0.2.1     Aerial photograph of the Study Area for Fanling (FLN) NDA (1 of 2)

Figure 12.0.2.2     Aerial photograph of the Study Area for Fanling (FLN) NDA (2 of 2)

Figure 12.1.0        Existing Zonings within the Study Area for KTN NDA

Figure 12.2.0.1     Existing Zonings within the Study Area for FLN NDA (1 of 2)

Figure 12.2.0.2     Existing Zonings within the Study Area for FLN NDA (2 of 2)

Figure 12.5.0        Landscape Resources (LRs) in the Study Area for KTN NDA (Key Plan)

Figure 12.5.1        Landscape Resources (LRs) in the Study Area for KTN NDA (1 of 8)

Figure 12.5.2        Landscape Resources (LRs) in the Study Area for KTN NDA (2 of 8)

Figure 12.5.3        Landscape Resources (LRs) in the Study Area for KTN NDA (3 of 8)

Figure 12.5.4        Landscape Resources (LRs) in the Study Area for KTN NDA (4of 8)

Figure 12.5.5        Landscape Resources (LRs) in the Study Area for KTN NDA (5 of 8)

Figure 12.5.6        Landscape Resources (LRs) in the Study Area for KTN NDA (6 of 8)

Figure 12.5.7        Landscape Resources (LRs) in the Study Area for KTN NDA (7 of 8)

Figure 12.5.8        Landscape Resources (LRs) in the Study Area for KTN NDA (8 of 8)

Figure 12.5.9        Photographs of Landscape Resources (LRs) in KTN NDA Study Area (1 of 12)

Figure 12.5.10      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (2 of 12)

Figure 12.5.11      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (3 of 12)

Figure 12.5.12      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (4 of 12)

Figure 12.5.13      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (5 of 12)

Figure 12.5.14      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (6 of 12)

Figure 12.5.15      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (7 of 12)

Figure 12.5.16      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (8 of 12)

Figure 12.5.17      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (9 of 12)

Figure 12.5.18      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (10 of 12)

Figure 12.5.19      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (11 of 12)

Figure 12.5.20      Photographs of Landscape Resources (LRs) in KTN NDA Study Area (12 of 12)

Figure 12.6.0        Landscape Resources (LRs) in the Study Area for FLN NDA (Key Plan)

Figure 12.6.1        Landscape Resources (LRs) in the Study Area for FLN NDA (1 of 7)

Figure 12.6.2        Landscape Resources (LRs) in the Study Area for FLN NDA (2 of 7)

Figure 12.6.3        Landscape Resources (LRs) in the Study Area for FLN NDA (3 of 7)

Figure 12.6.4        Landscape Resources (LRs) in the Study Area for FLN NDA (4 of 7)

Figure 12.6.5        Landscape Resources (LRs) in the Study Area for FLN NDA (5 of 7)

Figure 12.6.6        Landscape Resources (LRs) in the Study Area for FLN NDA (6 of 7)

Figure 12.6.7        Landscape Resources (LRs) in the Study Area for FLN NDA (7 of 7)

Figure 12.6.8        Photographs of Landscape Resources (LRS) in FLN NDA Study Area (1 of 10)

Figures 12.6.9      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (2 of 10)

Figure 12.6.10      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (3 of 10)

Figure 12.6.11      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (4 of 10)

Figure 12.6.12      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (5 of 10)

Figure 12.6.13      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (6 of 10)

Figure 12.6.14      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (7 of 10)

Figure 12.6.15      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (8 of 10)

Figure 12.6.16      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (9 of 10)

Figure 12.6.17      Photographs of Landscape Resources (LRS) in FLN NDA Study Area (10 of 10)

Figure 12.7.0        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (Key Plan)

Figure 12.7.1        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (1 of 8)

Figure 12.7.2        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (2 of 8)

Figure 12.7.3        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (3 of 8)

Figure 12.7.4        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (4 of 8)

Figure 12.7.5        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (5 of 8)

Figure 12.7.6        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (6 of 8)

Figure 12.7.7        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (7 of 8)

Figure 12.7.8        Landscape Character Areas (LCAs) in the Study Area for KTN NDA (8 of 8)

Figure 12.7.9        Photographs of Landscape Character Areas (LCAs) in KTN NDA Study Area (1 of 2)

Figure 12.7.10      Photographs of Landscape Character Areas (LCAs) in KTN NDA Study Area (2 of 2)

Figure 12.8.0        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (Key Plan)

Figure 12.8.1        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (1 of 7)

Figure 12.8.2        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (2 of 7)

Figure 12.8.3        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (3 of 7)

Figure 12.8.4        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (4 of 7)

Figure 12.8.5        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (5 of 7)

Figure 12.8.6        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (6 of 7)

Figure 12.8.7        Landscape Character Areas (LCAs) in the Study Area for FLN NDA (7 of 7)

Figure 12.8.8        Photographs of Landscape Character Areas (LCAs) in FLN NDA Study Area (1 of 2)

Figure 12.8.9        Photographs of Landscape Character Areas (LCAs) in FLN NDA Study Area (2 of 2)

Figure 12.9.0        RODP for KTN NDA

Figure 12.9.1        RODP Development Parameters in KTN NDA Study Area (1 of 2)

Figure 12.9.2        RODP Development Parameters in KTN NDA Study Area (2 of 2)

Figure 12.9.3        RODP for KTN NDA Highlighting Urban Planning Context of original RODP

Figure 12.9.4        RODP for KTN NDA Highlighting Planning Measures incorporated into RODP (1 of 2)

Figure 12.9.5        RODP for KTN NDA Highlighting Planning Measures incorporated into RODP (2 of 2)

Figure 12.10.0.1  RODP for FLN NDA (1 of 2)

Figure 12.10.0.2  RODP for FLN NDA (2 of 2)

Figure 12.10.1      RODP Development Parameters in FLN NDA Study Area (1 of 2)

Figure 12.10.2      RODP Development Parameters in FLN NDA Study Area (2 of 2)

Figure 12.10.3      RODP for FLN NDA Highlighting Urban Planning Context of original RODP

Figure 12.10.4      RODP for FLN NDA Highlighting Planning Measures incorporated into RODP (1 of 2)

Figure 12.10.5      RODP for FLN NDA Highlighting Planning Measures incorporated into RODP (2 of 2)

Figure 12.11.0      Impacts on Landscape Resources (LRs) in the Study Area for KTN NDA (Key Plan)

Figure 12.11.1      Impacts on Landscape Resources (LRs) in the Study Area for KTN NDA (1 of 4)

Figure 12.11.2      Impacts on Landscape Resources (LRs) in the Study Area for KTN NDA (2 of 4)

Figure 12.11.3      Impacts on Landscape Resources (LRs) in the Study Area for KTN NDA (3 of 4)

Figure 12.11.4      Impacts on Landscape Resources (LRs) in the Study Area for KTN NDA (4 of 4)

Figure 12.11.5a   Cut / Fill Contour Plan for KTN NDA

Figure 12.11.5b   Cut / Fill Contour Plan for KTN NDA

Figure 12.11.5c    Cut / Fill Contour Plan for KTN NDA

Figure 12.11.5d   Cut / Fill Contour Plan for KTN NDA

Figure 12.11.6      Section Drawings of Water Service Reservoirs in KTN NDA

Figure 12.11.7      Topographic model of KTN Flushing and Fresh Water Service Reservoirs at G1-4 and G1-5

Figure 12.12.0      Impacts on Landscape Resources (LRs) in the Study Area for FLN NDA (Key Plan)

Figure 12.12.1      Impacts on Landscape Resources (LRs) in the Study Area for FLN NDA (1 of 4)

Figure 12.12.2      Impacts on Landscape Resources (LRs) in the Study Area for FLN NDA (2 of 4)

Figure 12.12.3      Impacts on Landscape Resources (LRs) in the Study Area for FLN NDA (3 of 4)

Figure 12.12.4      Impacts on Landscape Resources (LRs) in the Study Area for FLN NDA (4 of 4)

Figure 12.12.5a   Cut / Fill Contour Plan for FLN NDA

Figure 12.12.5b   Cut / Fill Contour Plan for FLN NDA

Figure 12.12.5c    Cut / Fill Contour Plan for FLN NDA

Figure 12.12.5d   Cut / Fill Contour Plan for FLN NDA

Figure 12.12.6      Section Drawings of Fresh Water Service Reservoirs in FLN NDA

Figure 12.12.7      Section Drawings of Flushing Water Service Reservoirs in FLN NDA

Figure 12.12.8      Topographic model of FLN Fresh Water Service Reservoir at A3-1

Figure 12.12.9      Topographic model of FLN Flushing Water Service Reservoir at D4-1

Figure 12.13.0      Impacts on Landscape Character Areas (LCAs) in the Study Area for KTN NDA (Key Plan)

Figure 12.13.1      Impacts on Landscape Character Areas (LCAs) in the Study Area for KTN NDA (1 of 4)

Figure 12.13.2      Impacts on Landscape Character Areas (LCAs) in the Study Area for KTN NDA (2 of 4)

Figure 12.13.3      Impacts on Landscape Character Areas (LCAs) in the Study Area for KTN NDA (3 of 4)

Figure 12.13.4      Impacts on Landscape Character Areas (LCAs) in the Study Area for KTN NDA (4 of 4)

Figure 12.14.0      Impacts on Landscape Character Areas (LCAs) in the Study Area for FLN NDA (Key Plan)

Figures 12.14.1    Impacts on Landscape Character Areas (LCAs) in the Study Area for FLN NDA (1 of 4)

Figures 12.14.2    Impacts on Landscape Character Areas (LCAs) in the Study Area for FLN NDA (2 of 4)

Figures 12.14.3    Impacts on Landscape Character Areas (LCAs) in the Study Area for FLN NDA (3 of 4)

Figures 12.14.4    Impacts on Landscape Character Areas (LCAs) in the Study Area for FLN NDA (4 of 4)

Figure 12.15.0      KTN NDA Landscape Mitigation Plan (Key Plan)

Figure 12.15.1      KTN NDA Landscape Mitigation Plan (Zoom A)

Figure 12.15.2      KTN NDA Landscape Mitigation Plan (Zoom B)

Figure 12.15.3      KTN NDA Landscape Mitigation Plan (Zoom C)

Figure 12.15.4      KTN NDA Landscape Mitigation Plan (Zoom D)

Figure 12.15.5      KTN NDA Landscape Mitigation Plan (Zoom E)

Figure 12.15.6      KTN NDA Landscape Mitigation Plan (Zoom F)

Figure 12.15.7      KTN NDA Landscape Mitigation Plan (Zoom G)

Figure 12.16.0      FLN NDA Landscape Mitigation Plan (Key Plan)

Figure 12.16.1      FLN NDA Landscape Mitigation Plan (Zoom A)

Figure 12.16.2      FLN NDA Landscape Mitigation Plan (Zoom B)

Figure 12.16.3      FLN NDA Landscape Mitigation Plan (Zoom C)

Figure 12.16.4      FLN NDA Landscape Mitigation Plan (Zoom D)

Figure 12.16.5      FLN NDA Landscape Mitigation Plan (Zoom E)

Figure 12.18.0      Visual Envelope for KTN NDA + Visual Sensitive Receiver (VSR) & Vantage Point (VP) Locations

Figure 12.18.1      Primary Zone of Visual Influence for KTN NDA + VSR & VP Locations

Figure 12.19.0      Visual Envelope for FLN NDA + Visual Sensitive Receiver (VSR) & Vantage Point (VP) Locations

Figure 12.19.1      Primary Zone of Visual Influence for FLN NDA + VSR & VP Locations

Figure 12.20.1      Existing View towards KTN NDA from K1 Ma Tso Lung San Tsuen

Figure 12.20.2.1  Existing View towards KTN NDA from K2a (F30) Tai Shek Mo Lookout

Figure 12.20.2.2  Existing View towards FLN NDA and KTN NDA from K2b (F30) Tai Shek Mo Footpath & Lookout

Figure 12.20.3      Existing View towards KTN NDA from K3 Western Ranges - Lok Ma Chau Footpath

Figure 12.20.4      Existing View towards KTN NDA from K4 Cottage Area (Western Ranges)

Figure 12.20.5.1  Existing View North from K5a Northern Knoll of Fung Kong Shan

Figure 12.20.5.2  Existing View South towards KTN NDA from K5a Northern Knoll of Fung Kong Shan

Figure 12.20.5.3  Existing View North towards KTN NDA from K5b Southern Knoll of Fung Kong Shan

Figure 12.20.5.4  Existing View South towards KTN NDA from K5b Southern Knoll of Fung Kong Shan

Figure 12.20.5.5  Existing View East towards KTN NDA from K5a/b Knoll of Fung Kong Shan

Figure 12.20.6.1  Existing View towards East within KTN NDA from K6a Ho Sheung Heung

Figure 12.20.6.2  Existing View South from within KTN NDA, at Southern K6b Ho Sheung Heung

Figure 12.20.7.1  Existing View West towards KTN NDA from K7a Tsung Yuen

Figure 12.20.7.2  Existing View Southwest towards KTN NDA from Ho Sheung Heung Road entrance to K7b Tsung Yuen

Figure 12.20.8      Existing View towards KTN NDA from K8 MTR East Rail line north of Sheung Shui cycle track

Figure 12.20.9      Existing View towards KTN NDA from K9 Long Valley Villages, northern border of Ying Kong

Figure 12.20.10   Existing View towards KTN NDA from K10 Cycle track along riverside near Long Valley

Figure 12.20.11   Existing View towards KTN NDA from K11 Cycle track west of Shek Wu Hui Sewage Treatment Works

Figure 12.20.12   Existing View towards KTN NDA from K12 Tsung Pak Long

Figure 12.20.13   Existing View towards KTN NDA from K13 Industrial Zone northeast of Tsung Pak Long

Figure 12.20.14   Existing View towards KTN NDA from K14 Tai Tau Leng

Figure 12.20.15   Existing View towards KTN NDA from K15 Choi Po Court / Choi Yuen Estate

Figure 12.20.16   Existing View towards KTN NDA from K16 Tai Ping Area High Rise Residential Blocks

Figure 12.20.17   Existing View towards KTN NDA from K17 Hong Kong Golf Club, Fanling

Figure 12.20.18   Existing View towards KTN NDA from K18 Ascot Park Area, Kam Tsin

Figure 12.20.19   Existing View towards KTN NDA from K19 Existing Road Bridge link over Fanling Highway

Figure 12.20.20   Existing View towards KTN NDA from K20 Valais & Europa Garden

Figure 12.20.21   Existing View towards KTN NDA from K21 Kwu Tung Service Reservoir

Figure 12.20.22   Existing View towards KTN NDA and FLN NDA from K22 (F28) Ki Lun Shan Footpath

Figure 12.20.23   Existing View towards KTN NDA from K23 Chau Tau Village

Figure 12.20.24   Existing View towards KTN NDA from K24 Kei Lak Tsai Footpath in Lam Tsuen Country Park

Figure 12.21.1      Existing View towards FLN NDA from F1 Cottage Area Lining Fu Tei Au Road

Figure 12.21.2      Existing View towards FLN NDA from F2 Existing Settlements around Sheung Shui Wa Shan

Figure 12.21.3      Existing View towards FLN NDA from F3 Tsung Shan, High Hill

Figure 12.21.4      Existing View towards FLN NDA from F4 Siu Hang San Tsuen

Figure 12.21.5      Existing View towards FLN NDA from F5 Kan Lung Tsuen Area

Figure 12.21.6      Existing View towards FLN NDA from F6 Sha Tau Kok Road

Figure 12.21.7      Existing View towards FLN NDA & Eastern Fanling Bypass, from F7 Ma Wat Tsuen Area

Figure 12.21.8      Existing View towards FLN NDA & Eastern Fanling Bypass, from F8 Shung Him Tong

Figure 12.21.9      Existing View towards FLN NDA & Eastern Fanling Bypass from F9 Heritage Trail (S of Sha Tau Kok Rd)

Figure 12.21.10   Existing View towards FLN NDA from F10 Po Kat Tsai

Figure 12.21.11   Existing View towards FLN NDA from F11 Belair Monte & Regentville

Figure 12.21.12   Existing View towards FLN NDA from F12 Wing Fai Centre & Wing Fok Centre

Figure 12.21.13   Existing View towards FLN NDA from F13 Fanling Garden

Figure 12.21.14   Existing View towards FLN NDA from F14 Good View New Village/ Ling Shan Tsuen

Figure 12.21.15   Existing View towards FLN NDA from F15 Noble Hill

Figure 12.21.16   Existing View towards FLN NDA from F16 Fanling Wai

Figure 12.21.17   Existing View towards FLN NDA from F17 North District Park

Figure 12.21.18   Existing View towards FLN NDA from F18 Ka Fuk Estate Area

Figure 12.21.19   Existing View towards FLN NDA from F19 On Kwok Villa

Figure 12.21.20   Existing View towards FLN NDA from F20 High Rise Residential buildings around Tin Ping Estate

Figure 12.21.21   Existing View towards FLN NDA from F21 North District Sports Ground

Figure 12.21.22   Existing View towards FLN NDA from F22 Tsui Lai Garden

Figure 12.21.23   Existing View towards FLN NDA from F23 Fung Kai Area

Figure 12.21.24   Existing View towards FLN NDA from F24 Sheung Shui Wai Area

Figure 12.21.25   Existing View towards FLN NDA from F25 Industrial Zone SW of Sheung Shui Wai

Figure 12.21.26   Existing View towards FLN NDA from F26 (K6a) Ho Sheung Heung

Figure 12.21.27   Existing View towards FLN NDA from F27 Tsung Yuen

Figure 12.21.28   Existing View towards FLN NDA and KTN NDA from F28 (K22) Ki Lun Shan Footpath

Figure 12.21.29   Existing View towards FLN NDA from F29 Wu Tip Shan Lookout

Figure 12.21.30   Existing View towards FLN NDA and KTN NDA from F30 (K2b) Tai Shek Mo Footpath & Lookout

Figure 12.22.1a   Photomontage from K1 Ma Tso Lung San Tsuen, looking towards KTN NDA (1 of 2)

Figure 12.22.1b   Photomontage from K1 Ma Tso Lung San Tsuen, looking towards KTN NDA (2 of 2)

Figure 12.22.2.1a                Photomontage from K2a(F30) Tai Shek Mo Lookout, looking towards KTN NDA (1 of 2)

Figure 12.22.2.1b                Photomontage from K2a (F30) Tai Shek Mo Lookout, looking towards KTN NDA (2 of 2)

Figure 12.22.2.2a                Photomontage from K2b (F30) Tai Shek Mo Footpath & Lookout looking towards KTN NDA (1 of 2)

Figure 12.22.2.2b                Photomontage from K2b (F30) Tai Shek Mo Footpath & Lookout looking towards KTN NDA (2 of 2)

Figure 12.22.3a   Photomontage from K3 Western Range - Lok Ma Chau Footpath, looking towards KTN NDA (1 of 2)

Figure 12.22.3b   Photomontage from K3 Western Range - Lok Ma Chau Footpath, looking towards KTN NDA (2 of 2)

Figure 12.22.4a   Photomontage from K4 Cottage Area (Western Range), looking towards KTN NDA (1 of 2)

Figure 12.22.4b   Photomontage from K4 Cottage Area (Western Range), looking towards KTN NDA (2 of 2)

Figure 12.22.5.1a                Photomontage from K5a Northern Knoll of Fung Kong Shan, looking south towards KTN NDA (1 of 2)

Figure 12.22.5.1b                Photomontage from K5a Northern Knoll of Fung Kong Shan, looking south towards KTN NDA (2 of 2)

Figure 12.22.5.2a                Photomontage from K5a Northern Knoll of Fung Kong Shan, looking north towards KTN NDA (1 of 2)

Figure 12.22.5.2b                Photomontage from K5a Northern Knoll of Fung Kong Shan, looking north towards KTN NDA (2 of 2)

Figure 12.22.6a   Photomontage from K5a/b Knoll of Fung Kong Shan, looking East towards KTN NDA (1 of 2)

Figure 12.22.6b   Photomontage from K5a/b Knoll of Fung Kong Shan, looking East towards KTN NDA (2 of 2)

Figure 12.22.7a   Photomontage from K6b Ho Sheung Heung, looking towards KTN NDA (1 of 2)

Figure 12.22.7b   Photomontage from K6b Ho Sheung Heung, looking towards KTN NDA (2 of 2)

Figure 12.22.8a   Photomontage from K7b Tsung Yuen, looking towards KTN NDA (1 of 2)

Figure 12.22.8b   Photomontage from K7b Tsung Yuen, looking towards KTN NDA (2 of 2)

Figure 12.22.9a   Photomontage from K10 Cycle track along riverside near Long Valley, looking West towards KTN NDA (1 of 2)

Figure 12.22.9b   Photomontage from K10 Cycle track along riverside near Long Valley, looking West towards KTN NDA (2 of 2)

Figure 12.22.10a Photomontage from K15 Choi Po Court / Choi Yuen Estate, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.22.10b Photomontage from K15 Choi Po Court / Choi Yuen Estate, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.22.11a Photomontage from K18 Ascot Park Area, looking towards KTN NDA (1 of 2)

Figure 12.22.11b Photomontage from K18 Ascot Park Area, looking towards KTN NDA (2 of 2)

Figure 12.22.12a Photomontage from K19 Existing Road Bridge link over Fanling Highway, looking towards KTN NDA (1 of 2)

Figure 12.22.12b Photomontage from K19 Existing Road Bridge link over Fanling Highway, looking towards KTN NDA (2 of 2)

Figure 12.22.13a Photomontage from K22 Ki Lun Shan Footpath, looking towards KTN NDA (1 of 2)

Figure 12.22.13b Photomontage from K22 Ki Lun Shan Footpath, looking towards KTN NDA (2 of 2)

Figure 12.22.14a Photomontage from K24 Kei Lak Tsai Footpath in Lam Tsuen Country Park, looking towards KTN NDA (1 of 2)

Figure 12.22.14b Photomontage from K24 Kei Lak Tsai Footpath in Lam Tsuen Country Park, looking towards KTN NDA (2 of 2)

Figure 12.23.1a   Photomontage from F2 Existing Settlements around Sheung Shui Wa Shan, looking towards FLN NDA (1 of 2)

Figure 12.23.1b   Photomontage from F2 Existing Settlements around Sheung Shui Wa Shan, looking towards FLN NDA (2 of 2)

Figure 12.23.2a   Photomontage from F3 Tsung Shan, High Hill, looking towards FLN NDA (1 of 2)

Figure 12.23.2b   Photomontage from F3 Tsung Shan, High Hill, looking towards FLN NDA (2 of 2)

Figure 12.23.3a   Photomontage from F5 Kan Lung Tsuen Area, looking towards FLN NDA (1 of 2)

Figure 12.23.3b   Photomontage from F5 Kan Lung Tsuen Area, looking towards FLN NDA (2 of 2)

Figure 12.23.4a   Photomontage from F7 Ma Wat Tsuen Area, looking towards FLN NDA (1of 2)

Figure 12.23.4b   Photomontage from F7 Ma Wat Tsuen Area, looking towards FLN NDA (2of 2)

Figure 12.23.5a   Photomontage from F11 Belair Monte & Regentville, looking towards FLN NDA (1 of 2)

Figure 12.23.5b   Photomontage from F11 Belair Monte & Regentville, looking towards FLN NDA (2 of 2)

Figure 12.23.6a   Photomontage from F14 Good View New Village/Ling Shan Tsuen, looking towards FLN NDA (1 of 2)

Figure 12.23.6b   Photomontage from F14 Good View New Village/Ling Shan Tsuen, looking towards FLN NDA (2 of2)

Figure 12.23.7a   Photomontage from F15 Noble Hill, looking towards FLN NDA (1 of 2)

Figure 12.23.7b   Photomontage from F15 Noble Hill, looking towards FLN NDA (2 of 2)

Figure 12.23.8a   Photomontage from F16 Fanling Wai, looking West towards FLN NDA (1 of 2)

Figure 12.23.8b   Photomontage from F16 Fanling Wai, looking West towards FLN NDA (2 of 2)

Figure 12.23.9a   Photomontage from F17 North District Park, looking West towards FLN NDA (1 of 2)

Figure 12.23.9b   Photomontage from F17 North District Park, looking West towards FLN NDA (2 of 2)

Figure 12.23.10a Photomontage from F20 High Rise Residential buildings around Tin Ping Estate, looking towards FLN NDA (1 of 2)

Figure 12.23.10b Photomontage from F20 High Rise Residential buildings around Tin Ping Estate, looking towards FLN NDA (2 of 2)

Figure 12.23.11a Photomontage from F21 North District Sports Ground, looking towards FLN NDA (1 of 2)

Figure 12.23.11b Photomontage from F21 North District Sports Ground, looking towards FLN NDA (2 of 2)

Figure 12.23.12a Photomontage from F24 Sheung Shui Wai Area, looking towards FLN NDA (1 of 2)

Figure 12.23.12b Photomontage from F24 Sheung Shui Wai Area, looking towards FLN NDA (2 of 2)

Figure 12.23.13a Photomontage from F26 (K6) Ho Sheung Heung, looking towards FLN NDA (1 of 2)

Figure 12.23.13b Photomontage from F26 (K6) Ho Sheung Heung, looking towards FLN NDA (2 of 2)

Figure 12.23.14a Photomontage from F28 (K22) Ki Lun Shan, looking towards FLN NDA (1 of 2)

Figure 12.23.14b Photomontage from F28 (K22) Ki Lun Shan, looking towards FLN NDA (2 of 2)

Figure 12.23.15a Photomontage from F29 Wu Tip Shan Lookout, looking towards FLN NDA (1 of 2)

Figure 12.23.15b Photomontage from F29 Wu Tip Shan Lookout, looking towards FLN NDA (2 of 2)

Figure 12.23.16a Photomontage from F30 (K2) Tai Shek Mo Footpath & Lookout, looking towards FLN NDA (1 of 2)

Figure 12.23.16b Photomontage from F30 (K2) Tai Shek Mo Footpath & Lookout, looking towards FLN NDA (2 of 2)

Figure 12.50.1      Planning and Development Control Framework Schedule 2 DP 1, 2, 3 and 4

Figure 12.50.2      Planning and Development Control Framework - Schedule 2 DP 5

Figure 12.50.3      Planning and Development Control Framework - Schedule 2 DP 7, 11 and 13

Figure 12.50.4      Planning and Development Control Framework - Schedule 2 DP 8, 9, 10 and 12

Figure 12.51.1      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) Key Plan

Figure 12.51.2      Landscape Resources (LRs) DP Package B (5) Key Plan

Figure 12.51.3      Landscape Resources (LRs) DP Package C (7, 11 and 13) Key Plan

Figure 12.51.4      Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) Key Plan

Figure 12.51.5      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 1 of 6)

Figure 12.51.6      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 2 of 6)

Figure 12.51.7      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 3 of 6)

Figure 12.51.8      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 4 of 6)

Figure 12.51.9      Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 5 of 6)

Figure 12.51.10   Landscape Resources (LRs) DP Package A (1, 2, 3 and 4) (sheet 6 of 6)

Figure 12.51.11   Landscape Resources (LRs) DP Package B (5) (sheet 1 of 2)

Figure 12.51.12   Landscape Resources (LRs) DP Package B (5) (sheet 2 of 2)

Figure 12.51.13   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 1 of 6)

Figure 12.51.14   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 2 of 6)

Figure 12.51.15   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 3 of 6)

Figure 12.51.16   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 4 of 6)

Figure 12.51.17   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 5 of 6)

Figure 12.51.18   Landscape Resources (LRs) DP Package C (7, 11 and 13) (sheet 6 of 6)

Figure 12.51.19   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 1 of 9)

Figure 12.51.20   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 2 of 9)

Figure 12.51.21   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 3 of 9)

Figure 12.51.22   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 4 of 9)

Figure 12.51.23   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 5 of 9)

Figure 12.51.24   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 6 of 9)

Figure 12.51.25   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 7 of 9)

Figure 12.51.26   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 8 of 9)

Figure 12.51.27   Landscape Resources (LRs) DP Package D (8, 9, 10 and 12) (sheet 9 of 9)

Figure 12.51.30   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.31   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.32   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.33   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.34   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.35   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.36   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.37   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.38   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.39   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.40   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.41   Photographs of Landscape Resources (LRs) DP Package A (DP 1, 2, 3 and 4)

Figure 12.51.42   Photographs of Landscape Resources (LRs) DP Package B (DP 5)

Figure 12.51.43   Photographs of Landscape Resources (LRs) DP Package B (DP 5)

Figure 12.51.44   Photographs of Landscape Resources (LRs) DP Package B (DP 5)

Figure 12.51.45   Photographs of Landscape Resources (LRs) DP Package B (DP 5)

Figure 12.51.46   Photographs of Landscape Resources (LRs) DP Package B (DP 5)

Figure 12.51.47   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.48   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.49   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.50   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.51   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.52   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.53   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.54   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.55   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.56   Photographs of Landscape Resources (LRs) DP Package C (DP 7, 11 and 13)

Figure 12.51.57   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.58   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.59   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.60   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.61   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.62   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.63   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.64   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.65   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.66   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.51.67   Photographs of Landscape Resources (LRs) DP Package D (DP 8, 9, 10 and 12)

Figure 12.52.1      Landscape Character Areas (LCAs) DP Package A (1, 2, 3 and 4)

Figure 12.52.2      Landscape Character Areas (LCAs) DP Package B (5)

Figure 12.52.3      Landscape Character Areas (LCAs) DP Package C (7, 11 and 13)

Figure 12.52.4      Landscape Character Areas (LCAs) DP Package D (8, 9, 10 and 12) Key Plan

Figure 12.52.5      Photographs of Landscape Character Areas (LCAs) – DP Package A (DP 1, 2 ,3 and 4)

Figure 12.52.6      Photographs of Landscape Character Areas (LCAs) – DP Package A (DP 1, 2, 3 and 4)

Figure 12.52.7      Photographs of Landscape Character Areas (LCAs) – DP Package B (DP 5)

Figure 12.52.8      Photographs of Landscape Character Areas (LCAs) – DP Package B (DP 5)

Figure 12.52.9      Photographs of Landscape Character Areas (LCAs) – DP Package C (DP 7, 11 and 13)

Figure 12.52.10   Photographs of Landscape Character Areas (LCAs) – DP Package C (DP 7, 11 and 13)

Figure 12.52.11   Photographs of Landscape Character Areas (LCAs) – DP Package D (DP 8, 9, 10 and 12)

Figure 12.52.12   Photographs of Landscape Character Areas (LCAs) – DP Package D (DP 8, 9, 10 and 12)

Figure 12.52.20   Impact on Landscape Resources DP Package A (1, 2, 3 and 4) Key Plan

Figure 12.52.21   Impact on Landscape Resources DP Package B (5) Key Plan

Figure 12.52.22   Impact on Landscape Resources DP Package C (7, 11 and 13) Key Plan

Figure 12.52.23   Impact on Landscape Resources - DP Package D (8, 9, 10 and 12) Key Plan

Figure 12.52.24   Impact on Landscape Resources DP 1 (sheet 1 of 3)

Figure 12.52.25   Impact on Landscape Resources DP 1 (sheet 2 of 3)

Figure 12.52.26   Impact on Landscape Resources DP 1 (sheet 3 of 3)

Figure 12.52.27   Impact on Landscape Resources DP 2 (sheet 1 of 2)

Figure 12.52.28   Impact on Landscape Resources DP 2 (sheet 2 of 2)

Figure 12.52.29   Impact on Landscape Resources DP 3 (sheet 1 of 1)

Figure 12.52.30   Impact on Landscape Resources DP 4 (sheet 1 of 2)

Figure 12.52.31   Impact on Landscape Resources DP 4 (sheet 2 of 2)

Figure 12.52.32   Impact on Landscape Resources DP 5 (sheet 1 of 1)

Figure 12.52.33   Impact on Landscape Resources DP 7 (sheet 1 of 2)

Figure 12.52.36   Impact on Landscape Resources DP 7 (sheet 2 of 2)

Figure 12.52.37   Impact on Landscape Resources DP 8 (sheet 1 of 1)

Figure 12.52.38   Impact on Landscape Resources DP 9 (sheet 1 of 1)

Figure 12.52.39   Impact on Landscape Resources DP 10 (sheet 1 of 3)

Figure 12.52.40   Impact on Landscape Resources DP 10 (sheet 2 of 3)

Figure 12.52.41   Impact on Landscape Resources DP 10 (sheet 3 of 3)

Figure 12.52.34   Impact on Landscape Resources DP 11 (sheet 1 of 1)

Figure 12.52.42   Impact on Landscape Resources DP 12 (sheet 1 of 1)

Figure 12.52.35   Impact on Landscape Resources DP 13 (sheet 1 of 1)

Figure 12.52.50   KTN NDA Landscape Mitigation Plan (Key Plan)

Figure 12.52.51   KTN NDA Landscape Mitigation Plan (Zoom A)

Figure 12.52.52   KTN NDA Landscape Mitigation Plan (Zoom B)

Figure 12.52.53   KTN NDA Landscape Mitigation Plan (Zoom C)

Figure 12.52.54   KTN NDA Landscape Mitigation Plan (Zoom D)

Figure 12.52.55   KTN NDA Landscape Mitigation Plan (Zoom E)

Figure 12.52.56   KTN NDA Landscape Mitigation Plan (Zoom F)

Figure 12.52.61   Zoom In Plan for Proposed KTN Sewage Pumping Station (SPS) South of Ho Sheung Heung

Figure 12.52.62   Zoom In Plan for Proposed KTN Sewage Pumping Station (SPS) South of Ma Tso Lung

Figure 12.52.70   FLN NDA Landscape Mitigation Plan (Key Plan)

Figure 12.52.71   FLN NDA Landscape Mitigation Plan (Zoom A)

Figure 12.52.72   FLN NDA Landscape Mitigation Plan (Zoom B)

Figure 12.52.73   FLN NDA Landscape Mitigation Plan (Zoom C)

Figure 12.52.74   FLN NDA Landscape Mitigation Plan (Zoom D)

Figure 12.52.75   FLN NDA Landscape Mitigation Plan (Zoom E)

Figure 12.52.81   Sections for Po Shek Wu Interchange Improvement (Sheet 1 of 2)

Figure 12.52.82   Sections for Po Shek Wu Interchange Improvement (Sheet 2 of 2)

Figure 12.52.84   Sections for Fanling Bypass (Sheet 1 of 3)

Figure 12.52.85   Sections for Fanling Bypass (Sheet 2 of 3)

Figure 12.52.86   Sections for Fanling Bypass (Sheet 3 of 3)

Figure 12.52.87   Sections for Proposed Expansion and Upgrading of Sewage Treatment Works

Figure 12.52.88   Sections for Proposed Expansion and Upgrading of Sewage Treatment Works

Figure 12.52.91   Zoom In Plan for Proposed FLN Sewage Pumping Station (SPS) Off Man Kam To Road

Figure 12.52.92   Zoom In Plan for Proposed FLN Sewage Pumping Station (SPS) South of Wa Shan

Figure 12.52.93   Zoom In Plan for Proposed FLN Sewage Pumping Station (SPS) Opposite Sacred Hill

Figure 12.52.94   Zoom In Plan for Proposed FLN Sewage Pumping Station (SPS) South of Fu Tei Au

Figure 12.53.1      Vantage Point (VP) Locations - Schedule 2 DP 1, 2, 3, 4, 5 and 7.

Figure 12.53.2      Vantage Point (VP) Locations - Schedule 2 DP 7, 8, 9, 10, 11 and 12.

Figure 12.53.3      K VP 1a – Highpoint above Pak Shek Au, facing south

Figure 12.53.4      K VP 1b – Highpoint above Pak Shek Au, facing northeast

Figure 12.53.5      K VP 2 (K22) – Ki Lun Shan Footpath

Figure 12.53.6      K VP 3 – Pedestrian bridge over Fanling Highway, near Kam Tsin

Figure 12.53.7      K VP 4 (K18) – Ascot Park Area

Figure 12.53.8      K VP 5 (K16) – Residential tower, Tai Ping Estate

Figure 12.53.9      K VP 6 (K15) – Residential tower – Choi Po Court / Choi Yuen Estate

Figure 12.53.10   K VP 7 (K13) – Industrial area, northeast of Tsung Pak Long

Figure 12.53.11   K VP 8 – Ying Kong Village

Figure 12.53.12   K VP 9 (K6b) – Ho Sheung Heung Village

Figure 12.53.13   K VP 10 – Southern Knoll of Fung Kong Shan, facing north

Figure 12.53.14   K VP 11 (K4) – Cottage Area (Western Range)

Figure 12.53.15   K VP 12 – Ma Tso Lung Shun Yee San Tsuen Village

Figure 12.54.1      F VP 1 – Po Shek Wu Road adjacent Tai Tau Leng

Figure 12.54.2      F VP 2 – Residential tower, Choi Po Court, Choi Ying House

Figure 12.54.3      F VP 3 – Pedestrian footbridge, San Wan Road

Figure 12.54.4      F VP 4 – Corner of San Wan Road and San Po Street

Figure 12.54.5      FVP 5 – Chuk Wan Street adjacent Shek Wu Hui Sewage Treatment works

Figure 12.54.6      F VP 6a – Highpoint above Fu Tei Au Tseun, facing south

Figure 12.54.7      F VP 6b – Highpoint above Fu Tei Au Tseun, facing east

Figure 12.54.8      F VP 7 – Jockey Club Road, adjacent Ha Pak Tsuen

Figure 12.54.9      F VP 8 – Access road adjacent Ng Tung River, west of Wa Shan Tsuen

Figure 12.54.10   F VP 9 – Access track, Sheung Shui Wa Shan

Figure 12.54.11   F VP 10 – Access road, south of Sheung Shui Wa Shan

Figure 12.54.12   F VP 11 – Sitting out area adjacent road bridge over Ng Tung River

Figure 12.54.13   F VP 12 – Lung Sum Avenue adjacent Woodland Crest

Figure 12.54.14   F VP 13 (F20) – Residential block within Tin Ping Estate

Figure 12.54.15   F VP 14 – Footbridge north of Wu Nga Lok Yeung

Figure 12.54.16   F VP 15 (F4) from Siu Hang San Tsuen

Figure 12.54.17   F VP 16 – Residential Block Belair Monte & Regentville

Figure 12.54.18   F VP 17 – Bridge over Ma Wat River, Sha Tau Road

Figure 12.54.19   F VP 18 – Road junction west of Wing Ning Wai & Wing Ning Tsuen

Figure 12.54.20   F VP 19 – Agricultural plots, Ma Wat Wai

Figure 12.54.21   F VP 20 (F8) – Access road, Shung Him Tong

Figure 12.54.22   F VP 21 – Highpoint within On Lok Tsuen

Figure 12.54.23   F VP 22 – Bus stop, Cyber Domaine residential estate

Figure 12.54.24   F VP 23 – Pedestrian footbridge, Kau Lung Hang San Wai

Figure 12.54.25   F VP 24 – Wo Hing Road, Wo Hop Shek Village

Figure 12.54.26   F VP 25 – Residential Block, Wah Sum Estate

Figure 12.55.1a   Photomontage from K VP 2 Ki Lun Shan Footpath, looking towards KTN NDA (1 of 2)

Figure 12.55.1b   Photomontage from K VP 2 Ki Lun Shan Footpath, looking towards KTN NDA (2 of 2)

Figure 12.55.2a   Photomontage from K VP 4 Ascot Park Area, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.2b   Photomontage from K VP4 Ascot Park Area, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.3a   Photomontage from K VP 6 Choi Po Court / Choi Yuen Estate, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.3b   Photomontage from K VP 6 Choi Po Court / Choi Yuen Estate, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.4a   Photomontage from K VP 9 Ho Sheung Heung, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.4b   Photomontage from K VP 9 Ho Sheung Heung, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.5a   Photomontage from K VP10b Southern Knoll of Fung Kong Shan, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.5b   Photomontage from K VP10b Southern Knoll of Fung Kong Shan, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.6a   Photomontage from K VP11 Cottage Area (Western Range), looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.6b   Photomontage from K VP11 Cottage Area (Western Range), looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.7a   Photomontage from K VP12 Shun Yee San Tsuen, looking towards KTN Schedule 2 DPs (1 of 2)

Figure 12.55.7b   Photomontage from K VP12 Shun Yee San Tsuen, looking towards KTN Schedule 2 DPs (2 of 2)

Figure 12.55.8a   Photomontage from F VP2 Choi Po Court, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.8b   Photomontage from F VP2 Choi Po Court, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.9a   Photomontage from F VP6a Fu Tei Au, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.9b   Photomontage from F VP6a Fu Tei Au, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.10a Photomontage from F VP6b Fu Tei Au, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.10b Photomontage from F VP6b Fu Tei Au, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.11a Photomontage from F VP13 High Rise Residential buildings around Tin Ping Estate, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.11b Photomontage from F VP13 High Rise Residential buildings around Tin Ping Estate, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.12a Photomontage from F VP14 Footbridge North of Wu Nga Lok Yeung , looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.12b Photomontage from F VP14 Footbridge North of Wu Nga Lok Yeung , looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.13a Photomontage from F VP16 Belair Monte & Regentville, looking towards FLN NDA (1 of 2)

Figure 12.55.13b Photomontage from F VP16 Belair Monte & Regentville, looking towards FLN NDA (2 of 2)

Figure 12.55.14a Photomontage from F VP17 Sha Tau Kok Road, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.14b Photomontage from F VP17 Sha Tau Kok Road, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.15a Photomontage from F VP18 Wing Ling Wai, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.15b Photomontage from F VP18 Wing Ling Wai, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.16a Photomontage from F VP21 Highpoint within On Lok Tsuen, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.16b Photomontage from F VP21 Highpoint within On Lok Tsuen, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.17a Photomontage from F VP22 Tong Hang, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.17b Photomontage from F VP22 Tong Hang, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.18a Photomontage from F VP23 Kau Lung Hang San Wai, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.18b Photomontage from F VP23 Kau Lung Hang San Wai, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.19a Photomontage from F VP24 Wo Hop Shek San Tsuen, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.19b Photomontage from F VP24 Wo Hop Shek San Tsuen, looking towards FLN Schedule 2 DPs (2 of 2)

Figure 12.55.20a Photomontage from F VP25 Residential Block, Wah Sum Estate, looking towards FLN Schedule 2 DPs (1 of 2)

Figure 12.55.20b Photomontage from F VP25 Residential Block, Wah Sum Estate, looking towards FLN Schedule 2 DPs (2 of 2)

               

13           Ecological Impact Assessment

 

Figure 13.1           Study Area and NDA Boundaries and Sites of Conservation Significance in the Surrounding Area

Figure 13.2           Non-bird Fauna Survey Coverage in the Study Area

Figure 13.3           Bird Survey Coverage in the Study Area

Figure 13.4           Shek Sheung, Ng Tung and Sheung Yue Rivers: Hydrological Conditions and Transect Routes

Figure 13.5 a        Habitats in the Study Area – Key Plan

Figure 13.5 b-v     Habitats in the Study Area (Page 1-21)

Figure 13.6 a-c     Locations of Non-avian Species of Conservation Importance and Protected Plant Species in the Study Area (Sources: IUCN (2013), Cap 96, Cap 586 and Fellowes et al. (2002)) (Page 1-3)

Figure 13.7           Findings of Egretry Flight-line Survey at Ho Sheung Heung

Figure 13.8           Findings of Egretry Flight-line Survey at Man Kam To Road

Figure 13.9 a-c     Watercourses in the Study Area (Page 1-3)

Figure 13.10 a-c  Ecological Evaluation of Plantations in the Study Area (Page 1-3)

Figure 13.11 a-b  Potential Significant Receivers and Additional Sources of Disturbance Impacts from the Project (Page 1-2)

Figure 13.12 a-b Areas Protected from Development by the NDA Proposed Zonings (Page1-2)

Figure 13.13         Habitats within the Proposed Long Valley Nature Park Boundary

Figure 13.14 a-c  Areas of Wetland and Woodland Loss and Proposed Compensatory Planting (Page1-3)

Figure 13.15 a-c  Proposed Locations of Solid Faunal Barriers adjacent to Active Works Areas during the Construction Phase of the Project (Page 1-3)

Figure 13.16a       Indicative Cross Section of Riparian Corridor at Ma Tso Lung Stream Following Diversion and Restoration

Figure 13.16b       Indicative Plan of Riparian Corridor at Ma Tso Lung Stream Following Diversion and Restoration

Figure 13.17a-b   Watercourses of Ecological Importance and Proposed Buffers (Page 1-2)

Figure 13.18a-c   Habitats in the Study Area showing the Footprint of the Project Area (Page 1-3)

 

 

14           Fisheries Impact Assessment

 

Figure 14.1           Current Status of Fish Ponds in KTN NDA Assessment Area

Figure 14.2           Current Status of Fish Ponds in FLN NDA

Figure 14.3           Construction and Operational Phase Impacts to Fisheries in KTN NDA

Figure 14.4           Construction and Operational Phase Impacts to Fisheries in FLN NDA

Figure 14.5           Potential sites for relocation of the fish fry farm from Fung Kong

 

16           Summary of Environment Outcomes

 

Figure 16.1           Minor Changes in Revised KTN NDA RODP

Figure 16.2           Minor Changes in Revised FLN NDA RODP