The Project
Outcomes
3D model
Links
 
 
 
     Repositioning and Long Term Operation Plan of Ocean Park     海洋公園之重新定位及長遠營運計劃

The "Repositioning and Long Term Operation Plan of Ocean Park" (hereinafter known as the "Project") will be implemented by the Ocean Park Corporation at its existing site of Ocean Park, Aberdeen. The current Ocean Park is an exempted designated project under Part 1, Schedule 2, Item O.8 of the Environmental Impact Assessment Ordinance (EIAO), as it was already in existence before the enactment of the EIAO. The Project involves both reconstruction/ modification of existing facilities and expansion of the Park and therefore requires an Environmental Permit for construction and operation.

 
The project concerns expansion and redevelopment at the existing Ocean Park site. The objective of the theme park designers was to work as much as possible within the existing park footprint to seek improvements and upgrades in facilities and visitor attractions. Where the park usage area is planned to expand, the design has attempted to incorporate and work with the opportunities and constraints provided by the site location and topography. For instance, the alternative Headland (“Summit”) access provided by the proposed funicular railway will be aligned in tunnel to avoid environmental impact.
 

Title of Designated Project

Repositioning and Long Term Operation Plan of Ocean Park

(This designated project is hereafter referred to as "the Project")

Nature of Designated Project

The Project will involve a theme park with a site area of more than 20 ha in size.

Location of Designated Project

Existing site of Ocean Park and Nam Long Shan, Aberdeen .

Scale and Scope of Designated Project

Expansion of the existing Ocean Park and reconstruction/ modification of its existing facilities.

 

Location(s) / Alignment(s) of this Project:

Figure 1: Location of Project
Dredging at Seabed of Peng Chau, Tung Wan Gas-fired Power Station Extension at Lamma Kam Tin Secondary Drainage Channels KT13 Hong Kong Wetland Park Sheung Shui to Lok Ma Chau Spurline Sai Kung Drainage Improvement Repositioning and Long Term Operation Plan of Ocean Park KCRC East Rail Extension New Boundary Bridge between Lok Ma Chau and Huanggang Sheung Shui to Lok Ma Chau Spurline (Habitat Creation and Management Plan) background