|
Guidelines
for Wet Muck Out
GENERAL
PRECAUTIONS
For effective
performance of a Wet Muck Out or a Hybrid system, the following
general principles should be adhered to:
(a) Check
and clean up the dung channels, screens and reception tank
regularly.
(b) Prevent
overflowing throughout the system. This may be achieved through
proper design (eg. units should be of sufficient capacity
and capability), construction and maintenance (eg. regular
desludging). Allowing overflow to occur will result in prosecution.
(c) Always
adhere to the supplier's recommended operating and maintenance
procedures.

|