List of Appendices
Appendix 2.1 Typical Section of Preliminary Reclamation Proposal
Appendix 2.2 Proposed Reclamation Extent and General Sequence
Appendix 2.3 Tentative Construction Programme
Appendix 3.1 Traffic Forecast for Air Quality Assessment
Appendix 3.2 EMFAC-HK Model Assumptions
Appendix 3.3 Traffic Profile and Section of Open Road
Appendix 3.4 Detailed Calculation of Portal Emissions
Appendix 3.5 Detailed Calculation of Emissions Associated with PTI,
Bus Depots, HGV and Coach Parking Sites
Appendix 3.6 Detailed Calculation of Marine Emissions
Appendix 3.7 Detailed Calculation of Industrial Emissions
Appendix 3.8 Determination of Surface Characteristics Parameters for
AERMET
Appendix 3.9 Derivation of Cumulative Annual Average NOx to NO2
Conversion Equation using Jenkin Method
Appendix 3.10 Detailed Assessment Results under Without Project Scenario
Appendix 3.11 Detailed Assessment Results under With Project (Without
Direct Noise Remedies) Scenario
Appendix 3.12 Detailed Assessment Results under With Project (With Direct
Noise Remedies) Scenario
Appendix 3.13 Comparison between With Project (With Direct Noise
Remedies) Scenario and Without Project Scenario
Appendix 3.14 Comparison between With Project (With Direct Noise
Remedies) Scenario and With Project (Without Direct Noise Remedies) Scenario
Appendix 4.1 Traffic Forecast for Traffic Noise Impact Assessment
Appendix 4.2 Predicted Traffic Noise Levels at Representative NSRs
(Unmitigated)
Appendix 4.3 Predicted Traffic Noise Levels at Representative NSRs
(Mitigated)
Appendix 4.4 Construction Programme and Tentative Phasing of
Construction Works
Appendix 4.5 Construction Plant Inventories
Appendix 4.6 Section of Typical Temporary Noise Barrier and Temporary
Noise Enclosure
Appendix 4.7 Construction Noise Impact Assessment – Unmitigated
Scenario
Appendix 4.8 Construction Noise Impact Assessment – Mitigated Scenario
Appendix 4.9 Cumulative Mitigated Construction Noise Impact Assessment
Results
Appendix 5.1 Water Quality Modelling Plan
Appendix 5.2 Model Validation and Verification
Appendix 5.3 Sediment Release Rate Calculation
Appendix 5.4 Water Quality Modelling Results (Construction Phase)
Appendix 5.5 Hydrodynamic Modelling Results (Operational Phase)
Appendix 5.6 Elutriate and Pore Water Testing
Appendix 6.1 Sediment Sampling and Testing Plan (SSTP)
Appendix 6.2 Management of Dredged/Excavation Sediment
Appendix 6.3 Summary of Chemical Screening Results
Appendix 6.4 Summary
of Biological Screening Results
Appendix 6.5 Laboratory
Analytical Report (Chemical Screening)
Appendix 6.6 Laboratory
Analytical Report (Biological Screening)
Appendix 6.7 Details
of Sediment Quantity Estimation
Appendix 6.8 Photo of Dump Truck and Barge
Appendix 7.1 Contamination Assessment Plan (CAP)
Appendix 8.1 Rapid Ecological Assessment
Appendix 8.2 Representative Photographs of Habitat Types Recorded
within the Assessment Area
Appendix 8.3 Flora Species Recorded within the Assessment Area
Appendix 8.4 Representative Photographs of Species of Conservation
Importance Recorded within the Assessment Area
Appendix 8.5 Terrestrial Fauna Species Recorded within the Assessment
Area
Appendix 8.6 PAM Survey Records
Appendix 8.7 Marine Fauna Species Recorded Wtihin the Assessment Area
Appendix 8.8 Data Recorded during Intertidal Surveys within the
Assessment Area during Both Dry and Wet Seasons
Appendix 8.9 Benthos Survey Results (Abundance and Biomass) for Both
Dry and Wet Season
Appendix 10.1 Aerial Photos and Historic Maps, Charts and Drawings
Reviewed
Appendix 10.2 Built Heritage and Other Identified Item Recording
Sheets
Appendix 10.3 Marine Archaeological Investigation Report
Appendix 11.1 Hazard to Life Assessment for Organic Resource Recovery
Centre Phase I
Appendix 11.2 Hazard to Life Assessment for Sham Shui Kok Transshipment
Dock
Appendix 12.1 Broad Brush Tree Survey
Appendix 12.2 Tree Survey Schedule
Appendix 12.3 Tree Group Photos
Appendix 15.1 Key Assumptions and Limitations
Appendix 15.2 Summary of Environmental Impacts