Environmental Permit No. EP-004/1998/I
Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/I
ENVIRONMENTAL IMPACT
ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTION 10 & 13
Àô ¹Ò ¼v ÅT µû ¦ô ±ø ¨Ò
(²Ä 499³¹ )
²Ä 10 ¤Î 13 ±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
«Ø ³y ¤Î Àç ¿ì «ü ©w ¤u µ{ ¶µ ¥Ø ªº Àô ¹Ò ³\ ¥i ÃÒ
PART A (MAIN PERMIT)
A³¡ (³\ ¥i ÃÒ ¥D n ³¡ ¤À)
Pursuant
to Section 10 of the Environmental Impact Assessment Ordinance (the Ordinance),
the Director of Environmental Protection (the Director) granted the
Environmental Permit (No. EP-004/1998) to KOWLOON-CANTON
RAILWAY CORPORATION (the "Permit Holder") on 16 September 1998.
Pursuant to Section 13 of the Ordinance, the Director amends the Environmental
Permit No. EP-004/1998/H based on the Application No. VEP-361/2012.
The amendments described below, are incorporated into this Environmental Permit
(EP-004/1998/I). This Environmental Permit as amended is for the construction
and operation of the designated projects described in Part B
of this Permit subject to the conditions described in and attached to Part C of this Permit. .
®Ú
¾Ú
Àô
¹Ò
¼v
ÅT
µû
¦ô
±ø
¨Ò
(±ø
¨Ò)
²Ä
10±ø
ªº
³W
©w
¡A
Àô
¹Ò
«O
Å@
¸p
¸p
ªø
(¸p
ªø)
©ó
1998¦~
9¤ë
16¤é
±N
Àô
¹Ò
³\
¥i
ÃÒ
(½s
¸¹
EP-004/1998) §å
¤©
¤E
¼s
ÅK
¸ô
¤½
¥q
(¤U
ºÙ
"³\
¥i
ÃÒ
«ù
¦³
¤H
")¡C
®Ú
¾Ú
±ø
¨Ò
²Ä
13±ø
ªº
³W
©w
¡A
¸p
ªø
¦]
À³
§ó
§ï
Àô
¹Ò
³\
¥i
ÃÒ
ªº
¥Ó
½Ð
½s
¸¹
VEP-361/2012 ×
q
Àô
¹Ò
³\
¥i
ÃÒ
½s
¸¹
EP-004/1998/H¡C
¥H
¤U
×
q
¤w
¥]
§t
¦b
¥»
Àô
¹Ò
³\
¥i
ÃÒ
¤º
(EP-004/1998/I)¡C
¥»
¸g
×
q
ªº
Àô
¹Ò
³\
¥i
ÃÒ
§@
¬°
«Ø
³y
¤Î
Àç
¿ì
¥»
³\
¥i ÃÒ B ³¡
©Ò »¡ ©ú ªº «ü ©w ¤u µ{ ¶µ ¥Ø ¡A ¦ý ¶· ¿í ¦u ¥» ³\ ¥i ÃÒ C ³¡
©Ò »¡ ©ú ¤Î ªþ ¸ü ªº ±ø ¥ó ¡C
This Environmental Permit is based on the documents, approval and
permissions described below:
¥» Àô ¹Ò ³\ ¥i ÃÒ ¤D ¨Ì ¾Ú ¤U ¦C ªº ¤å ¥ó ¡B §å 㠤Π³\ ¥i ±ø ¥ó ¦Ó ñ µo :
Application
No. |
VEP-361/2012 |
Document in the Register : |
(a)
West Rail - Final Assessment Report West Kowloon to Tuen Mun Centre -
Environmental Impact Assessment, its Technical Annexes, and Final Landscape Design
Strategy, Report Vol.1 (Register No. EIA-149/1998) [Hereafter referred to as
the EIA report] (b) Application
documents submitted by Permit Holder including all attachments on 19 August
1998 (Application No. AEP-004/1998) (c)
Environmental Permit issued on
16 September 1998 (Permit No. EP-004/1998) (d) Application
documents for Variation of an Environmental Permit including all attachments
by Permit Holder submitted on 21 July 2000. (Application No. VEP-020/2000) (e)
Environmental Permit issued on
18 August 2000 (Permit No. VEP-020/2000/A/EP-004) (f)
Application documents for
Variation of an Environmental Permit including all attachments by Permit
Holder submitted on 29 May 2001. (Application No. VEP-045/2001) (g)
Environmental Permit issued on
27 June 2001 (Permit No. EP-004/1998/B) (h) Application
documents for Variation of an Environmental Permit including all attachments
by Permit Holder submitted on 11 March 2002. (Application No. VEP-062/2002) (i)
Environmental Permit issued on
9 April 2002 (Permit No. EP-004/1998/C) (j)
Application documents for
Variation of an Environmental Permit including all attachments by Permit
Holder submitted on 10 June 2002. (Application No. VEP-067/2002) (k) Environmental
Permit issued on 8 July 2002 (Permit No. EP-004/1998/D) (l)
Application documents for Variation
of an Environmental Permit including all attachments by Permit Holder
submitted on 27 September 2002. (Application No. VEP-078/2002) (m) Environmental
Permit issued on 24 October 2002 (Permit No. EP-004/1998/E). (n) Application
documents for Variation of an Environmental Permit including all attachments
by Permit Holder submitted on 24 January 2003 (Application No. VEP-084/2003). (o) Environmental
Permit issued on 20 February 2003 (Permit No. EP-004/1998/F). (p) Application
documents for Variation of an Environmental Permit including all attachments
by Permit Holder submitted on 22 November 2003 (Application No.
VEP-122/2003). (q) Environmental
Permit issued on 4 December 2003 (Permit No. EP-004/1998/G). (r)
Application documents for
Variation of an Environmental Permit including all attachments by Permit
Holder submitted on 28 May 2004 (Application No. VEP-142/2004). (s)
Environmental Permit issued on
24 June 2004 (Permit No. EP-004/1998/H). (t)
Application documents for
Variation of an Environmental Permit including all attachments by Permit
Holder submitted on 15 May 2012 (Application No. VEP-361/2012). (a)
¦è ³¡ ÅK ¸ô
-³Ì ²× µû ¦ô ³ø §i ¦è ¤E Às ¦Ü ¤Ù ªù ¤¤
- Àô ¹Ò ¼v ÅT µû ¦ô ¡B ¨ä §Þ ³N ªþ ¥ó ¤Î ³Ì ²× ´º Æ[ ¬ü ¤Æ ³] p µ¦ ²¤ ³ø §i ²Ä ¤@ ¥U (µn
°O ¥U ÀÉ ¸¹ :EIA-149/1998) [¤U ºÙ "Àô
µû ³ø §i
"] (b) ³\ ¥i ÃÒ «ù ¦³ ¤H ©ó
1998 ¦~
8 ¤ë
19 ¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ AEP-004/1998) (c)
©ó 1998 ¦~ 9 ¤ë
16¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998) (d) ³\ ¥i ÃÒ «ù ¦³ ¤H ©ó
2000¦~
7¤ë
21¤é ´£ ¥æ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó
(¥Ó ½Ð ®Ñ ½s ¸¹
VEP-020/2000) (e)
©ó 2000¦~ 8¤ë
18¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
VEP-020/2000/A/EP-004 ) (f)
³\ ¥i ÃÒ «ù ¦³ ¤H ©ó 2001¦~ 5¤ë
29¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-045/2001) (g)
©ó 2001¦~ 6¤ë
27¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/B ) (h) ³\ ¥i ÃÒ «ù ¦³ ¤H ©ó
2002¦~
3¤ë
11¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-062/2002) (i)
©ó 2002¦~ 4¤ë
9¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/C ) (j)
³\ ¥i ÃÒ «ù ¦³ ¤H ©ó 2002¦~ 6¤ë
10¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-067/2002) (k) ©ó
2002¦~
7¤ë
8¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/D ) (l)
³\ ¥i ÃÒ «ù ¦³ ¤H ©ó 2002¦~ 9¤ë
27¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-078/2002) (m) ©ó 2002¦~ 10¤ë
24¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/E ) (n) ³\ ¥i ÃÒ «ù ¦³ ¤H ©ó
2003¦~
1¤ë
24¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-084/2003) (o) ©ó
2003¦~
2¤ë
20¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/F ) (p) ³\ ¥i ÃÒ «ù ¦³ ¤H ©ó
2003¦~
11¤ë
22¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-122/2003) (q) ©ó
2003¦~
12¤ë
4¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/G ) (r)
³\ ¥i ÃÒ «ù ¦³ ¤H ©ó 2004¦~ 5¤ë
28¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó
½Ð ®Ñ ½s ¸¹ VEP-142/2004) (s)
©ó 2004¦~ 6¤ë
24¤é µo ¥X ªº Àô ¹Ò ³\ ¥i ÃÒ
(³\ ¥i ÃÒ ½s ¸¹
EP-004/1998/H ) (t)
³\ ¥i ÃÒ «ù ¦³ ¤H ©ó 2012¦~ 5¤ë 15¤é ´£ ¥æ ¤§ ¥Ó ½Ð ¤å ¥ó ¥] ¬A ©Ò ¦³ ªþ ¥ó (¥Ó ½Ð ®Ñ ½s ¸¹ VEP-361/2012) |
Application No. ¥Ó ½Ð ½s ¸¹ |
Date of Application ¥Ó ½Ð ¤é ´Á |
List of Amendments Incorporated into Environmental Permit ¤w ¥] §t ¦b Àô ¹Ò ³\ ¥i ÃÒ ¤º ªº × q ¶µ ¥Ø |
Date of Amendments × q ¤é ´Á |
VEP- 020/2000 |
21 July 2000 |
Add conditions
2.20, 3.14, Notes Add reference information to conditions 5.2, 5.6 and Delete Figure 1 and Figure 2 in condition 3.8, and
subsequent variation of condition Add the register reference no. of the EIA Report to conditions
1.7, 2.4, 2.5, 2.6, 2.7, 2.9, 2.12, 2.13, 2.14, 2.16, 2.17, 2.18, 2.19, 3.1,
3.3, 3.4, 3.5, 3.6, 5.5, 5.7, 5.8, 5.10 and 6.3 of Part C
of Environmental Permit No. EP-004/1998 |
18 August 2000 |
|
2000¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998ªº C ³¡
¤º ¥[ ¤J ²Ä 2.20, 3.14, ,µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998ªº C³¡ ¤º ²Ä 5.2, 5.6¤Î
5.10¥[ ¤J °Ñ ¦Ò ¸ê ®Æ ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998ªº C ³¡ ¤º §R °£ ²Ä 3.8¶µ ±ø ¥ó ¤§ ¹Ï
1¤Î ¹Ï 2 ¡A ¤Î ¸ò ÀH × §ï ²Ä 3.14 ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998 C ³¡ ¤º ªº ²Ä 1.7, 2.4, 2.5, 2.6, 2.7, 2.9, 2.12, 2.13, 2.14, 2.16, 2.17,
2.18, 2.19, 3.1, 3.3, 3.4, 3.5, 3.6, 5.5, 5.7, 5.8, 5.10 ¤Î 6.3¶µ ±ø ¥ó ¥[ ¤W µn °O ¥U ÀÉ ®× ½s ¸¹ |
2000¦~ |
VEP- 045/2001 |
29 May 2001 |
Vary
conditions 2.20 and Add Notes Add reference information to conditions 5.2, 5.6 and Vary condition 5.3 with respect to the change from 12-car train
to 9-car train in Part C of Environmental Permit No.
VEP-020/2000/A/EP-004 Vary condition
6.1 with respect to the change in maximum speed at the section between Tin
Shui Wai and Siu Hong in Part C of Environmental Permit
No. VEP-020/2000/A/EP-004 |
27 June 2001 |
|
2001¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ VEP-020/2000/A/EP-004ªº C ³¡ ¤º §ó §ï ²Ä 2.20 ¤Î 3.14 ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ VEP-020/2000/A/004ªº C ³¡ ¥[ ¤W µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ VEP-020/ ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ VEP-020/2000/A/EP-004ªº C³¡ ¤º , ´N 12¥d ºÐ §Î ¨î °Ê ¹q ®ð ¤Æ ¦C ¨® ¦Ü 9¥d ºÐ §Î ¨î °Ê ¹q ®ð ¤Æ ¦C ¨® ¤§ §ï °Ê , × §ï ²Ä 5.3¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ VEP-020/2000/A/EP-004ªº C³¡ ¤º , ´N ¤Ñ ¤ô ³ò ¦Ü ¥ü ±d ¤@ ¬q ¤§ ³Ì °ª ®É ³t ¤§ §ï °Ê , × §ï ²Ä 6.1¶µ ±ø ¥ó |
2001¦~ |
VEP- 062/2002 |
11 March 2002 |
Vary
conditions 2.20 and Add Note Add reference
information to conditions 5.2 and Add Figure 1, Figure 2 and Figure 3 to the Environmental Permit
No. EP-004/1998/B and subsequent variation of the figure number in Figure 1 and condition 3.12 of the
Environmental Permit No. EP-004/1998/B. |
9 April 2002 |
|
2002¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Bªº C ³¡
¤º §ó §ï ²Ä 2.20 ¤Î 3.14 ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Bªº C ³¡
¥[ ¤W µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/B ªº C³¡ ¤º ²Ä 5.2¤Î 5.10¶µ ±ø ¥ó ¥[ ¤J °Ñ ¦Ò ¸ê ®Æ ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/B¥[ ¤W ¹Ï 1, ¹Ï 2¤Î ¹Ï
3¡A¤Î ¸ò ÀH × §ï Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/B¹Ï 1¤Î ²Ä 3.12¶µ ±ø ¥ó ªº ªþ ¹Ï ½s ¸¹ |
2002¦~ |
VEP-
067/2002 |
10 June 2002 |
Vary
conditions 2.20 and Add Note Add reference
information to conditions 5.2, 5.7 and |
8 July 2002 |
|
2002¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Cªº C ³¡
¤º §ó §ï ²Ä 2.20 ¤Î 3.14 ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Cªº C ³¡
¥[ ¤W µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Cªº C³¡ ¤º ²Ä 5.2 ¡A 5.7 ¤Î 5.10¶µ ±ø ¥ó ¥[ ¤J °Ñ ¦Ò ¸ê ®Æ |
2002¦~ |
VEP-
078/2002 |
27 September 2002 |
Vary
conditions 2.20 and Add Note Add reference
information to conditions 5.2, 5.7 and |
24 October 2002 |
|
2002¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Dªº C ³¡
¤º §ó §ï ²Ä 2.20 ¤Î 3.14 ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Dªº C ³¡
¥[ ¤W µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Dªº C ³¡
¤º ²Ä 5.2 ¡A 5.7 ¤Î 5.10¶µ ±ø ¥ó ¥[ ¤J °Ñ ¦Ò ¸ê ®Æ |
2002¦~ |
VEP-
084/2003 |
24 January 2003 |
Vary clause (i)
of Annex A of the Environmental Permit No. EP-004/1998/E. Vary clause
(c) of Annex E of the Environmental Permit No. EP-004/1998/E. Delete clauses
(a), (b), (g) and (h) of Annex E of the Environmental Permit No.
EP-004/1998/E. Vary conditions
2.20 and Vary Note Vary reference
information to conditions 5.2 and |
20 February 2003 |
|
2003¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/E ªº ªþ ¥ó A §ó §ï ²Ä (i) ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/E ªº ªþ ¥ó E §ó §ï ²Ä (c) ¶µ ±ø ¥ó ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/E ªº ªþ ¥ó E §R °£ ²Ä (a), (b), (g) ¤Î (h) ¶µ ±ø ¥ó. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Eªº C ³¡
¤º §ó §ï ²Ä 2.20 ¤Î 3.14 ¶µ ±ø ¥ó. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Eªº C ³¡
§ó §ï µù ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Eªº C ³¡
¤º ²Ä 5.2¤Î 5.10¶µ ±ø ¥ó §ó §ï °Ñ ¦Ò ¸ê ®Æ |
2003¦~ |
VEP-
122/2003 |
22 November 2003 |
Vary condition
2.5(d) in Part C of Environmental Permit No.
EP-004/1998/F. Add conditions
5.13, 6.9 and Add Schedule 1
and Figures 5 to 14 in Part C of
Environmental Permit No. EP-004/1998/G. Vary reference
information to conditions 2.5, 5.2 and |
4 December 2003 |
|
2003¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Fªº C ³¡
¤º §ó §ï ²Ä 2.5(d) ¶µ ±ø ¥ó. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Gªº C ³¡
¤º ¥[ ¤J ²Ä 5.13, 6.9 ¤Î 6.10 ¶µ ±ø ¥ó. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Gªº C ³¡
¤º ¥[ ¤J ªþ ªí 1 ¤Î ø ¹Ï
5 ¦Ü 14. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Fªº C ³¡
¤º ²Ä 2.5, 5.2 ¤Î5.7¶µ ±ø ¥ó §ó §ï °Ñ ¦Ò ¸ê ®Æ. |
2003¦~ |
VEP-
142/2004 |
28
May 2004 |
Vary condtion 6.9,
condition 6.10, Table B of Schedule 1 and Figure 10 in Part C
of Environmental Permit No. EP-004/1998/G. , Add point (b) in Annex E,
Table C in Schedule 1 and Figure 15
in Part C of Environmental Permit No. EP-004/1998/H. Vary reference information
to conditions 2.5 and |
24
June 2004 |
|
2004¦~ |
¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Gªº C ³¡
¤º §ó §ï ²Ä 6.9 ¶µ ±ø ¥ó, ²Ä 6.10 ¶µ ±ø ¥ó, ªþ ªí 1 ªíB ¤Î ø ¹Ï 10. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Hªº C ³¡
¤º ¥[ ¤J ªþ ¥óE (b) ¶µ, ªþ ªí 1 ªíC ¤Î ø ¹Ï 15. ¦b Àô ¹Ò ³\ ¥i ÃÒ ½s ¸¹ EP-004/1998/Gªº C ³¡
¤º ²Ä 2.5 ¤Î5.7¶µ ±ø ¥ó §ó §ï °Ñ ¦Ò ¸ê ®Æ. |
2004¦~ |
VEP-
361/
2012 |
15
May 2012 |
Add Figure
16 and
information on Modification Works for West Rail Depot to condition |
6 June 2012 |
|
2012¦~ |
¦bÀô¹Ò³\¥iÃÒ½s¸¹ EP-004/1998/Hªº C ³¡ ¤º²Ä 2.6¶µ±ø¥ó¥[¤J ¹Ï16 ¤Î¦èÅK¨®¼t§ïµ½¤uµ{¸ê®Æ. |
2012¦~ |
6 June 2012 |
|
|
Date ¤é´Á |
|
(WONG Hon-meng) Principal Environmental Protection Officer
(Strategic Assessment) for Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô(µ¦²¤µû¦ô) ¶Àº~©ú ¥N ¦æ) |
PART B (DESCRIPTIONS OF DESIGNATED
PROJECT)
B³¡ («ü ©w ¤u µ{ ¶µ ¥Ø ªº »¡ ©ú )
Hereunder is the description of the designated project mentioned
in Part A of this environmental permit :
¤U ¦C ¬° ¥» Àô ¹Ò ³\ ¥i ÃÒ A ³¡ ©Ò ´£ z ªº «ü ©w ¤u µ{ ¶µ ¥Ø ªº »¡ ©ú :
Title of Designated Project |
West Rail, Phase I |
Nature of Designated Project |
A railway and its associated stations |
Location of Designated Project |
Kowloon to Tuen Mun |
Scale and Scope of Designated
Project(s) |
The Project is an electrified double-tracked railway system
including the railway alignment, all railway premises, depots, tracks,
cuttings, embankments, tunnels, stations, goods and rail yards, car parks and
other areas for ancillary uses but excludes non-railway developments above
stations or above other railway property. The Project includes the following
four sections: |
1. General Conditions
1.1 The Permit Holder shall ensure full compliance with all conditions
of this Environmental Permit (the Permit). Any non-compliance with this Permit
may constitute a contravention of the Environmental Impact Assessment Ordinance
(Cap. 499) and shall be definite ground for enforcement action or permit
cancellation where applicable.
1.2 This Permit shall not remove the responsibility of the Permit Holder
to comply with any legislation currently in force such as Noise Control
Ordinance (Cap.400), Air Pollution Control Ordinance (Cap.311), Water Pollution
Control Ordinance (Cap.358), Dumping at Sea Ordinance (Cap.466), the Waste
Disposal Ordinance (Cap.354) and others.
1.3 The Permit Holder shall make copies of this Permit available at all
times for inspection by the Director at all sites covered by this Permit.
1.4 The Permit Holder shall give a copy of this Permit to the person(s)
in charge of the site(s).
1.5 The Permit Holder shall display a copy of this Permit on the
construction site(s) at all vehicular site entrances/exits for public
information at all times. The Permit Holder shall ensure that the most updated
information about the environmental permit, including any amended permit, is
displayed at such locations. If the Permit Holder surrenders a part or the
whole of the Permit, the notice he sends to the Director of Environmental
Protection shall also be displayed at the same locations as the original
Permit.
1.6 The Permit Holder shall construct and operate the Project in
accordance with the project descriptions in Part B of this
Permit.
1.7 Unless varied under the Environmental Impact Assessment Ordinance,
the Permit Holder shall ensure that the Project is designed, constructed and
operated in accordance with the information and recommendations contained in
the EIA report [ref: register no EIA 149/1998].
2.
Submissions or Measures before Commencement of Construction of Certain
Sections of the Project
2.1 The Permit Holder shall employ an Environmental Manager with at
least 7 years of experience in environmental monitoring and auditing or
environmental management. The Environmental Manager shall be responsible for
supervising the environmental monitoring and audit programme and executing the
duties as recommended in the Environmental Monitoring and Audit Manual to be
prepared in accordance with section 2.18 of this Permit.
2.2 The Permit Holder shall employ an Independent Environmental Checker
with at least 7 years of experience in environmental monitoring and auditing or
environmental management. The Independent Environmental Checker shall verify
the overall environmental performance of the Project, including the
implementation of all the environmental mitigation measures, submissions
relating to environmental monitoring and auditing, and any other submissions
required under this Permit.
2.3 Environmental Team(s) shall be established prior to the commencement
of construction of relevant sections of the Project, described in Part B of this Permit. The Environmental Team(s) shall be
headed by a team leader who has at least 7 years experience in environmental
monitoring auditing or environmental management.
2.4 Before the commencement of construction of relevant sections of the
Project described in Part B of this Permit, the Permit
Holder shall deposit with the Director 3 sets of 1 to 1000 scale layout drawings
with an explanatory statement showing the works boundary, railway and tunnel
alignment, environmental mitigation measures recommended in the EIA report
[ref: register no EIA 149/1998] and any other facilities assessed in the EIA
report. The drawings shall be certified by the Environmental Manager and
verified by the Independent Environmental Checker as conforming to the findings
and recommendations of the EIA report [ref: register no EIA 149/1998]. The
Project shall be constructed in accordance with the information and
recommendations contained in the EIA report [ref: register no EIA 149/1998] and
the drawings deposited with the Director. All measures set out in the drawings
shall be fully implemented. (See Note 6)
2.5 Before the commencement of construction of track sections not in
tunnel, the Permit Holder shall deposit with the Director 3 sets of drawings
with an explanatory statement showing all the noise mitigation measures. The
drawings shall be certified by the Environmental Manager and verified by the
Independent Environmental Checker as conforming to the findings and
recommendations of the EIA report [ref: register no EIA 149/1998]. The Project
shall be constructed in accordance with the information and recommendations
contained in the EIA report [ref: register no EIA 149/1998] and the drawings
deposited with the Director or the information contained in the Application for
Variation No. VEP-122/2003 and the Application for Variation No. VEP-142/2004.
All measures set out in the drawings or the information contained in the
Application for Variation No. VEP-122/2003 and the Application for Variation
No. VEP-142/2004 shall be fully implemented. In particular, the following
requirements shall be included :
(a) the
use of resilient rail baseplates for track on viaduct, to reduce vibration
transmission to the viaduct structure and thereby reduce re-radiated noise from
the structures;
(b) for
the track on viaduct, mounting the track on a floating slab system to further
reduce vibration transmission to the viaduct structure;
(c) the
use of extended wheel skirts and adsorptive lining beneath the car, to create
an acoustic plenum in the under-car area;
(d) Except
for the locations as set out in Schedule 1 of this Permit, the creation of a
second acoustic plenum on either side of the car, using either a walkway at the
side of the track or a purpose-built construction. This would also incorporate
absorptive lining in the area beneath the plenum;
(e) edge
walls with sound adsorption; and
(f) barriers
and enclosures.
2.6 Before the commencement of construction of West Rail Depot, the
Permit Holder shall deposit with the Director three sets of drawings with an
explanatory statement showing the mitigation measures for fixed plant noise.
The drawings shall be certified by the Environmental Manager and verified by
the Independent Environmental Checker as conforming to the findings and
recommendations of the EIA report [ref: register no EIA 149/1998]. The Project shall be constructed in accordance with the
information and recommendations contained in the EIA report [ref: register no
EIA 149/1998], the drawings deposited with the Director (See Note 6). All measures set out in the drawings
shall be fully implemented. In particular, the following noise sources shall be
addressed :
(a) train
rolling noise at West Rail Depot;
(b) ventilation
fans, vents and buildings;
(c) chiller
plant;
(d) cooling
water pumping station; and
(e) traction
sub-stations.
The
modification works for the West Rail Depot as per the proposal in the
Application for Variation No. VEP-361/2012 shall be constructed and operated as
shown in Figure 16 and the
information contained in the Application for Variation No. VEP-361/2012. To allow sufficient time for the
establishment of baseline conditions, at least three months before the
commencement of construction of the modificiation works for the West Rail
Depot, the Permit Holder shall submit an Environmental Monitoring and Auditing
Programme for approval by the Director.
The Permit Holder shall employ an Environmental Manager and an
Independent Environmental Checker as defined in section 2.1 and section 2.2 of
this Pemit respectively for the implementation of the Environmental Monitoring
and Auditing Programme.
2.7 The Permit Holder shall submit to the Director for approval three
sets of landscape master plan(s) 1 to 1000 scale together with a master
implementation schedule before the commencement of construction of relevant
sections of the Project described in Part B of this
Permit. The drawings shall be expanded based on the Landscape Strategy Report
of the EIA report [ref: register no EIA 149/1998] and shall show the conceptual
landscape proposals within the works boundary to be in accordance with the
recommendations of the EIA report [ref: register no EIA 149/1998] during the
construction and operation of the Project. It shall also include a management
and maintenance schedule indicating clearly how the landscape areas will be
managed and maintained. The landscape drawings shall be certified by the
Environmental Manager, and verified by the Independent Environmental Checker.
All measures recommended in the approved drawings shall be fully implemented in
accordance with the details and time schedule set out in the approved landscape
master plan(s). (See Note 6).
2.8 Three sets of detailed landscape drawings shall be submitted to the
Director for approval before the commencement of landscape and visual
mitigation works of the relevant section(s) of the Project or part(s) thereof.
Such drawings shall expand on the approved landscape master plan(s) and shall
show the detailed landscape proposals during the construction and operation of
the Project. The landscape drawings shall be certified by the Environmental
Manager, and verified by the Independent Environmental Checker. All measures
recommended in the approved drawings shall be fully implemented in accordance
with the details and time schedule set out in the approved landscape drawings.
2.9 The Permit Holder shall submit a field evaluation programme and an
archaeological action plan for each of the Central, Northern and Western
Sections in accordance with the requirements of the EIA Report [ref: register
no EIA 149/1998] before commencement of construction of the relevant sections,
and obtain the approval of the Director on the programmes and action plans. The
field evaluation programme and the archaeological action plans shall be
certified by the Environmental Manager, and verified by the Independent
Environmental Checker. All measures recommended in the approved programme and
action plans shall be fully implemented in accordance with the details and time
schedules set out in the approved programme and action plans. In particular,
the proposals for mitigation measures to the archaeological resources revealed
during the field evaluation shall be included. (See Note 6).
2.10
The design of the West Rail Depot shall avoid direct impacts to the Kwan Tai
Shing Kung temple and associated grove situated to the north-east of Cheung Po
and provide for buffer zone around the temple during construction;
2.11
The external design of the Tin Shui Wai Station shall avoid adverse impacts to
the Tsui Shing Lau Pagoda and be compatible with the local cultural
environment.
2.12
For the Western Section, a condition survey on the Tsui Shing Lau Pagoda shall
be carried out as recommended in the EIA report [ref: register no EIA 149/1998]
and deposited to the Director. The condition survey shall be undertaken prior
to and following the completion of works and sample vibration monitoring shall
be undertaken during construction. A vibration limit of
2.13
Before the commencement of construction of the Northern Section and the
2.14
Before the commencement of the construction of Central Section and Western
Section, the Permit Holder shall submit and obtain approval of the Director for
the Contamination Assessment Plans (CAP) of the potentially contaminated sites
in accordance with the information and recommendations contained in the EIA
report [ref: register no EIA 149/1998] and Annex 19, Section 3 of the TM. Before
submission to the Director, the Contamination Assessment Plans shall be
certified by the Environmental Manager and verified by the Independent
Environmental Checker. (See Note 6)
2.15
Before the commencement of the construction of Central Section and Western
Section, the Permit Holder shall submit and obtain the approval of the Director
Contamination Assessment Reports (CAR) based on the endorsed Contamination
Assessment Plans in accordance with Annex 19, Section 3 of the TM. During the
preparation of the Contamination Assessment Report, if land contamination is
confirmed, Remediation Action Plans (RAP) are required in accordance with Annex
19, Section 3 of the TM and shall be submitted as a combined report with the
CAR to the Director for approval. Before submission to the Director, the
results of the Contamination Assessment Reports and any Remediation Action
Plans shall be certified by the Environmental Manager and verified by the
Independent Environmental Checker. All measures recommended in the approved
Remediation Action Plans shall be fully implemented in accordance with the
requirements and time schedule set out in the approved Remediation Action
Plans.
2.16
Before the commencement of the construction, the Permit Holder shall deposit
with the Director waste management plan(s) as recommended in the EIA report
[ref: register no EIA 149/1998]. Before submission to the Director, the waste
management plan shall be certified by the Environmental Manager and verified by
the Independent Environmental Checker. Measures covered by the Waste Disposal
Ordinance shall not be included in the waste management plan(s). All measures
recommended in the approved waste management plan(s) shall be fully implemented
in accordance with the requirements and time schedule(s) set out in the waste
management plan(s). (See Note 6).
2.17
Before the commencement of the construction of the Central Section, the Permit
Holder shall deposit with the Director a detailed construction risk assessment
of the work site located south west of Kwai Hei Streeet, Kwai Fong as
recommended in the EIA report[ref: register no EIA 149/1998]. The report shall,
with reference to Annex A, address the risks of landfill gas accumulation in
temporary structures, storage facilities and the processes and activities to be
undertaken at the site and shall be certified by the Environmental Manager, and
verified by the Independent Environmental Checker. All measures recommended in
the report shall be fully implemented in accordance with the requirements and time
schedule set out in the report deposited with the Director. (See Note 6).
2.20 The Permit Holder pursuant to
(I)
The Application for
Variation No. VEP-084/2003 with respect to
(a) revision
of measures to mitigate the landfill gas risk;
(II)
The Application for
Variation No. VEP-078/2002 with respect to
(b) revision
of location of noise barriers at West Rail Depot;
(III)
The Application for
Variation No. VEP-067/2002 with respect to
(c) revision of the
(IV)
The Application for
Variation No. VEP-062/2002 with respect to
(d)
increase in the
elevation of viaduct by approximately
(V)
The Application for
Variation No. VEP-045/2001 with respect to
(e) reduction
of train length from 12 cars to 9 cars with increase in train frequency from 30
to 40 trains per hour during 0600 to 0700;
(f) reduction
of train speed between Tin Shui Wai and Siu Hong from
(g) revised
locations of noise enclosure and additional height noise barriers at the north
of Kam Sheung Road Station, near Pok Oi Hospital, the west of Long Ping
Station, the west of Tin Shui Wai Station, Tin Sam Tsuen to Lam Tei and Tuen
Mun;
(VI)
The Application for
Variation No. VEP-020/2000
(h) the
construction method for the Tsing Tsuen Tunnel;
(i) the
revised alignment in Tsuen Wan;
(j) the
increased quantities of marine mud at
shall within 45 days,
provide supplementary information for the Director's approval of any changes
necessary to the submissions previously made to the Director in fulfilment of
conditions 2.4, 2.5, 2.6, 2.7, 2.8, 2.9, 2.14, 2.16, 2.17, 2.18 and 2.19 above.
All supplementary information shall be certified by the Environmental Manager
and verified by the Independent Environmental Checker before submission to the
Director. All mitigation measures arising from submitted supplementary
information shall be fully implemented in accordance with the details and time
schedule set out in the approved supplementary information.
2.21
All finalised submissions, as required under this part of the permit, shall be
released to the public if requested by the Director, by depositing copies in
the Environmental Impact Assessment Ordinance Register Office or any other
places or by any other means as specified by the Director for public
inspection. For this purpose, the Permit Holder shall provide sufficient copies
of submissions.
3. Submissions or Measures during the Construction Period
3.1 Within two months of commencement of construction of each of the
Southern, Central, Northern and Western sections of the Project, the Permit
Holder shall deposit with the Director environmental management plan(s) as
recommended in the EIA Report [ref: register no EIA 149/1998]. Before their submission
to the Director, the environmental management plan(s) shall be certified by the
Environmental Manager and verified by the Independent Environmental Checker.
3.2 Within 6 months of the commencement of construction of the Northern
Section and the
3.3 All design or construction measures described in the submissions
approved or deposited under section 2, and conditions 3.1 and 3.2 above shall
be fully implemented. Any changes to the measures shall be justified by
Environmental Manager and verified by the Independent Checker as conforming to
the requirements of the EIA Report [ref: register no EIA 149/1998]. (See Note
6).
3.7 For the construction of the Central Section at Tsuen Wan Bay
Reclamation, the combined rate of filling and dredging shall not be exceeding
15,000cu.m. per day for filling and 1,000cu.m. per day for the duration of the
16-hour working days for dredging. The status of compliance with these rates
shall be reported in the monthly EM&A reports in condition 4.5 of this
Permit.
3.8 For the Tsuen Wan Central Salt Water Pumping Station at Tsuen Wan
Bay Reclamation, silt curtain mitigation around dredging shall be adapted to
maintain the flushing water intakes at acceptable levels.
3.9 Storm water culverts, including Tai Ho and Ma Tau Pa Culverts, shall
be relocated along the existing coastline before dredging and reclamation
filling being undertaken in order to avoid water quality impacts.
3.10 To mitigate the cultural heritage and archaeological impacts
during construction:
(a) The
Director shall be informed immediately if any antiquities are discovered during
the course of the construction works to further assess the cultural value of
the items;
(b) Direct
impact to any historical buildings or structures identified shall be avoided.
Devices shall be attached to the walls of those historical buildings next to
the working site so as to monitor the impact of vibration on the structural
stability of the historic buildings; and
(c) a
buffer zone of at least
3.11
During the construction of the Northern Section, native species shall be
included in the plant list for revegetation of finished cut slope and lineside
planting.
3.12
The following measures shall be undertaken to protect the marsh habitat
adjacent to Kam Tin Road as shown in Figure
4:
(a) Bunding,
sheet piling shall be installed at the works boundary within and adjacent to
the marsh to prevent dewatering of the marsh outside the work areas. Such
devices shall be removed on the completion of construction works;
(b) Solid
fencing shall be installed at the boundary of works area within and adjacent to
the marsh. The works boundary shall be regularly inspected and any necessary
maintenance of the fencing shall be undertaken within 24 hours; and
(c) Works
areas at the marsh that are not permanently occupied by the Project shall be
reinstated back to original conditions immediately after the completion of the
construction.
3.13
Fish ponds that are temporarily disturbed during construction shall be
reinstated back to fish ponds after completion of construction.
3.14 The Permit Holder pursuant to
(I)
The Application for
Variation No. VEP-084/2003 with respect to
(a) revision
of measures to mitigate the landfill gas risk;
(II)
The Application for
Variation No. VEP-078/2002 with respect to
(b) revision
of location of noise barriers at West Rail Depot;
(III)
The Application for
Variation No. VEP-067/2002 with respect to
(c) revision of the
(IV)
The Application for
Variation No. VEP-062/2002 with respect to
(e)
increase in the
elevation of viaduct by approximately
(V)
The Application for Variation
No. VEP-045/2001 with respect to
(e) reduction
of train length from 12 cars to 9 cars with increase in train frequency from 30
to 40 trains per hour during 0600 to 0700;
(f) reduction
of train speed between Tin Shui Wai and Siu Hong from
(g) revised
locations of noise enclosure and additional height noise barriers at the north
of Kam Sheung Road Station, near Pok Oi Hospital, the west of Long Ping
Station, the west of Tin Shui Wai Station, Tin Sam Tsuen to Lam Tei and Tuen Mun;
(VI)
The Application for
Variation No. VEP-020/2000
(h) the
construction method for the Tsing Tsuen Tunnel;
(i) the
revised alignment in Tsuen Wan;
(j) the
increased quantities of marine mud at
shall within 45 days,
provide supplementary information for the Director's approval of any changes
necessary to the submissions previously made to the Director in fulfilment of
condition 3.1. All supplementary information shall be certified by the
Environmental Manager and verified by the Independent Environmental Checker
before submission to the Director. All measures in the approved supplementary
information shall be fully implemented in accordance with the details and time
schedule set out in the approved supplementary information. (See note 6).
3.15
All finalised submissions, as required under this part of the permit, shall be
released to the public if requested by the Director, by depositing copies in
the Environmental Impact Assessment Ordinance Register Office or any other
places or by any other means as specified by the Director for public
inspection. For this purpose, the Permit Holder shall provide sufficient copies
of submissions.
4. Environmental Monitoring and Audit During Construction
4.1 Any changes to the EM&A arrangements as required under the
EM&A Manual or under the Implementation Schedule shall be justified by the
Environmental Manager, and verified by the Independent Environmental Checker in
the monthly EM&A Reports and submitted to the Director under condition 4.5.
4.2 EM&A requirements shall be implemented as set out in the
EM&A Manuals and monthly EM&A Reports unless the changes are justified
in the monthly EM&A Reports submission, verified by the Independent
Environmental Checker and approved by the Director.
4.3 Samples and measurements shall be taken in accordance with the
requirements of noise, air quality, water quality monitoring, ecological in the
EM&A Manual by:
(a) conducting
baseline air, noise and water quality monitoring at the
specified locations and frequencies;
(b) conducting
impact monitoring on air quality, water quality, noise quality, and ecological
resources at the specified locations and frequencies;
(c) in
cases where specified criteria in the EM&A Manual are exceeded, carrying
out remedial actions in accordance with Event Contingency Plans, to be set out
in the EM&A Manual; and
(d) logging
and keeping records of the details of (a) to (c) above, within 3 working days
of the collection of data or completion of remedial action, for the purposes of
preparing and submitting EM&A Reports, and to make available for
information for inspection on site,
4.4 Ten copies of the Baseline Monitoring Report certified by the
Environmental Manager, and verified by the Independent Environmental Checker
shall be submitted to the Director one month before the commencement of any
major construction works that would affect the monitoring results.
4.5 Ten copies of monthly EM&A Reports certified by the
Environmental Manager, and verified by the Independent Environmental Checker
shall be submitted to the Director within 10 working days from the end of the
reporting month.