| 2.
THE USE OF SPECIFIED POWERED MECHANICAL EQUIPMENT (SPME) FOR THE
PURPOSE OF CARRYING OUT CONSTRUCTION WORK OTHER THAN PERCUSSIVE
PILING AND/OR THE CARRYING OUT OF PRESCRIBED CONSTRUCTION WORK (PCW)
WITHIN A DESIGNATED AREA
The use of any
SPME as listed in Table A.3 in Annex A and the carrying out of any
PCW as listed in Annex B within a designated area during the restricted
hours shall require a valid Construction Noise Permit (CNP). The
considerations and procedures governing whether a CNP may be issued
for the above works are described in this Technical Memorandum.
A CNP shall
not generally be granted for the use of SPME during the restricted
hours within a designated area unless the Corrected Noise Level
(CNL) for all the SPME proposed to be used does not exceed the appropriate
Acceptable Noise Level (ANL) as determined according to A.2.1 to
A.2.6 in Annex A. Such CNP application shall be assessed in accordance
with the procedures detailed in Annex A. Notwithstanding the above,
such a permit may be granted if the application is a special case
as defined in Section 5.
The Authority
may refuse to grant a CNP for the use of powered mechanical equipment
if the Authority has reason to believe that the equipment is to
be used in conjunction with the carrying out of any PCW not being
permitted under this Technical Memorandum.
A CNP shall
not generally be granted for the carrying out of PCW within a designated
area during the restricted hours unless the application is a special
case as defined in Section 5. In this case, the applicant shall
submit a method statement for the carrying out of each type of PCW
to describe how and where such work is to be carried out together
with the CNP application for the Authority to assess in connection
with these special cases.
|