MTRC
Quarry Bay Congestion Relief Works
This
project involved the construction of additional railway tunnel between
Quarry Bay and Fortress Hill.
Environmental Concern
It
consisted of the construction of a 6.3 m diameter, 2 km long twin-tube
tunnel parallel to an existing underground railway tunnel under
a densely populated area in North Point. Noise arising from round-the-clock
tunnel-boring work was the major concern of the residents.
 |

Tunnel
boring work under residential area |
Measures
Adopted
Patrolling
- Additional patrolling was conducted to ensure closing of tunnel
shaft openings at night to reduce noise from underground work.
Administration
- Specific complaint hotline and an Environmental Management System
were set up by MTRC to ensure quick response to complaints.
Monitoring
- Daytime noise level monitoring was conducting for the boring works
through noise sensitive area. When the noise level during daytime
was found to have exceeded the night-time noise limit, night work
would be ceased.

Closing
of tunnel shaft opening to reduce noise
|
 |
Observations
& Achievements
Part
of the tunnel ran beneath the foundations of residential buildings.
Through collaboration between the project client, the contractor
and the noise control authority, a balance was struck between maintaining
a tight construction schedule of infrastructure project and meeting
with the community's desire for a tranquil environment.
|