Achievements in environmental pollution control on construction activities

MTRC Quarry Bay Congestion Relief Works

This project involved the construction of additional railway tunnel between Quarry Bay and Fortress Hill.


Environmental Concern

It consisted of the construction of a 6.3 m diameter, 2 km long twin-tube tunnel parallel to an existing underground railway tunnel under a densely populated area in North Point. Noise arising from round-the-clock tunnel-boring work was the major concern of the residents.

Map of MTRC Quarry Bay Congestion Relief Works Tunnel boring work under residential area
Tunnel boring work under residential area

Measures Adopted

Patrolling - Additional patrolling was conducted to ensure closing of tunnel shaft openings at night to reduce noise from underground work.

Administration - Specific complaint hotline and an Environmental Management System were set up by MTRC to ensure quick response to complaints.

Monitoring - Daytime noise level monitoring was conducting for the boring works through noise sensitive area. When the noise level during daytime was found to have exceeded the night-time noise limit, night work would be ceased.

Closing of tunnel shaft opening to reduce noise
Closing of tunnel shaft opening to reduce noise 

Observations & Achievements

Part of the tunnel ran beneath the foundations of residential buildings. Through collaboration between the project client, the contractor and the noise control authority, a balance was struck between maintaining a tight construction schedule of infrastructure project and meeting with the community's desire for a tranquil environment.

 