Code of Practice
on Asbestos Control: Asbestos Work Using Full Containment or Mini
Containment Method (Please visit your nearest EPD office)
Code of Practice
on Asbestos Control: Asbestos Work Using Glove Bag Method (Please
visit your nearest EPD office)
Code of Practice
on Asbestos Control: Preparation of Asbestos Investigation Report,
Asbestos Management Plan and Asbestos Abatement Plan (Please visit
your nearest EPD office)
Code of Practice
on Asbestos Control: Safe Handling of Low Risk Asbestos Containing
Material (Please visit your nearest EPD office)
Prior
approval from EPD for installing emergency generators with nominal
fuel consumption exceeding 25 L/h of liquid fuel or 1,150 megajoules/h
of gaseous fuel under Air Pollution Control (Furance, Oven and Chimneys)
(Installation and Aleration) Regulation
Discharge
Licence under Water Pollution Control Ordinance
Licence
for discharging effluent from sewage treatment facilities, e.g. sewage
treatment plant, septic tank/soakaway system, communal underground
grease trap at commercial shopping centre
Construction
Noise Permit for Renovation and Building Maintenance Work
A
Construction Noise Permit is required for carrying out renovation
and building maintenance works between 7pm and 7am or at any time
on a general holiday.
A Noise
Abatement Notice will be issued to the operator of industrial or commercial
premises that emit excessive noise, requiring him to abate the noise
within a specified period.
*To apply for licences and permits on-line via the
Electronic Forms Submission System, you must possess a valid recongised
digital certificate issued by a certificate authority recognised by the
Government Chief Information Officer and observe other
requirements as stipulated in the Electronic Transactions Ordinance.