In general, application involving diesel,
pneumatic and / or stream hammer would not
be accepted unless the construction site is
situated in Designated Geologically Difficult
Areas as specified in the Technical Memorandum.
2.
Pile
driving using excavator-mounted breaker is
a kind of percussive piling and requires a
permit.