Slope
Stabilisation Works at Tai Hang & the Kennedy Town, Hong Kong
These
are two slope stabilisation works projects, respectively at
Lai Tak Tsuen at Tai Hang, and Kwun Lung Lau, Kennedy Town.
Measures
Adopted
Restriction
- The number of drilling rigs on slope was reduced.
Dust
Cover - The top, the front and one of the two
sides of the drilling area were covered. Dusty materials
were stored in bags.
Watering
- Water was sprayed continuously to wet the dust particles
during the drilling operation.
|

The
drilling area of the slope works at Kwun Lung Lau was
enclosed by impervious sheeting |
| |
|

The
drilling area of the slope works at Lai Tak Tsuen was
enclosed by impervious sheeting
|
|

 |
Dusty
materials after drilling operation were collected in bags
|
 |
|
Small
amount of water was continuously sprayed during the drilling
operation |
|
|
Observations
& Achievements
With
the adoption of these measures on-site, the dust emissions
were effectively kept within the working area.
|