Measures
Adopted
Watering
- A vehicle-washing basin was built to wash every vehicle
that left the site, and the main haul road was wetted to suppress
fugitive dust from the moving traffic.
Administration
- All bypass exits were blocked to prevent any vehicle from
leaving the site without washing. Workers were deployed to
ensure that all vehicles were thoroughly washed before leaving
the site.
|