Development of Tseung Kwan O Area 137 and
Associated Reclamation Sites –
Investigation Design and Construction
Table of Content
|
List of
Figures |
|
|
|
|
|
Project
Location Plan |
|
|
Location of
Designated Projects (Sheet 1 of 2) |
|
|
Location of
Designated Projects (Sheet 2 of 2) |
|
|
Current Outline Zoning
Plan of TKO 137 |
|
|
Preliminary Land Use of
Land to be Created off TKO 132 |
|
|
Land Requirement Plan for TKO 132 |
|
|
Recommended Outline Development Plan of TKO
137 |
|
|
Recommended Outline Development Plan of TKO
132 |
|
|
Preliminary Outline Development Plan - TKO
Area 137 |
|
|
Preliminary Outline Development Plan –
Reclaimed land off TKO Area 132 |
|
|
Reclamation Extent at TKO 137 |
|
|
Reclamation Extent at TKO 132 |
|
|
Location Plan of TKO 137 Effluent Polishing Plant |
|
|
Schematic Layout of TKO 137 Effluent Polishing Plant |
|
|
General
Layout – Works at TKO 137 |
|
|
General
Layout – Works at TKO 132 |
|
|
Locations of Concurrent Projects |
|
|
Locations of Representative Air Sensitive Receivers at TKO 137
(Construction Phase) |
|
|
Locations of Representative Air Sensitive Receivers at TKO 132
(Construction Phase) |
|
|
Locations
of Representative Air Sensitive Receivers at TKO 137 (Operation Phase) |
|
|
Locations
of Representative Air Sensitive Receivers at TKO 132 (Operation Phase) |
|
|
Contour of Predicted 10th Highest
Cumulative Daily RSP Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted 10th Highest
Cumulative Daily RSP Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual RSP Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual RSP Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted 19th Highest
Cumulative Daily FSP Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted 19th Highest
Cumulative Daily FSP Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual FSP Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual FSP Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted 19th Highest
Cumulative Hourly NO2 Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted 19th Highest
Cumulative Hourly NO2 Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted 10th Highest
Cumulative Daily NO2 Concentration at 10 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted 10th Highest
Cumulative Daily NO2 Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contour of Predicted 10th Highest
Cumulative Daily NO2 Concentration at 10 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual NO2 Concentration at 1.5 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted Cumulative
Annual NO2 Concentration at 1.5 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted 4th Highest
Cumulative 10-Min SO2 Concentration at 1.5 mAG at TKO 137 (µg/m3)
|
|
|
Contour of Predicted 4th Highest
Cumulative 10-Min SO2 Concentration at 1.5 mAG at TKO 132 (µg/m3)
|
|
|
Contour of Predicted 4th Highest
Cumulative Daily SO2 Concentration at 10 mAG at TKO 137 (µg/m3) |
|
|
Contour of Predicted 4th Highest
Cumulative Daily SO2 Concentration at 10 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted 4th Highest
Cumulative Daily SO2 Concentration at 15 mAG at TKO 132 (µg/m3) |
|
|
Contour of Predicted Highest
Cumulative Hourly CO Concentration at 140 mAG (µg/m3) at TKO 137 |
|
|
Contour of Predicted Highest
Cumulative Hourly CO Concentration at 1.5 mAG (µg/m3) at TKO 132 |
|
|
Contour of Predicted Highest
Cumulative 8-Hourly CO Concentration at 1.5 mAG (µg/m3) at TKO 137 |
|
|
Contour of Predicted Highest
Cumulative 8-Hourly CO Concentration at 1.5 mAG (µg/m3) at TKO 132 |
|
|
Contour of Predicted Highest
Cumulative Daily CO Concentration at 10 mAG (µg/m3) at TKO 137 |
|
|
Contour of Predicted Highest
Cumulative Daily CO Concentration at 1.5 mAG (µg/m3) at TKO 132 |
|
|
Contour of Predicted Highest
Cumulative 5-Second Odour Concentration at 1.5 mAG at TKO 137 (OU/m3) |
|
|
Contour of Predicted Highest
Cumulative 5-Second Odour Concentration at 1.5 mAG at TKO 132 (OU/m3) |
|
|
Noise
Assessment Area and Locations of NSRs for Construction Noise at TKO 132 |
|
|
Noise Assessment Area and Locations of NSRs for Road Traffic and Fixed
Noise at TKO 132 |
|
|
Noise Assessment Area and Locations of NSRs for Construction, Road
Traffic, Fixed and Rail Noise at TKO 137 |
|
|
Noise Assessment Area and Locations of NSRs for Marine Traffic Noise
at TKO 132 and TKO 137 |
|
|
Locations of Noise Measurement Points for Fixed Noise Source and
Marine Traffic Noise Assessment |
|
|
Locations of NAPs for Construction Noise at TKO 132 |
|
|
Locations of NAPs for Construction Noise at TKO 137 |
|
|
Locations of NAPs for Fixed Noise at TKO 132 |
|
|
Locations of NAPs for Fixed Noise at TKO 137 |
|
|
Locations of NAPs for Rail Noise at TKO 137 |
|
|
Locations of NAPs for Road Traffic Noise at TKO 132 |
|
|
Locations of NAPs for Road Traffic Noise at TKO 137 |
|
|
Locations of NAPs for Marine Traffic Noise at TKO 132 and TKO 137 |
|
|
Project Road Extent at TKO 132 |
|
|
Project Road Extent at TKO 137 |
|
|
Optimised Road Traffic Noise Mitigation Measures at TKO 137 |
|
|
Water Sensitive Receivers |
|
|
Layout Plan of TKO 137 EPP |
|
|
Location Plan of Temporary Stockpiling Areas and Barging Points with
Conveyors at TKO 137 |
|
|
Location Plan of Temporary Stockpiling Areas and Barging Points with
Conveyors at TKO 132 |
|
|
As-built Sediment
Sampling Locations (TKO 137) |
|
|
As-built Sediment Sampling Locations (TKO 132) |
|
|
Locations of Chemical Waste Producers (TKO 137) |
|
|
Locations of Chemical Waste Producers (TKO 132) |
|
|
Locations of Incident Records (Sheet 1 of 3) |
|
|
Locations of Incident Records (Sheet 2 of 3) |
|
|
Locations of Incident Records (Sheet 3 of 3) |
|
|
Areas with Potential Land Contamination Concerns |
|
|
Concerned Area and Sampling Locations (Site S1) |
|
|
Assessment Area for Terrestrial Ecology and Ecological Survey
Locations |
|
|
Previous Relevant Studies and Location of Species of Conservation
Importance from Previous Studies (Key Plan) |
|
|
Previous Relevant Studies and Location of Species of Conservation
Importance from Previous Studies (Sheet 1 of 2) |
|
|
Previous Relevant Studies and Location of Species of Conservation
Importance from Previous Studies (Sheet 2 of 2) |
|
|
Previous Relevant Studies and Location of Species of Conservation
Importance from Previous Studies |
|
|
Marine Ecological Sensitive Receivers within and in Vicinity of the
Assessment Areas |
|
|
Transects and Sampling Locations for Marine Ecological Surveys |
|
|
Habitat Map and Location of Species of Conservation Importance from
Recent Surveys (Key Plan) |
|
|
Habitat
Map and Location of Species of Conservation Importance from Recent Surveys
(Sheet 1 of 2) |
|
|
Habitat
Map and Location of Species of Conservation Importance from Recent Surveys
(Sheet 2 of 2) |
|
|
Habitat
Map and Location of Species of Conservation Importance from Recent Surveys
(Sheet 1 of 2) |
|
|
Habitat
Map and Location of Species of Conservation Importance from Recent Surveys
(Sheet 2 of 2) |
|
|
Permanently and Temporarily Affected Area (TKO 137) |
|
|
Permanently and Temporarily Affected Area (TKO 132) |
|
|
Key
Land-based Construction Works and Marine Works in TKO 132 |
|
|
Key
Land-based Construction Works and Marine Works in TKO 137 |
|
|
Locations of Fisheries Sensitive Receivers |
|
|
Locations of Fisheries Field Survey |
|
|
Distribution of Fishing Operation – Overall (AFCD Port Survey 2021) |
|
|
Distribution of Fishing Operation – Sampan (AFCD Port Survey 2021) |
|
|
Distribution of Fishing Operation – Other Types of Fishing Vessels
(AFCD Port Survey 2021) |
|
|
Distribution of Fisheries Production – Overall (AFCD Port Survey 2021) |
|
|
Results of Vessel Survey |
|
|
Project Boundary for Landscape and Visual Impact
Assessment |
|
|
Landscape Impact Study Boundary – Construction Phase |
|
|
Landscape Resources |
|
|
Photographs of Landscape Resources (Sheet 1 of 2) |
|
|
Photographs of Landscape Resources (Sheet 2 of 2) |
|
|
Landscape Resource Impact Plan |
|
|
Landscape Character Areas |
|
|
Photographs of Landscape Character Areas (Sheet 1 of
2) |
|
|
Photographs of Landscape Character Areas (Sheet 2 of
2) |
|
|
Landscape
Character Area Impact Plan |
|
|
Visual Envelope and Key Public Viewpoints |
|
|
VP1 Photomontage |
|
|
VP2A
Photomontage |
|
|
VP2B Photomontage |
|
|
VP3 Photomontage |
|
|
VP4 Photomontage |
|
|
VP5 Photomontage |
|
|
VP6 Photomontage |
|
|
VP7 Photomontage |
|
|
VP8 Photomontage |
|
|
VP9 Photomontage |
|
|
VP10 Photomontage |
|
|
VP11A Photomontage |
|
|
VP11B Photomontage |
|
|
VP12 Photomontage |
|
|
Visual Impact Plan |
|
|
Key Landscape and Visual Mitigation Plan |
|
|
Landscape and Visual Mitigation Plan (Overall) – TKO
137 |
|
|
Landscape and Visual Mitigation Part Plan (1) for DP
2 and DP 3 in TKO 137 (Sheet 1 of 2) |
|
|
Landscape and Visual Mitigation Part Plan (2) for DP
2 and DP 3 in TKO 137 (Sheet 2 of 2) |
|
|
Landscape and Visual Mitigation Plan (Overall) – TKO
132 |
|
|
Landscape and Visual Mitigation Part Plan (1) for DP
1, DP2, DP4, DP5 and DP6 in TKO 132 (Sheet 1 of 3) |
|
|
Landscape and Visual Mitigation Part Plan (2) for DP
1, DP2, DP4, DP5 and DP6 in TKO 132 (Sheet 2 of 3) |
|
|
Landscape and Visual Mitigation Part Plan (3) for DP
1, DP2, DP4, DP5 and DP6 in TKO 132 (Sheet 3 of 3) |
|
|
Landscape and Visual Mitigation Section |
|
|
Landscape and Visual Mitigation Section |
|
|
Old
Aerial Photo of the Project (1982) |
|
|
Geological Map
of TKO 137 |
|
|
Geological Map
of TKO 132 |
|
|
Terrestrial
Archaeological Background of the Assessment Area Key Plan |
|
|
Terrestrial
Archaeological Background of the Assessment Area (TKO 137) |
|
|
Terrestrial
Archaeological Background of the Assessment Area (TKO 132) |
|
|
Marine Archaeology Background of the
Assessment Area (TKO 137) |
|
|
Marine Archaeology Background of the
Assessment Area (TKO 132) |
|
|
Location of
Built Heritage and Other Identified Items (TKO 132) |
|
|
Location of Archaeological
Heritage in relation to the RODP (TKO 137)
|
|
|
Gradient of TKO
132 |
|
|
Construction Works in the Vicinity of Fat Tau Chau House Ruin SAI |
|
|
Locations of
the Archaeological Exclusion Zones (AEZs) |
|
|
Location Plan Of South East New Territories Landfill and Its Extension |
|
|
Location Plan of
Designated Project 1 (DP1) – Marine Viaduct |
|
|
Location Plan of Designated Project 2 (DP2) – Reclamation at TKO 137
and TKO 132 |
|
|
Location Plan of Designated Project 3 (DP3) – Effluent Polishing Plant |
|
|
|
|
|
|
|
|
|
|