|
Guidelines
for Soakaway System
THE
SOAKAWAY SYSTEM
ii) Screen
Purpose
: To remove suspended solids and coarse matter in the wastewater.
Design
Considerations:
(a) Openings
should be sufficiently small to retain the solids but large
enough to allow the wastewater to pass through.
(b) Screenings
can be easily removed on a regular basis.
Maintenance
Requirement : Periodic removal of screenings and cleaning.

|