Guidelines for Development Projects in Hong Kong
TABLE OF CONTENT
-
1.1 Environmental Protection Action for Development Project
1.2 Criteria for an Environmental Monitoring and Audit Programme
1.3 Purpose of the EM&A Guidelines
2. Guiding Principles of Environmental Monitoring and Audit
2.1 Policy and Project Management Organization & Responsibilities
2.2 Environmental Management Procedures
2.3 Quality Assurance in Environmental Monitoring & Audit
2.4 Environmental Training and Awareness
2.5 Complaint and Public Relation Procedures
2.6 Technical Requirements
2.7 Reporting
Appendix B1: Examples of Environmental Policy and Objectives
Appendix B2: Environmental Protection Legislation
Appendix B3: Reporting-
3.1 Policy
3.2 Objective
3.3 Project Details
3.4 EIA Recommendation/ACE Requirements
3.5 Environmental Monitoring
3.6 Environmental Auditing
3.7 Design Changes
3.8 Documentation Requirement
4 Construction Phase EM&A Manual
- 4.1 Policy
- 4.2 Purpose of the Construction Phase EM&A Manual
- 4.3 Project Details
- 4.4 EIA Recommendations and EM&A Requirements
- 4.5 Environmental Team
- 4.6 Independent Checker (Environment)
- 4.7 Technical Requirements for Monitoring: Location, Sampling, Frequency and Laboratory Analysis
- 4.8 Site Surveillance
- 4.9 Environmental Compliance
- 4.10 Choice of Construction Method
- 4.11 Variation of Works
- 4.12 Complaint Procedure
- 4.13 Documentation
Appendix D1: Proforma for Construction Phase EM&A Programme
Appendix D2: General Technical Requirements of Environmental Monitoring5 Operational Phase EM&A Procedures
5.1 Identify the Need
5.2 Operational Phase of a Development Project
5.3 Environmental Management System and ISO 14000
5.4 Operational Phase EM&A Requirements
5.5 Resources Arrangement and Transfer of Responsibility
5.6 Documentation