Landslide
Preventive Works for slope along Clear Water Bay Road
The
project involved a number of slope stabilisation works along
Clear Water Bay Road.
Environmental Concern
The
site was immediately next to Clear Water Bay Road. Since the
project involved the drilling of a large number of holes on
the slope, the potential dust nuisance was the major concern.

Location of slope stabilization
|

Dust from slope stabilization activities affect passers-by |
Measures Adopted
Dust
Cover and Watering - A mobile drilling machine was being
used to drill holes on the slope. To prevent dust emission
during the drilling operation, the top of the machine was
totally enclosed and water spray was applied to prevent dust
from escaping out of the working area.

The drill was covered up
and provided with water spray inside while drilling on
the slope took place. |
 |
 |
Observations
& Achievements
The
arrangement of enclosing the working part of the drilling
machine together with the provision of water spray to control
dust generation was found to be very effective.
|