Environmental Permit No. FEP-01 /652/2024
Àô¹Ò³\¥iÃÒ½s¸¹FEP-01 /652/2024


Link to Project EIA
Information
¶µ¥ØÀôµû¸ê®Æ³sµ²
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

SECTIONS 10 AND 12

Àô¹Ò¼vÅTµû¦ô±ø¨Ò

(²Ä499³¹)

²Ä10±ø¤Î12±ø

 

FURTHER ENVIRONMENTAL PERMIT TO DECOMMISSION

A DESIGNATED PROJECT

¸Ñ°£¹B§@«ü©w¤uµ{¶µ¥Øªº·sªºÀô¹Ò³\¥iÃÒ

 

PART A (MAIN PERMIT)

A³¡ (³\¥iÃÒ¥D­n³¡¤À)

 

Pursuant to Sections 10 and 12 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) grants this Further Environmental Permit to the HONG KONG RESOURCES RECOVERY PARK (hereinafter referred to as the ¡§Permit Holder¡¨) to decommission the designated project described in Part B subject to the conditions specified in Part C. The issue of this Further Environmental Permit is based on the documents, approvals or permissions described below:

®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) ²Ä10¤Î12±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»·sªºÀô¹Ò³\¥iÃҧ天­»´ä¸ê·½´_¨|¶é (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¥H¸Ñ°£¹B§@B³¡ ©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡ ©Ò¦C©úªº±ø¥ó¡C¥»·sªºÀô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§å­ã©Î³\¥i§@¬°®Ú¾Ú¡R

Application No.

¥Ó½Ð®Ñ½s¸¹

FEP-227/2025

Document in the Register:

µn°O¥U¤Wªº¤å¥ó¡G

 

(1)  Project Profile ¡V Decommissioning of West Ash Lagoon in Tsang Tsui (Register No. PP-673/2024)

¤uµ{¶µ¥ØÂ²¤¶¡V´¿©C¦è³¡·Ñ¦Ç´òªº¸Ñ°£¹B§@¤uµ{(µn°O¥U½s¸¹¡GPP-673/2024)

 

(2)  The Director¡¦s letter of permission to apply directly for Environmental Permit dated 30 August 2024 (Reference: EP2/N4/G/149)

¸pªø©ó2024¦~8¤ë30¤éµo¥X­ã³\ª½±µ¥Ó½ÐÀô¹Ò³\¥iÃÒªº«H¥ó (ÀÉ®×½s¸¹¡GEP2/N4/G/149)

 

(3)  Application for Environmental Permit submitted on

4 September 2024 (Application No.: AEP-652/2024)

©ó2024¦~9¤ë4¤é ´£¥æªºÀô¹Ò³\¥iÃҥӽФå¥ó (¥Ó½Ð®Ñ½s¸¹: AEP-652/2024)

 

(4)  Environmental Permit issued on 6 September 2024 (Permit No. EP-652/2024)

©ó2024¦~9¤ë6¤éñµoªºÀô¹Ò³\¥iÃÒ(³\¥iÃÒ½s¸¹: EP-652/2024)

 

(5)  Application for Further Environmental Permit submitted on 9 May 2025 (Application No. FEP-227/2025)

©ó2025¦~5¤ë9¤é´£¥æªº·sªºÀô¹Ò³\¥iÃҥӽФå¥ó(¥Ó½Ð®Ñ½s¸¹¡GFEP-227/2025)

 

 

 

                         May 2025

               2025¦~5¤ë      ¤é

Date

¤é´Á

 

(Ms. Clara U)

Principal Environmental Protection Officer

  for Director of Environmental Protection

Àô¹Ò«OÅ@¸p¸pªø

(­º®uÀô¹Ò«OÅ@¥D¥ô§EÀAµØ¥N¦æ)


PART B (DESCRIPTION OF DESIGNATED PROJECT)

B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)

 

Hereunder is the description of the designated project mentioned in Part A of this further environmental permit (hereinafter referred to as the ¡§Permit¡¨):

¤U¦C¬°¥»·sªºÀô¹Ò³\¥iÃÒ (¤UºÙ¡§³\¥iÃÒ¡¨) A³¡ ©Ò´£­zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú¡R

 

Title of Designated Project

«ü©w¤uµ{¶µ¥Øªº¦WºÙ

Decommissioning of West Ash Lagoon in Tsang Tsui [This designated project is hereafter referred to as ¡§the Project¡¨]

 

´¿©C¦è³¡·Ñ¦Ç´òªº¸Ñ°£¹B§@¤uµ{

[¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ ¡§¤uµ{¶µ¥Ø¡¨]

 

Nature of Designated Project
«ü©w¤uµ{¶µ¥Øªº©Ê½è

Decommissioning of a waste disposal facility for pulverised fuel ash

 

¸Ñ°£³B¸m¯»ª¬ªº¿U®Æ¦Çªº¼oª«³B¸m³]¬Iªº¹B§@

 

Location of Designated Project

«ü©w¤uµ{¶µ¥Øªº¦aÂI

The Project is located at Tsang Tsui. The location of the Project is shown in Figure 1 of this Permit.

 

¤uµ{¶µ¥Ø¦ì©ó´¿©C¡C¤uµ{¶µ¥Øªº¦ì¸m¸ü©ó¥»³\¥iÃÒ¹Ï1¡C

 

Scale and Scope of Designated Project

«ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò

 

Decommissioning of West Ash Lagoon at Tsang Tsui, Tuen Mun as indicated in Figure 1.

 

¸Ñ°£¦p¹Ï1©Ò¥Üªº¤Ùªù´¿©C¦è³¡·Ñ¦Ç´òªº¹B§@¡C


PART C (PERMIT CONDITIONS)

C³¡ (³\¥iÃÒ±ø¥ó)

 

1.         General Conditions

            ¤@¯ë±ø¥ó

 

1.1       The Permit Holder and any person decommissioning the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of appropriate action being taken under the EIAO.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó¸Ñ°£¹B§@¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) (²Ä499³¹) ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C

 

1.2       The Permit Holder and any person decommissioning the Project shall ensure full compliance with all legislation from time to time in force including, without limitation to, the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Dumping at Sea Ordinance (Cap. 466) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself constitute any ground of defence against any proceedings instituted under any legislation or imply any approval under any legislation.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó¸Ñ°£¹B§@¤uµ{¶µ¥Øªº¤H¤h¶·½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£­­©ó¡m¾¸­µºÞ¨î±ø¨Ò¡n(²Ä400³¹) ¡B¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä311³¹)¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä358³¹) ¡B¡m®ü¤W¶É­Ëª«®Æ±ø¨Ò¡n(²Ä466³¹) ¤Î¡m¼oª«³B¸m±ø¨Ò¡n(²Ä354³¹)¡C¥»³\¥iÃÒ¥»¨­¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£¥Xªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§å­ã¡C

 

1.3       The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit and the documents referred to in Part A of this Permit readily available at all times for inspection by the Director or his authorised officers at all sites covered by this Permit. Any reference to this Permit shall include all documents referred to in this Permit and also the relevant documents in the Register.

³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡ ©Ò­z¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤H­û¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¬d¾\¡C¤Z´£­z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C

 

1.4       The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit. The site(s) refers to site(s) of the Project and shall mean the same hereafter.

³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªº­t³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C

 

1.5       The Permit Holder shall display conspicuously a copy of this Permit on the site(s) at all vehicular site entrances/exits or at a convenient location for public¡¦s information at all times. The Permit Holder shall ensure that the most updated information about this Permit, including any amended Permit, is displayed at such locations.  If the Permit Holder surrenders a part or the whole of this Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit.  The suspended, varied or cancelled Permit shall be removed from display at the site(s).

³\¥iÃÒ«ù¦³¤H¶·¦b¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g­×­qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^¥»³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³­ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C

 

1.6       The Permit Holder and any person decommissioning the Project shall decommission the Project in accordance with the project description in Part B of this Permit.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó¸Ñ°£¹B§@¤uµ{¶µ¥Øªº¤H¤h¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A¸Ñ°£¹B§@¤uµ{¶µ¥Ø¡C

 

1.7       The Permit Holder and any person decommissioning the Project shall ensure that the Project is decommissioned in accordance with the information and recommendations described in the Project Profile (Register No.: PP-673/2024); the application documents for environmental permits; other relevant document in the Register; the information and mitigation measures described in this Permit; mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project.  Where recommendations referred to in the application documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded in this Permit or otherwise agreed by the Director.      

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó¸Ñ°£¹B§@¤uµ{¶µ¥Øªº¤H¤h¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤U­z¸ê®Æ¸Ñ°£¹B§@¡G¤uµ{¶µ¥ØÂ²¤¶¡]µn°O¥U½s¸¹¡GPP-673/2024¡^©Ò»¡©úªº¸ê®Æ¤Î¬ÛÃö«ØÄ³¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ¤Î½w¸Ñ±¹¬I¡F®Ú¾Ú¥»³\¥iÃÒ©Ò¸üªº±ø¥ó¶·´£¥æ¤©¸pªø¦s©ñ©ÎÀò¸pªø§å­ãªº¤å¥ó©Ò«ØÄ³ªº½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«ØÄ³ªº½w¸Ñ±¹¬I¡Cµn°O¥U¤ºªº¥Ó½Ð¤å¥ó©Ò­z«ØÄ³¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«ØÄ³¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁŰ£©Î¥tÀò¸pªø¦P·N¡C

 

1.8       All submissions, as required under this Permit, shall be rectified and resubmitted in accordance with the comments, if any, made by the Director within one month of the receipt of the Director¡¦s comments or otherwise as specified by the Director.

©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó¡A¶·¦b±µÀò¸pªøªº·N¨£¡]¦p¦³ªÌ¡^«á1­Ó¤ë¤º©Î¸pªø¥t¦æ«ü©wªº´Á­­¤º¡A®Ú¾Ú¸pªøªº·N¨£¥[¥H­×¥¿¤Î­«·s´£¥æ¡C

 

1.9       All submissions approved by the Director, all submissions deposited without comments by the Director, or all submissions rectified in accordance with comments by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the EIAO (Cap. 499). All submissions or any variation of submissions shall be verified by the Independent Environmental Checker (IEC) referred to in Condition 2.1 below before submitting to the Director under this Permit.

©Ò¦³´£¥æ¸pªø¨ÃÀò§å­ãªº¤å¥ó¡B©Ò¦³´£¥æ¸pªø¦s©ñ¦Ó¨S¦³¦¬¨ì¸pªø·N¨£ªº¤å¥ó©Î®Ú¾Ú¥»³\¥iÃÒ´£¥æ¨Ã¤w¨Ì·Ó¸pªøªº·N¨£§@¥X­×­qªº©Ò¦³¤å¥ó¡A±N¸àÄÀ¬°¥»³\¥iÃÒC³¡ ©Ò»¡©úªº³\¥iÃÒ±ø¥óªº¤@³¡¤À¡C¹ï´£¥æ¤å¥ó©Ò§@ªº¥ô¦ó­×­q¡A§¡¶·Àò±o¸pªøªº®Ñ­±§å­ã¡A©Î²Å¦X¦³Ãö³\¥iÃÒ±ø¥ó©Ò­z¡C¤Z»P©Ò´£¥æªº¤å¥ó¦³¤£²Å¦Xªº±¡ªp¡A§¡¥i¯àºc¦¨¹H¤ÏÀôµû±ø¨Ò (²Ä499³¹)¡C©Ò¦³´£¥æ¤å¥ó©Î´£¥æ¤å¥óªº¥ô¦ó­×­q¥»¡A§¡¶·«ö¤U¤å±ø¥ó²Ä2.1¶µ©Ò­zªº¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AµM«á¤~«ö¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æ¡C

 

1.10     The Permit Holder shall release all finalised submissions as required under this Permit to the public by depositing copies in the Environmental Impact Assessment Ordinance Register Office, or in any other places, or any internet websites as specified by the Director, or by any means as specified by the Director, for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of the submissions.

³\¥iÃÒ«ù¦³¤H¶·§â©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Z¤½¶}µ¹¤½²³¤H¤hª¾¹D¡A¤èªk¬O§â¦³Ãö¤å¥ó½Æ¥»¦s©ñ©óÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¦a¤è¡A©Î¸pªø«ü©wªº¥ô¦ó¤¬Ápºôºô¯¸¡A©Î¸pªø«ü©wªº¥ô¦ó¤èªk¡A¥H¨Ñ¤½²³¬d¾\¡C¬°¦¹¡A³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¨¬°÷¼Æ¶qªº½Æ¥»¡C

 

1.11     The Permit Holder shall submit and / or deposit all submissions within the time as specified in the Conditions of this Permit. All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalised submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 1.3 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

³\¥iÃÒ«ù¦³¤H¶·¦b¥»³\¥iÃÒ±ø¥ó©Ò¦C©úªº®É¶¡¤º¡A´£¥æ¤Î/©Î¦s©ñ©Ò¦³¤å¥ó¡C¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æªº©Ò¦³¤å¥ó¡A¶·¿Ë¨­°e¥æ©Î¥H±¾¸¹¤è¦¡¶l±H¦ÜÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡]²{§}¬°¡G­»´äÆW¥J°a¥§¸Ö¹D130¸¹­×¹y¤¤¤ß27¼Ó¡^¡C©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Zªº¹q¤l½Æ¥»¡A§¡¶·¥H¶W¤å¥»¼Ð¥Ü»y¨¥(HTML)(²Ä4.0©Î¸û«áª©¥»)©M«KÄ⦡¤å¥ó®æ¦¡(PDF)(²Ä1.3©Î¸û«áª©¥»)»s§@¡A°£«D¥tÀò¸pªø¦P·N¡A¹q¤l½Æ¥»¶·»Pµw½Æ¥»¦P®É´£¥æ¡C

 

1.12     The Permit Holder shall notify the Director in writing the commencement date of decommissioning works of the Project no later than 1 month prior to the commencement of decommissioning works of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the decommissioning works.

³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¸Ñ°£¹B§@¤uµ{®i¶}«e³Ì¤Ö1­Ó¤ë¡A¥H®Ñ­±¤è¦¡§â¤uµ{¶µ¥Ø¸Ñ°£¹B§@¤uµ{ªº®i¶}¤é´Á³qª¾¸pªø¡C¸Ñ°£¹B§@¤uµ{ªº®i¶}¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ­±¤è¦¡³qª¾¸pªø¡C

 

1.13     For the purpose of this Permit, ¡§commencement of decommissioning works¡¨ does not include works related to site clearance and preparation, or other works as agreed by the Director.

¬°°õ¦æ¥»³\¥iÃÒ¡A¡u¸Ñ°£¹B§@¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C

 

 

 

 

 

2.         Specific Conditions

¯S©w±ø¥ó

 

            Employment of Independent Environmental Checker

            ¸u¥Î¿W¥ßÀô¹Ò¬d®Ö¤H

           

2.1       An Independent Environmental Checker (IEC) shall be employed to audit the implementation of the environmental protection measures recommended in the Project Profile (Register No. PP-673/2024), and to report to the Director in writing through an audit report deposited with the Director within 1 month upon completion of the decommissioning works to confirm full implementation of the measures and compliance of the Conditions of this Permit.

¶·¸u½Ð¤@¦W¿W¥ßÀô¹Ò¬d®Ö¤H¡A¥H¼f®Ö¤uµ{¶µ¥ØÂ²¤¶¡]µn°O¥U½s¸¹: PP-673/2024¡^¤¤©Ò«ØÄ³ªºÀô¹Ò«OÅ@±¹¬Iªº°õ¦æ¡A¥H¤Î¦b¸Ñ°£¹B§@¤uµ{§¹¦¨«á¤@­Ó¤ë¤º¥H®Ñ­±§Î¦¡¦V¸pªø¦s©ñ¤@¥÷¼f®Ö³ø§i®Ñ¡A¥H½T©w¦³Ãö±¹¬I¤w§¹¥þ¹ê¬I¤Î²Å¦X¥»³\¥iÃÒªº±ø¥ó¡C

           

            No Excavation within the Site and No Off-Site Disposal of Pulverised Fuel Ash

            ¤£±o©ó¤u¦a¤º¶i¦æ«õ±¸¤Î¤£±o§â¯»ª¬ªº¿U®Æ¦Ç¹BÂ÷¤u¦a±ó¸m

 

2.2       No excavation work shall be conducted within the Project site and no transportation of pulverised fuel ash for disposal off-site unless with the prior written approval of the Director.

            °£«D¨Æ¥ýÀò±o¸pªø®Ñ­±§å­ã¡A§_«h¤£±o¦b¤uµ{¶µ¥Øªº¤u¦a¤º¶i¦æ«õ±¸¤uµ{¡A¥ç¤£±o§â¯»ª¬ªº¿U®Æ¦Ç¹BÂ÷¤u¦a±ó¸m¡C

 

            Covering of Pulverised Fuel Ash

            Âл\¯»ª¬ªº¿U®Æ¦Ç

 

2.3       The levelled pulverised fuel ash surface shall be covered by at least 1m thick general fill.

            ¶·¦b¤w¥­¾ãªº¯»ª¬ªº¿U®Æ¦Çªí­±¡AÂл\³Ì¤Ö1¦Ì«pªº¤@¯ë¶ñ®Æ¡C

           

 

                                                                                        

Notes:

µù¡G

 

1.         This Permit consists of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit Conditions).  Any person relying on this Permit should obtain independent legal advice on the legal implications under the EIAO, and the following notes are for general information only.

¥»³\¥iÃÒ¦@¦³3³¡¡A§Y A³¡ (³\¥iÃÒ¥D­n³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤U­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C

 

2.         If there is a breach of any condition of this Permit, the Director or his authorized officer may, with the consent of the Secretary for Environment and Ecology, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤H­û¼x±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N«á¥i°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤H­û¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C

 

3.         The Permit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the Project site by the amended permit.

³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·¥H¸g­×§ïªº³\¥iÃÒ´À´«¦b¤uµ{¶µ¥Ø¤u¦a¤º®i¥Üªº­ì¦³³\¥iÃÒ¡C

 

4.         A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the EIAO to the Director for a further environmental permit.

©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C

 

5.         Under Section 14 of the EIAO, the Director may with the consent of the Secretary for Environment and Ecology, suspend, vary or cancel this Permit. The suspended, varied or cancelled Permit shall be removed from display at the Project site.

®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦b¨ú±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C

 

6.         If this Permit is cancelled or surrendered during decommissioning of the Project, another environmental permit must be obtained under the EIAO before the Project could be continued.  It is an offence under Section 26(1) of the EIAO to decommission a designated project listed in Part II of Schedule 2 of the EIAO without a valid environmental permit.

¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø¸Ñ°£¹B§@´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U¸Ñ°£¹B§@Àôµû±ø¨Òªþªí2²ÄII³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C

 

7.         Any person who decommissions the Project contrary to the conditions in this Permit, and is convicted of an offence under the EIAO, is liable:

 

(i)                 on a first conviction on indictment to a fine of $2 million and to   imprisonment for 6 months;

(ii)               on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years;

(iii)             on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

(iv)              on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

(v)                in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied the offence continued.

 

¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U¸Ñ°£¹B§@¤uµ{¶µ¥Ø¡A¥B³Qµô©wIJ¥ÇÀôµû±ø例©Ò­q©úªº¸o行¡A§YÄݥǸo¡G

 

(i)                 ¤@¸g´`¤½¶Dµ{§Ç­º¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6­Ó¤ë¡F

(ii)               ¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F

(iii)             ¤@¸g´`²©öµ{§Ç­º¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6­Ó¤ë¡F

(iv)              ¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¥H¤Î

(v)               ¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C

 

8.         The Permit Holder may appeal against any condition of this Permit under Section 17 of the EIAO within 30 days of receipt of this Permit.

³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C

 

9.         The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice.

¤W­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C

 

Environmental Permit No. FEP-01/652/2024

Àô¹Ò³\¥iÃÒ½s¸¹  FEP-01/652/2024