for
Proposed Low-rise and Low-density Residential Development
At Various Lots and their Adjoining Government Land
in D.D. 104, East of Kam Pok Road,
Mai Po, Yuen Long, N.T.
Final
Report
Prepared by
Ramboll
Environ Hong Kong Limited
in association with
ADI
Limited
AECOM
China
Point Consultants Ltd.
CKM Asia Limited
Ecosystems
Ltd.
MCAAL
Vision
Planning Consultants Ltd.
Westwood
Hong and Associates Ltd.
Date:
August 2016
Report No.:
R2057_V6.F
Main Text
List of Figures
Figure 1-1 Project
Location Plan
Figure 2-1 Master
Layout Plan of the Proposed Development and Environs
Figure 3-1 Typical
Construction Phase Environmental Monitoring and Audit Procedure
Figure
4-1 Construction
Phase Air Quality Monitoring Stations
Figure
5-1 Construction
Phase Noise Monitoring Stations
Figure 5-2 Locations
of Temporary Fixed Noise Barrier During Concurrent Construction with the
Approved Cycle Track Project and Approved Public Sewerage Project
Figure
5-3 Locations
of Operational Phase Noise Mitigation Measures
Figure 6-1 Construction
Phase Water Quality Monitoring Stations
Figure 6-2 Proposed Drainage System for Construction Stage
Figure 6-3 Proposed Drainage System for Operation Stage
Figure 7-1 Proposed
Sewer Connection for Permanent Stage (With Sewage Pumping Station)
Figure 7-2 Proposed
Sewer Connection for Interim Stage (With Sewage Treatment Plant)
Figure 9-1 Recommended Landscape Mitigation Measures ¡V
Landscape Master Plan
Figure 9-2 Recommended
Landscape Mitigation Measures ¡V Sections
Figure 9-3 Recommended
Landscape Mitigation Measures ¡V Design of Noise Mitigation
Figure 9-4 Recommended
Landscape Mitigation Measures ¡V Design of Landscape Berms
Figure 9-5 Recommended
Landscape Mitigation Measures ¡V Design of Landscape Berms
Figure 9-6 Photomontages
¡V Vantage Point A
Figure 9-7 Photomontages
¡V Vantage Point A
Figure 9-8 Photomontages
¡V Vantage Point B
Figure 9-9 Photomontages
¡V Vantage Point B
Figure 9-10 Photomontages
¡V Vantage Point C
Figure 9-11 Photomontages
¡V Vantage Point C
Figure 9-12 Photomontages
¡V Vantage Point D
Figure 9-13 Photomontages
¡V Vantage Point D
Figure 9-14 Photomontages
¡V Vantage Point E
Figure 9-15 Photomontages
¡V Vantage Point E
Figure 9-16 Photomontages
¡V Vantage Point F
Figure 9-17 Photomontages
¡V Vantage Point F
Figure 9-18 Photomontages
¡V Vantage Point G
Figure 9-19 Photomontages
¡V Vantage Point G
Figure 9-20 Photomontages
¡V Vantage Point H
Figure 9-21 Photomontages
¡V Vantage Point H
Figure 9-22 Photomontages
¡V Vantage Point I
Figure 9-23 Photomontages
¡V Vantage Point I
Figure 9-24 Recommended Landscape
Enhancement ¡V Provision of Landscape Pond
Figure 10-1 Location
of Survey Transect to be Covered During Baseline Survey and Construction Phase
Monitoring
Figure 11-1 Preliminary
Site Inspection, Deficiency and Action Report System
Figure 11-2 Complaint
¡V Response Procedures
List of Appendices
Appendix I EM&A
Implementation Schedule
Appendix
II Sample
EM&A Proforma and Record Forms
Appendix III Tentative Construction Programme
of the Project