Environmental Permit No. EP-662/2025
Àô¹Ò³\¥iÃÒ½s¸¹EP-662/2025


Link to Project EIA
Information
¶µ¥ØÀôµû¸ê®Æ³sµ²
  ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

SECTION 10

Àô¹Ò¼vÅTµû¦ô±ø¨Ò

(²Ä499³¹)

²Ä10±ø

 

ENVIRONMENTAL PERMIT TO OPERATE

A DESIGNATED PROJECT

Àç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ

 

PART A (MAIN PERMIT)

A³¡ (³\¥iÃÒ¥D­n³¡¤À)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) grants this environmental permit to the Society for the Prevention of Cruelty to Animals (Hong Kong) (hereinafter referred to as the ¡§Permit Holder¡¨) to operate the designated project described in Part B subject to the conditions specified in Part C. The issue of this environmental permit is based on the documents, approvals or permissions described below:

®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) ²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»Àô¹Ò³\¥iÃҧ天­»´ä·RÅ@°Êª«¨ó·| (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¥HÀç¿ì B³¡ ©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡ ©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§å­ã©Î³\¥i§@¬°®Ú¾Ú¡R

 

Application No.

¥Ó½Ð®Ñ½s¸¹

AEP-662/2025

Document in the Register:

µn°O¥U¤Wªº¤å¥ó¡G

 

(1)   Project Profile ¡V Quarantine Service for Society for the Prevention of Cruelty to Animals (SPCA) Jockey Club Centennial Centre (Tsing Yi Centre) at Cheung Fai Road, Tsing Yi (Register No. PP-682/2025)

¤uµ{¶µ¥ØÂ²¤¶-·RÅ@°Êª«¨ó·|¡]·R¨ó¡^Áɰ¨·|¦Ê©P¦~¤¤¤ß¡]«C¦ç¤¤¤ß¡^¦ì©ó«C¦çªø½÷¸ôªºÀˬ̪A°È(µn°O¥U½s¸¹¡GPP-682/2025)

 

(2) The Director¡¦s letter of permission to apply directly for Environmental Permit dated 6 May 2025 (Reference: (15) in EP2/N3/N/77)

¸pªø©ó2025¦~5¤ë 6 ¤éµo¥X§å­ãª½±µ¥Ó½ÐÀô¹Ò³\¥iÃÒªº«H¥ó (ÀÉ®×½s¸¹¡G(15) in EP2/N3/N/77)

 

(3) Application for Environmental Permit submitted on 9 May 2025 (Application No. AEP-662/2025)

©ó2025¦~5¤ë9¤é ´£¥æªºÀô¹Ò³\¥iÃҥӽФå¥ó (¥Ó½Ð®Ñ½s¸¹: AEP-662/2025)

                             

 

 

  3 June 2025

               2025¦~ 6¤ë3¤é

Date

¤é´Á

 

 (Queenie Y. C. NG)

Principal Environmental Protection Officer

    for Director of Environmental Protection

Àô¹Ò«OÅ@¸p¸pªø

(­º®uÀô¹Ò«OÅ@¥D¥ô§d¨J²M¥N¦æ)


PART B (DESCRIPTION OF DESIGNATED PROJECT)

B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):

¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ (¤UºÙ¡§³\¥iÃÒ¡¨) A³¡ ©Ò´£­zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú¡R

 

Title of Designated Project

«ü©w¤uµ{¶µ¥Øªº¦WºÙ

Quarantine Service for Society for the Prevention of Cruelty to Animals (SPCA) Jockey Club Centennial Centre (Tsing Yi Centre) at Cheung Fai Road, Tsing Yi

[This designated project is hereafter referred to as ¡§the Project¡¨]

·RÅ@°Êª«¨ó·|¡]·R¨ó¡^Áɰ¨·|¦Ê©P¦~¤¤¤ß¡]«C¦ç¤¤¤ß¡^¦ì©ó«C¦çªø½÷¸ôªºÀˬ̪A°È

[¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ ¡§¤uµ{¶µ¥Ø¡¨]

 

Nature of Designated Project
«ü©w¤uµ{¶µ¥Øªº©Ê½è

A quarantine station, or quarantine lairage, for animals

(Item N.2 of Part I of Schedule 2 of the EIAO)

¬°°Êª«¦Ó³]ªºÀˬ̯¸©ÎÀˬÌÃö¸T³B

¡]Àôµû±ø¨Òªþªí2²ÄI³¡ªºN.2 ¶µ¡^

 

Location of Designated Project

«ü©w¤uµ{¶µ¥Øªº¦aÂI

The Project is located at Society for the Prevention of Cruelty to Animals (SPCA) Jockey Club Centennial Centre (Tsing Yi Centre). The location of the Project is shown in Figure 1 of this Permit

¤uµ{¶µ¥Ø¦ì©ó·RÅ@°Êª«¨ó·|¡]·R¨ó¡^Áɰ¨·|¦Ê©P¦~¤¤¤ß¡]«C¦ç¤¤¤ß¡^¡C¤uµ{¶µ¥Øªº¦ì¸m®i¥Ü©ó¥»³\¥iÃÒ¹Ï1¡C

 

Scale and Scope of Designated Project

«ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò

 

The Project includes converting the existing boarding rooms on the second floor of the SPCA Jockey Club Centennial Centre (Tsing Yi Centre) at Cheung Fai Road, Tsing Yi into animal quarantine rooms, and operating the animal quarantine rooms.

¤uµ{¶µ¥Ø¥]¬A±N·R¨óÁɰ¨·|¦Ê©P¦~¤¤¤ß¡]«C¦ç¤¤¤ß¡^¤G¼Óªº±H¾i«Ç§ï¬°°Êª«Àˬ̫ǡA¤ÎÀç¿ì¸Ó°Êª«Àˬ̫ǡC

 

 


PART C (PERMIT CONDITIONS)

C³¡ (³\¥iÃÒ±ø¥ó)

 

1.         General Conditions

            ¤@¯ë±ø¥ó

 

1.1       The Permit Holder and any person operating the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of appropriate action being taken under the EIAO.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦óÀç¿ì¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) (²Ä499³¹) ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C

 

1.2       The Permit Holder and any person operating the Project shall ensure full compliance with all legislation from time to time in force including, without limitation to, the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Dumping at Sea Ordinance (Cap. 466) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself constitute any ground of defence against any proceedings instituted under any legislation or imply any approval under any legislation.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦óÀç¿ì¤uµ{¶µ¥Øªº¤H¤h¶·½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£­­©ó¡m¾¸­µºÞ¨î±ø¨Ò¡n(²Ä400³¹) ¡B¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä311³¹)¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä358³¹) ¡B¡m®ü¤W¶É­Ëª«®Æ±ø¨Ò¡n(²Ä466³¹) ¤Î¡m¼oª«³B¸m±ø¨Ò¡n(²Ä354³¹)¡C¥»³\¥iÃÒ¥»¨­¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£¥Xªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§å­ã¡C

 

1.3       The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit and the documents referred to in Part A of this Permit readily available at all times for inspection by the Director or his authorised officers at all sites covered by this Permit. Any reference to this Permit shall include all documents referred to in this Permit and also the relevant documents in the Register.

³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡ ©Ò­z¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤H­û¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¬d¾\¡C¤Z´£­z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C

 

1.4       The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit. The site(s) refers to site(s) of operation of the Project and shall mean the same hereafter.

³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªº­t³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«üÀç¿ì¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C

 

1.6       The Permit Holder and any person operating the Project shall operate the Project in accordance with the project description in Part B of this Permit.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦óÀç¿ì¤uµ{¶µ¥Øªº¤H¤h¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡AÀç¿ì¤uµ{¶µ¥Ø¡C

 

1.7       The Permit Holder and any person operating the Project shall ensure that the Project is operated in accordance with the information and recommendations described in the Project Profile (Register No.: PP-682/2025); the application documents for environmental permits; other relevant document in the Register; the information and mitigation measures described in this Permit; mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project.  Where recommendations referred to in the application documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded in this Permit or otherwise agreed by the Director.      

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦óÀç¿ì¤uµ{¶µ¥Øªº¤H¤h¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤U­z¸ê®ÆÀç¿ì¡G¤uµ{¶µ¥ØÂ²¤¶¡]µn°O¥U½s¸¹¡GPP-682/2025¡^©Ò»¡©úªº¸ê®Æ¤Î¬ÛÃö«ØÄ³¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ¤Î½w¸Ñ±¹¬I¡F®Ú¾Ú¥»³\¥iÃÒ©Ò¸üªº±ø¥ó¶·´£¥æ¤©¸pªø¦s©ñ©ÎÀò¸pªø§å­ãªº¤å¥ó©Ò«ØÄ³ªº½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«ØÄ³ªº½w¸Ñ±¹¬I¡Cµn°O¥U¤ºªº¥Ó½Ð¤å¥ó©Ò­z«ØÄ³¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«ØÄ³¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁŰ£©Î¥tÀò¸pªø¦P·N¡C

 

1.8       The Permit Holder shall notify the Director in writing the commencement date of operation of the Project no later than 1 week prior to the commencement of operation of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of operation.

³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¶}©lÀç¿ì«e³Ì¤Ö1¬P´Á¡A¥H®Ñ­±¤è¦¡§â¤uµ{¶µ¥Ø¶}©lÀç¿ìªº¤é´Á³qª¾¸pªø¡C¶}©lÀç¿ìªº¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¶·¥ß§Y¥H®Ñ­±¤è¦¡³qª¾¸pªø¡C

 

2.         Specific Conditions

¯S©w±ø¥ó

           

2.1       All measures described in the Project Profile (Register No. PP-682/2025) submitted with the application (Application No. DIR-312/2025) on 2 April 2025 shall be fully implemented.

¦b2025¦~4¤ë2¤éÀH¥Ó½Ð®Ñ¡]¥Ó½Ð½s¸¹¡GDIR-312/2025¡^´£¥æªº¤uµ{¶µ¥ØÂ²¤¶¡]µn°O¥U½s¸¹¡GPP-682/2025¡^ ©Ò´y­zªº¤@¤Á±¹¬I§¡¶·¤©¥H¹ý©³°õ¦æ¡C

 

Notes:

µù¡G

 

1.         This Permit consists of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit Conditions).  Any person relying on this Permit should obtain independent legal advice on the legal implications under the EIAO, and the following notes are for general information only.

¥»³\¥iÃÒ¦@¦³3³¡¡A§Y A³¡ (³\¥iÃÒ¥D­n³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤U­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C

 

2.         If there is a breach of any condition of this Permit, the Director or his authorized officer may, with the consent of the Secretary for Environment and Ecology, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤H­û¼x±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N«á¥i°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤H­û¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C

 

3.         The Permit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit by the amended permit.

³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·¥H¸g­×§ïªº³\¥iÃÒ´À´«­ì¦³³\¥iÃÒ¡C

 

4.         A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the EIAO to the Director for a further environmental permit.

©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C

 

5.         Under Section 14 of the EIAO, the Director may with the consent of the Secretary for Environment and Ecology, suspend, vary or cancel this Permit.

®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦b¨ú±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C

 

6.         If this Permit is cancelled or surrendered during operation of the Project, another environmental permit must be obtained under the EIAO before the Project could be continued.  It is an offence under Section 26(1) of the EIAO to operate a designated project listed in Part I of Schedule 2 of the EIAO without a valid environmental permit.

¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥ØÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤UÀç¿ìÀôµû±ø¨Òªþªí2²Ä1³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C

 

7.         Any person who operates the Project contrary to the conditions in this Permit, and is convicted of an offence under the EIAO, is liable:

 

(i)               on a first conviction on indictment to a fine of $2 million and to   imprisonment for 6 months;

(ii)             on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years;

(iii)           on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

(iv)            on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

(v)             in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied the offence continued.

 

¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤UÀç¿ì¤uµ{¶µ¥Ø¡A¥B³Qµô©wIJ¥ÇÀôµû±ø例©Ò­q©úªº¸o行¡A§YÄݥǸo¡G

 

(i)               ¤@¸g´`¤½¶Dµ{§Ç­º¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6­Ó¤ë¡F

(ii)             ¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F

(iii)           ¤@¸g´`²©öµ{§Ç­º¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6­Ó¤ë¡F

(iv)            ¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¥H¤Î

(v)             ¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C

 

8.          The Permit Holder may appeal against any condition of this Permit under Section 17 of the EIAO within 30 days of receipt of this Permit.

³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C

 

9.          The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice.

¤W­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C

 

 

Environmental Permit No. EP-662/2025

Àô¹Ò³\¥iÃÒ½s¸¹  EP-662/2025