Review of West Kowloon and Tsuen Wan Sewerage Master Plans - Feasibility Study - Archive
|
Final Report - Volume 1
Appendices
|
Appendix B
Water Quality Testing Results at Tsuen Wan and West Kowloon
Pollution Loading Survey at Box Culvert
Water quality objectives for Victoria Harbour (Phase I and II) and Western Buffer Water Control Zone
|
Appendix C
Uncharted Manholes in Study Area
Hydraulic Performance for Future Design Scenarios
A3 Drawings - 2006, 2011, 2016, 2021, 2030, Ultimate Development
A0 Drawings - 2006, 2011, 2016, 2021, 2030, Ultimate Development
Sewer Upgrade in Tsuen Wan, Sewer Upgrade in West Kowloon
|
Appendix D
Options Evaluation
|
Appendix E
Summary of Risk Management Workshop
Report on Value Management Workshop
Minute from Tsuen Wan Rural Committee Meeting on 17 September 2009
|
Appendix F
Enlarged Views of Proposed Sewer Alignment in Unsewered Areas
|
Appendix G
Cost Estimate
|
Final Report - Volume 2
Figures
|
1.1
2.1-2.8
3.1, 3.2, 3.3, 3.4, 3.5, 3.6 & 3.7
4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17 & 4.18-4.20
6.1-6.4
7.1-7.10, 7.11-7.22, 7.23-7.25, 7.26-7.31, 7.32-7.37, 7.38-7.41 & 7.42-7.45
8.1-8.11, 8.12-8.21, 8.22, 8.23-8.41 & 8.42-8.43
9.1-9.5, 9.6-9.11, 9.12-9.16 & 9.17-9.20
11.1
|
Executive Summary
|
|
|
|