Landfill Restoration and Afteruse - Summary Information
General Information
|
Landfill Site
|
Location
|
Area (ha)
|
Total Waste Received (Mt)
|
Landfill Closed
|
|
Jordan Valley
|
New Clear Water Bay Road, Jordan Valley
|
11
|
1.5
|
1990
|
|
Ma Yau Tong Central
|
Lin Tak Road,
Lam Tin
|
11
|
1.0
|
1986
|
|
Ma Yau Tong West
|
Tseung Kwan O Road,
Lam Tin
|
6
|
0.6
|
1981
|
|
Sai Tso Wan
|
Sin Fat Road,
Lam Tin
|
9
|
1.6
|
1981
|
|
Ngau Chi Wan
|
Fung Shing Street,
Ngau Chi Wan
|
8
|
0.7
|
1977
|
|
Siu Lang Shui
|
Tuen Mun
|
12
|
1.2
|
1983
|
|
Ma Tso Lung
|
Pak Shek Au
|
2
|
0.2
|
1979
|
|
Ngau Tam Mei
|
Yuen Long
|
2
|
0.15
|
1975
|
|
Gin Drinkers Bay
|
Kwai Chung
|
29
|
3.5
|
1979
|
|
Tseung Kwan O Stage I
|
TKO development area 77
|
68
|
15.2
|
1995
|
|
Tseung Kwan O Stage II/III
|
TKO development area 105
|
42
|
12.6
|
1994
|
|
Shuen Wan
|
Ting Kok Road, Tai Po
|
50
|
15
|
1995
|
|
Pillar Point Valley
|
Part within Tuen Mun Area 46 and part within Castle Peak Firing Range
|
38
|
13
|
1996
|
Final Capping System
In general, the landfills are capped with geotextile polyethylene liner, overlaid by synthetic geo-composite drainage layer and the soil to promote vegetation growth.
Leachate Management
A leachate management system including pumping wells is in place for a restored landfill. Collected leachate is being treated on site leachate treatment plant prior to disposal at adjacent public sewers.
Landfill Gas Management
For safety and health reasons, a landfill gas management system is in place for a restored landfill. Landfill gas is collected and treated on site. Some of the collected gas is utilized for electricity generation for onsite use or thermal energy for leachate treatment. Excess gas is flared as far as practicable for complete destruction.
Monitoring
Regular monitoring of landfill gas, leachate, organic emission, noise, surface water, marine water, dust and odour etc are carried out.
Landscaping
The surface of the landfills is landscaped with selected species of plant.
Afteruse
|
Landfill Site
|
Proposed Afteruse
|
|
Shuen Wan
|
A 145-bay golf driving range has been open for use by the public since April 1999. Upgrading of the existing driving range to a 9-hole golf course being planned
|
|
Sai Tso Wan
|
Sai Tso Wan Recreation Ground for soccer and baseball
|
|
Jordan Valley
|
To develop a park. Construction commenced in December 2007 for commissioning by December 2009
|
|
Ngau Chi Wan
|
To develop a recreation ground. Construction commenced in January 2008 for commissioning by March 2010
|
|
Tseung Kwan O Stage I
|
To develop a Football Academy |
| Gin Drinkers Bay |
To develop a BMX Park |
| Pillar Point Valley |
To develop a Shooting Range |
|
Landfill Site
|
Tentative Afteruse
|
|
Ma Yau Tong Central
|
Currently as green zone
|
|
Ma Yau Tong West
|
Currently as green zone
|
|
Ma Tso Lung
|
Youth camp site
|
|
Siu Lang Shui
|
Currently as green zone
|
|
Tseung Kwan O Stage II/III
|
Currently as green zone
|
| Ngau Tam Mei |
Currently as green zone |
Landfill Restoration
|
Landfill Site
|
Capital Cost
|
Capital Works Period
|
Maintenance
|
|
Jordan Valley
|
$249 million
|
1997 - 1998
|
Since 1998
|
|
Ma Yau Tong Central
|
|
Ma Yau Tong West
|
|
Sai Tso Wan
|
|
Ngau Chi Wan
|
|
Siu Lang Shui
|
$332 million
|
1999 - 2000
|
Since 2000
|
|
Ma Tso Lung
|
|
Ngau Tam Mei
|
|
Gin Drinkers Bay
|
|
Tseung Kwan O Stage I
|
$369 million
|
1997 - 1999
|
Since 1999
|
|
Tseung Kwan O Stage II/III
|
|
Shuen Wan
|
$162 million
|
1996 - 1997
|
Since 1997
|
|
Pillar Point Valley
|
$199 million
|
2004 - 2006
|
Since 2006
|
|