Active Designated Projects

[Home] [Search by District]

Major Project List: disclaimers
copyright
 
  •  
Central Kowloon Route
  •  
Central Police Station Compound Conservation and Revitalisation
  •  
Central Reclamation Phase III - Studies, Site Investigation, Design and Construction
  •  
Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
  •  
Development of a Bathing Beach at Lung Mei, Tai Po
  •  
Expansion of Hong Kong International Airport into a Three-Runway System
  •  
Fill Bank at Tseung Kwan O Area 137
  •  
Harbour Area Treatment Scheme (HATS) - Stage 2A
  •  
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities
  •  
Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highways Connection
  •  
Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link
  •  
Improvement to Sharp Bend of Keung Shan Road near Shek Pik Reservoir Service Access Road
  •  
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works - Designs and Construction
  •  
Installation of one additional gas-fired generation unit (CCGT Unit No.1) at the Black Point Power Station
  •  
Kai Tak Development
  •  
Kai Tak Development – Roads D3A & D4A
  •  
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
  •  
MTR Tsim Sha Tsui Station Carnarvon Subway and Entrances Modification Works
  •  
MTR Wan Chai Station Lee Tung Street Subway
  •  
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area
  •  
North East New Territories New Development Areas
  •  
Organic Waste Treatment Facilities, Phase I
  •  
Planning and Engineering Feasibility Study for Development at Anderson Road
  •  
Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
  •  
Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
  •  
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1
  •  
Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert
  •  
Reprovision of Bridges D1 and T in West Kowloon
  •  
Reprovisioning of FEHD Sai Yee Street Environmental Hygiene Offices-cum-vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
  •  
Road Works at West Kowloon
  •  
Shatin to Central Link
  •  
Tai Shue Wan Development at Ocean Park
  •  
  •  
  •  
  •  
Tuen Mun Sewerage - Eastern Coastal Sewerage Extension
  •  
Upgrading and expansion of San Wai Sewage Treatment Works and Expansion of Ha Tsuen Pumping Station
  •  
Wan Chai Development Phase II and Central-Wan Chai Bypass
  •  
West Kowloon Cultural District
  •  
Widening of Tolo Highway / Fanling between Island House and Fanling Highway Investigation and Preliminary Design
Last revision date: xxx